[1] BAZANT Z P,WITTMANN F H.Creep and Shrinkage in Concrete Structures[M].New York:John Wiley & Sons,1982:129-358.
[2] GHALI A,FAVRE R.Concrete Structure:Stresses and Deformations[M].New York:Chapman and Hall,1986.
[3] 惠荣炎,黄国兴,易冰若.混凝土的徐变[M].北京:中国铁道出版社,1988.
HUI Rong-yan,HUANG Guo-xing,YI Bing-ruo.Concrete Creep[M].Beijing:China Railway Publishing House,1988.
[4] 周 履,陈永春.收缩徐变[M].北京:中国铁道出版社,1994.
ZHOU Lu,CHEN Yong-chun.Shrinkage and Creep[M].Beijing:China Railway Publishing House,1994.
[5] 杜国华,毛昌时,司徒妙龄.桥梁结构分析[M].上海:同济大学出版社,1994.
DU Guo-hua,MAO Chang-shi,SITU Miao-ling.Analysis of Bridge Structures[M].Shanghai:Tongji University Press,1994.
[6] 王勋文,潘家英.按龄期调整有效模量法中老化系数χ的取值问题[J].中国铁道科学,1996,17(3):12-23.
WANG Xun-wen,PAN Jia-ying.Determination of Aging Coefficients in Age-AdjustedEffective Module Method[J].China Railway Science,1996,17(3):12-23.
[7] 沈蒲生.高层建筑结构疑难释义[M].北京:中国建筑工业出版社,2003.
SHEN Pu-sheng.Explanations for Questions of High-Rise Buildings[M].Beijing:ChinaArchitecture & Building Press,2003.
[8] 陈富生,邱国桦,范 重.高层建筑钢结构设计[M].北京:中国建筑工业出版社,2000.
CHEN Fu-sheng,QIU Guo-hua,FAN Zhong.Design of High-Rise Building Steel Structures[M].Beijing:China Architecture & Building Press,2000.
[9] 赵宪忠.考虑施工因素的钢筋混凝土高层建筑时变反应分析[D].上海:同济大学,2000.
ZHAO Xian-zhong.Time-Dependent Analysis of High-Rise RC Buildings with Construction Imperfection and Procedure Effects[D].Shanghai:Tongji University,2000.
[10] 林 欢.矩阵递推法在高层框架施工模拟计算中的应用[J].建筑结构,1989,19(1):16-21.
LIN Huan.Application of Matrix Sequential Method in the Simulating ConstructionProcess of Tall Frame Structures[J].Building Structure,1989,19(1):16-21.
[11] SAVITA M,ASFAW M,NAGPAL A K. Consistent Procedure for Creep and Shrinkage Effects in RC Frames[J].Journal of Structural Engineering,2001,127(7):726-732.
[12] 郭军庆,王雪韵,雷自学,等.加芯混凝土框架柱轴压比限值试验研究[J].建筑科学与工程学报,2005,22(4):45-49.
GUO Jun-qing,WANG Xue-yun,LEI Zi-xue,et al.Experimental Research on Limit Value of Axial Compression Ratio for Concrete Frame Columns with Central Reinforcement[J].Journal of Architecture and Civil Engineering,2005,22(4):45-49.
[13] ACI 209R-92,Prediction of Creep,Shrinkage and Temperature Effects in Concrete Structures[S].
[14] 沈蒲生,方 辉.高层框架施工过程的模拟分析方法与近似方法的比较[J].建筑结构,2006,36(2):48-50.
SHEN Pu-sheng,FANG Hui.Analysis Method of Tall Frame Building Considering Construction Process Effect[J].Building Structure,2006,36(2):48-50.
[15] 史密斯 B S,库尔 A.高层建筑结构分析与设计[M].北京:地震出版社,1993.
SMITH B S,COULL A.High-Rise Building Structures:Analysis and Design[M].Beijing:Seism Press,1993.