[1] 陈宝春,肖泽荣,韦建刚.钢管混凝土哑铃形拱肋灌注混凝土时的截面应力分析[J].中国公路学报,2005,18(1):73-76.
CHEN Bao-chun,XIAO Ze-rong,WEI Jian-gang.Analysis on Stresses of Dumbbell-shaped Cross-section of CFST Arch Rib During Concrete Pouring Construction[J].China Journal of Highway and Transport,2005,18(1):73-76.
[2]李小伟,赵均海,朱铁栋,等.方钢管混凝土轴压短柱的力学性能[J].中国公路学报,2006,19(4):77-81.
LI Xiao-wei,ZHAO Jun-hai,ZHU Tie-dong,et al.Mechanics Behavior of Axially Loaded Short Columns with Concrete-filled Square Steel Tube[J].China Journal of Highway and Transport,2006,19(4):77-81.
[3]韩 冰,王元丰.圆钢管混凝土轴心受压构件徐变分析的比较[J].中国公路学报,2007,20(2):83-86.
HAN Bing,WANG Yuan-feng.Creep Analysis Comparison of Circular Axially Compressed Concrete-filled Steel Tubular Members[J].China Journal of Highway and Transport,2007,20(2):83-86.
[4]赵均海,郭红香,魏雪英.圆中空夹层钢管混凝土柱承载力研究[J].建筑科学与工程学报,2005,22(1):50-54.
ZHAO Jun-hai,GUO Hong-xiang,WEI Xue-ying.Research on Bearing Capacity of Concrete Filled Double Skin Steel Tubes Column[J].Journal of Architecture and Civil Engineering,2005,22(1):50-54.
[5]张建民,郑皆连,肖汝诚.钢管混凝土拱桥吊装过程的最优化计算分析 [J].中国公路学报,2005,18(2):40-44.
ZHANG Jian-min,ZHENG Jie-lian,XIAO Ru-cheng.Calculation Method for Optimizing the Installation Process of Concrete-filled Steel Tube Arch Bridge[J].China Journal of Highway and Transport,2005,18(2):40-44.
[6]宋 兵.考虑自收缩作用时钢管高强混凝土的有限元法分析[J].广州建筑,2003,27(5):13-16.
SONG Bing.An Analysis with Finite Element Theory of High Strength Concrete Filled Steel Tube Considering the Influence of Autogenous Shrinkage[J].Guangzhou Architecture,2003,27(5):13-16.
[7]查晓雄.钢管初应力对钢管混凝土压弯扭构件工作性能影响的理论分析和试验研究[D].哈尔滨:哈尔滨建筑大学,1996.
ZHA Xiao-xiong.Theoretical Analysis and Testing Research on the Influence of Initial Stress of Steel Tube on the Work Performance of Specimens Under Compression and Twist[D].Harbin:Harbin University of Civil Engineering and Architecture,1996.