[1] 贺拴海.桥梁结构理论与计算方法[M].北京:人民交通出版社,2003:384-388.
HE Shuan-hai.Structure Theory and Computing Method of the Bridge[M].Beijing:China Communications Press,2003:384-388.
[2]潘永仁.悬索桥结构非线性分析理论与方法[M].北京:人民交通出版社,2004:14-21.
PAN Yong-ren.Non-linear Analysis Theory Method for Suspension Bridge Structures[M].Beijing:China Communications Press,2004:14-21.
[3]KIM H K,LEE M J,CHANG S P.Non-linear Shape-finding Analysis of a Self-anchored Suspension Bridge[J].Engineering Structures,2002,24(12):1547-1559.
[4]KAROUMI R.Some Modeling Aspects in the Non-linear Finite Element Analysis of Cable Supported Bridges[J].Computers and Structures,1999,71(4):397-412.
[5]肖海波,俞亚南,沈 毅.悬索桥主缆成桥线形精确分析[J].中国市政工程,2003(4):21-22.
XIAO Hai-bo,YU Ya-nan,SHEN Yi.Accurate Analy-sis on Bridging Shape of Main Cable in Suspension Bridge[J].China Municipal Engineering,2003(4):21-22.
[6]沈锐利.悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9.
SHEN Rui-li.Calculation Methods for Design and Erection of Cable Curve of Suspension Bridge[J].China Civil Engineering Journal,1996,29(2):3-9.
[7]狄 谨,武 隽.自锚式悬索桥主缆线形计算方法[J].交通运输工程学报,2004,4(3):38-43.
DI Jin,WU Jun.Calculation Methods for Cable Curve of Self-anchored Suspension Bridge[J].Journal of Traffic and Transportation Engineering,2004,4(3):38-43.
[8]李枝军,韩晓林,李爱群,等.悬索桥桥塔挂缆前后动态特性分析与测试[J].中国公路学报,2007,20(5):54-58.
LI Zhi-jun,HAN Xiao-lin,LI Ai-qun,et al.Dynamic Analysis and Test of Bridge Tower of Suspension Bridge Before and After Cable Installed[J].China Journal of Highway and Transport,2007,20(5):54-58.
[9]谭冬莲.大跨径自锚式悬索桥合理成桥状态的确定方法[J].中国公路学报,2005,18(2):51-55.
TAN Dong-lian.Decision Method on Reasonable Design State of Self-anchored Suspension Bridge[J].China Journal of Highway and Transport,2005,18(2):51-55.
[10]张志国,张庆芳,邹振祝.悬索桥成桥状态计算方法[J].长安大学学报:自然科学版,2006,26(1):59-62.
ZHANG Zhi-guo,ZHANG Qing-fang,ZOU Zhen-zhu.Analytical Methods of Suspension Bridge Geom-etry Under Dead Loads[J].Journal of Chang'an University:Natural Science Edition,2006,26(1):59-62.
[11]刘来君,吴士义.悬索桥张拉锚跨索股施工控制技术[J].长安大学学报:自然科学版,2008,28(6):36-40.
LIU Lai-jun,WU Shi-yi.Construction Control Technique for Suspension Bridge Built by Drawing Anchorage Cable[J].Journal of Chang'an University:Natural Science Edition,2008,28(6):36-40.
[12]黄平明,慕玉坤.悬索桥锚跨张力控制系统[J].长安大学学报:自然科学版,2007,27(4):42-45.
HUANG Ping-ming,MU Yu-kun.Tension Control System of Suspension Bridge Anchor Cable[J].Journal of Chang'an University:Natural Science Edition,2007,27(4):42-45.
[13]许世展,贺拴海,盖轶婷.基于索鞍元预偏施工悬索桥的施工仿真[J].长安大学学报:自然科学版,2007,27(1):35-39.
XU Shi-zhan,HE Shuan-hai,GAl Yi-ting.Construction Simulation for Suspension Bridge with Non-pre-bias of Cable Saddle[J].Journal of Chang'an University:Natural Science Edition,2007,27(1):35-39.
[14]刘来君,贺拴海.索鞍元预偏施工悬索桥主缆的温度效应[J].长安大学学报:自然科学版,2007,27(1):40-44.
LIU Lai-jun,HE Shuan-hai.Temperature Effect on Suspension Bridge with Non-pre-bias of Cable-saddle[J].Journal of Chang'an University:Natural Science Edition,2007,27(1):40-44.
[15]王钧利,贺拴海.大跨径弯桥圆心角对其内力、位移及稳定性的影响[J].交通运输工程学报,2007,7(3):86-70.
WANG Jun-li,HE Shuan-hai.Central Angle Influence of Long-spanCurve Bridge on Its Inner Forces, Displacements and Stability[J].Journal of Traffic and Transportation Engineering,2007,7(3):86-70.