[1] 史道济.实用极值统计方法[M].天津:天津科学技术出版社,2006.
SHI Dao-ji.Practical Method for Extremum Statistics Method[M].Tianjin:Tianjin Science and Technology Press,2006.
[2]GB/T 50283-1999,公路工程可靠度设计统一标准[S].
GB/T 50283-1999,Unified Standard for Reliability Design of Highway Engineering Structures[S].
[3]GB 50068-2001,建筑结构可靠度设计统一标准[S].
GB 50068-2001,Unified Standard for Reliability Design of Building Structures[S].
[4]公路桥梁车辆荷载研究课题组.公路桥梁车辆荷载研究[J].公路,1997(3):8-12.
The Research of Vehicle Load of Highway and Bridge Research Team.The Research of Vehicle Load of Highway and Bridge[J].Highway,1997(3):8-12.
[5]NOWAK A S.Live Load Model for Highway Bridges[J].Structural Safety,1993,13(1/2):53-66.
[6]MIAO T J,CHAN T H T.Bridge Live Load Models from WIM Data [J].Engineering Structures,2002,24(8):1071-1084.
[7]梅 刚,秦 权,林道锦.公路桥梁车辆荷载的双峰分布概率模型[J].清华大学学报:自然科学版,2003,43(10):1394-1396.
MEI Gang,QIN Quan,LIN Dao-jin.Bi-modal Proba-bilistic Model of Highway and Bridge Vehicle Loads[J].Journal of Tsinghua University:Science and Technol-ogy,2003,43(10):1394-1396.
[8]杨伟军.服役结构可靠度理论及其应用[M].长沙:中南工业大学出版社,2000.
YANG Wei-jun.Reliability Theory and Its Application of Structures in Service[M].Changsha:Central South University of Technology Press,2000.
[9]GB 50009-2001,建筑结构荷载规范[S].
GB 50009-2001,Load Code for Building Structures[S].