|Table of Contents|

Finite Element Analysis of Static Work Behavior of SHS Truss with Gapped K-joints(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2007年03期
Page:
25-30
Research Field:
Publishing date:
2007-09-20

Info

Title:
Finite Element Analysis of Static Work Behavior of SHS Truss with Gapped K-joints
Author(s):
WU Zhen-yu WANG Yuan-yang
School of Civil Engineering, Harbin Institute of Technology, Harbin 150090, Heilongjiang, China
Keywords:
gapped K-type joint SHS truss finite element analysis static work behavior
PACS:
TU392.3
DOI:
-
Abstract:
In order to investigate the static work behavior of square hollow section(SHS)truss with gapped K-joints, nonlinear finite element analysis of four trusses which directly welded K-joints was carried out. Making use of finite element analysis software ANSYS, in which four nodes shell element was employed, elastic-plastic large deflection finite element analysis of truss was conducted. Not only the upward and downward phases of the load and displacement curve were traced, but also deformation and plastic development situation of joints were studied. The four truss models of pin-jointed link elements, rigid-jointed beam elements, shell elements as well as shell elements which took weld into account were developed. Axial forces of web bars and chord bars of these four truss models bearing designed load were compared. Besides, the whole stiffness of four different truss models bearing standard load was compared.

References:

[1] 丁玉坤,武振宇,张状南.K型、KK型搭接方管节点的试验研究[J].土木工程学报,2005,38(4):25-31. DING Yu-kun,WU Zhen-yu,ZHANG Zhuang-nan.An Experimental Study on Partially Overlapped SHS K-and KK-joints[J].China Civil Engineering Journal,2005,38(4):25-31.
[2]王素芳,陈以一,陈友泉,等.端板连接高强度螺栓群中和轴位置研究[J].建筑科学与工程学报,2005,22(3):45-54. WANG Su-fang,CHEN Yi-yi,CHEN You-quan,et al.Research on Neutral Axis Location of High-strength Bolts of End-plate Connections[J].Journal of Architecture and Civil Engineering,2005,22(3):45-54.
[3]武振宇,武 胜,张耀春.不等宽K型间隙方管节点承载力计算的塑性铰线法[J].土木工程学报,2004,37(5):1-6. WU Zhen-yu,WU Sheng,ZHANG Yao-chun.Yield Line Method for Calculation of the Load-carrying Capacity of Stepped K-type Gapped RHS-joints[J].China Civil Engineering Journal,2004,37(5):1-6.
[4]王元清,张 勇,石永久,等.吊索与钢管混凝土拱桥新型节点承载性能分析[J].建筑科学与工程学报,2005,22(3):55-58. WANG Yuan-qing,ZHANG Yong,SHI Yong-jiu,et al.Analysis of Load Capacity of New-style Joints Between Cable and Concrete-filled Steel Tube Arch Bridge[J].Journal of Architecture and Civil Engineering,2005,22(3):55-58.
[5]曹宝珠,周绪红,刘永健.钢管混凝土桁架新型节点试验研究[J].建筑科学与工程学报,2006,23(1):45-48. CAO Bao-zhu,ZHOU Xu-hong,LIU Yong-jian.Experimental Research on New Joints of Concrete-filled Steel Tube Truss[J].Journal of Architecture and Civil Engineering,2006,23(1):45-48.
[6]武振宇,张状南,丁玉坤,等.K型、KK型间隙方钢管节点静力工作性能的研究[J].建筑结构学报,2004,25(2):32-38. WU Zhen-yu,ZHANG Zhuang-nan,DING Yu-kun,et al.Experimental Research on the Static Behavior of Square Hollow Section Gapped K- and KK-joints[J].Journal of Building Structures,2004,25(2):32-38.
[7]武振宇,张耀春.不等宽T型CR节点静力工作性能的研究[J].工业建筑,2004,34(2):53-55. WU Zhen-yu,ZHANG Yao-chun.Static Behavior of Stepped T-type CR Joints[J].Industrial Construction,2004,34(2):53-55.
[8]武振宇,丁玉坤.KK型搭接方管节点极限承载力的非线性有限元分析[J].建筑科学与工程学报,2007,24(2):30-35. WU Zhen-yu,DING Yu-kun.Nonlinear Finite Element Analysis of Ultimate Bearing Capacity of Partially Overlapped SHS KK-joints[J].Journal of Architecture and Civil Engineering,2007,24(2):30-35.
[9]武 胜,武振宇.弦杆轴力作用下K型间隙方管节点静力性能的研究[J].钢结构,2003,18(2):38-42. WU Sheng,WU Zhen-yu.Static Behavior of Gapped K-type RHS-joints Under Chord Axial Loading[J].Steel Construction,2003,18(2):38-42.
[10]刘永健,周绪红,刘君平.矩形钢管混凝土K型节点受力性能试验[J].建筑科学与工程学报,2007,24(2):36-42. LIU Yong-jian,ZHOU Xu-hong,LIU Jun-ping.Experiment on Force Performance of Concrete-filled Rectangular Steel Tube K-joints[J].Journal of Architecture and Civil Engineering,2007,24(2):36-42.
[11]张壮南,武振宇,丁玉坤,等.弦杆轴向压力作用下K型、KK型间隙方管节点静力工作性能的试验研究[J].土木工程学报,2005,38(4):32-37. ZHANG Zhuang-nan,WU Zhen-yu,DING Yu-kun,el al.An Experimental Study on the Static Behavior of Gapped SHS K- and KK-joints Under Axial Load[J].China Civil Engineering Journal,2005,38(4):32-37.
[12]武振宇,张耀春.直接焊接钢管节点静力工作性能的研究现状[J].哈尔滨建筑大学学报,1996,29(6):102-107. WU Zhen-yu,ZHANG Yao-chun.Research Condition of Directly Welded Steel Tube About Static Behavior[J].Journal of Harbin University of Architecture and Engineering,1996,29(6):102-107.
[13]沈祖炎,罗永峰,陈扬骥.矩形钢管屋架的试验研究[J].钢结构,1995,10(1):58-61. SHEN Zu-yan,LUO Yong-feng,CHEN Yang-ji.Experimental Study of Rectangular Tubular Steel Roof Truss[J].Steel Construction,1995,10(1):58-61.
[14]PACKER J A,HENDERSON J E.空心管结构连接设计指南[M].曹俊杰,译.北京:科学出版社,1997:69. PACKER J A,HENDERSON J E.Design Guide for Connection of Hollow Tube Structure[M].Translated by CAO Jun-jie.Beijing:Science Press,1997:69.

Memo

Memo:
-
Last Update: 2007-09-20