[1] 蒋金生,叶可明.上海新国际博览中心钢桁架结构的施工及临时支承拆除的卸载过程分析[J].建筑结构学报,2006,27(5):118-122.
JIANG Jin-sheng,YE Ke-ming.Construction Method and Dismantling Process Analysis of Temporary Shoring Structure for the Roof of Shanghai New International Expo Center[J].Journal of Building Structures,2006,27(5):118-122.
[2]伍小平,高振锋,李子旭.国家大剧院钢壳体施工全过程模拟分析[J].建筑结构学报,2005,26(5):40-45.
WU Xiao-ping,GAO Zhen-feng,LI Zi-xu.The Analysis of Whole Erection Process for Steel Shell of National Grand Theatre[J].Journal of Building Structures,2005,26(5):40-45.
[3]伍小平,高振锋,李子旭,等.国家大剧院钢壳体安装中卸载方案分析[J].建筑施工,2005,27(6):6-8.
WU Xiao-ping,GAO Zhen-feng,LI Zi-xu,et al.Analy-sis of Load-relieving Proposal for Installation of Steel Structured Shell of the National Grand Theatre[J].Building Construction,2005,27(6):6-8.
[4]郭彦林,刘学武,赵 瑛,等.国家体育场钢结构安装方案研究[J].施工技术,2006,35(12):23-27.
GUO Yan-lin,LIU Xue-wu,ZHAO Ying,et al.Study on Erection Schemes for the Steel Structure of National Stadium[J].Construction Technology,2006,35(12):23-27.
[5]郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,34(12):1-5.
GUO Yan-lin,CUI Xiao-qiang.Key Technical Problems and Discussion in Construction Process of Larger Span Steel Structures[J].Industrial Construction,2004,34(12):1-5.
[6]崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88.
CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the Construction Mechanic Method of Long-span Steel Structures[J].Engineering Mechanics,2006,23(5):83-88.
[7]郭彦林,郭宇飞,刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报,2007,24(1):52-58.
GUO Yan-lin,GUO Yu-fei,LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering,2007,24(1):52-58.
[8]罗晓群.大型钢结构施工力学分析研究[D].上海:同济大学,2003.
LUO Xiao-qun.Research on Construction Mechanics of Large-scale Steel Structure[D].Shanghai:Tongji University,2003.
[9]张其林,罗晓群,高振锋,等.大跨钢结构施工过程的数值跟踪和图形模拟[J].同济大学学报:自然科学版,2004,32(10):1295-1299.
ZHANG Qi-lin,LUO Xiao-qun,GAO Zhen-feng,et al.Numerical Tracing and Graphic Simulation for Construction Processes of Large Span Pre-tensioned Steel Structures[J].Journal of Tongji University:Natural Science,2004,32(10):1295-1299.
[10]陈国栋,郭彦林,叶浩文,等.广州市新体育馆屋盖吊装及拆撑过程动态分析[J].建筑结构,2002,32(1):53-57.
CHEN Guo-dong,GUO Yan-lin,YE Hao-wen,et al.Tracing Analysis of Truss Roof Structure for Guangzhou Gymnasium from Hoisting State into Designing State[J].Building Structure,2002,32(1):53-57.