[1] 刘小燕,颜东煌,张 峰,等.预应力高强混凝土梁极限承载力分析[J].中国公路学报,2006,19(1):58-61.
LIU Xiao-yan,YAN Dong-huang,ZHANG Feng,et al.Ultimate Load Analysis of Prestressed High-strength Concrete Beam[J].China Journal of Highway and Transport,2006,19(1):58-61.
[2]周绪红,张微伟,吴方伯,等.预应力混凝土四边简支双向叠合板的设计方法[J].建筑科学与工程学报,2006,23(4):54-57.
ZHOU Xu-hong,ZHANG Wei-wei,WU Fang-bo,et al.Design Method of Prestressed Concrete Simply Supported on Four Sides of Two-way Composite Slab[J].Journal of Architecture and Civil Engineering,2006,23(4):54-57.
[3]黄 侨,郑一峰,李光俊.预弯组合梁非线性全过程分析方法[J].中国公路学报,2006,19(4):88-93.
HUANG Qiao,ZHENG Yi-feng,LI Guang-jun.Nonlinear Whole-course Analysis Method of Preflex Composite Beam[J].China Journal of Highway and Transport,2006,19(4):88-93.
[4]PICARD A,MASSICOTEE B.Relative Efficiency of External Prestressing[J]. Journal of Structural Engineering,1995,121(12):1 832-1 841.
[5]LIN T Y,BURUS N H.Design of Prestressed Concrete Structures[M].3rd ed.New Jersey:John Wiley & Sons,1989.
[6]邵旭东,李立峰,张 伟.二次预应力组合结构试验研究[J].中国公路学报,2006,19(1):75-79.
SHAO Xu-dong,LI Li-feng,ZHANG Wei.Test Study of Double Prestressed Composite Structure[J].China Journal of Highway and Transport,2006,19(1):75-79.
[7]LIN T Y.Secondary Moment and Moment Redistribution in Continuous Prestressed Concrete Beams[J].PCI Journal,1972,17(1):8-20.