|Table of Contents|

Analysis and Control of Multi-span Double Arch Bridge Expanded by Continuous Bridge(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2010年01期
Page:
25-30
Research Field:
Publishing date:
2010-03-20

Info

Title:
Analysis and Control of Multi-span Double Arch Bridge Expanded by Continuous Bridge
Author(s):
ZHANG Wang-xi YI Wei-jian WANG Li-li HUANG Liang-xiong WEN Shuang-wu
School of Civil Engineering, Hunan University, Changsha 410082, Hunan, China
Keywords:
expansion engineering multi-span double arch bridge continuous bridge control temperature effect
PACS:
U448.15
DOI:
-
Abstract:
Associating with the west end expansion engineering of Changsha Juzizhou Bridge, Hunan Province, some key problems arising in the expansion project of multi-span double arch bridge expanded by continuous bridge were discussed. Analytical results show that the reasonable construction control can prevent the original multi-span arch bridge from cracking. The revising of construction measurement will benefit from the displacement monitoring data. The varying magnitude of the structural strain created by the varying temperature is greater than the expansion construction. During the field measuring by metal strain gauge or manual strain gauge, the interference affection of environment is great, and the measuring strain is greater than the structural strain by loads.

References:

[1] 郝 超.大跨度钢斜拉桥的施工监控及其目标精度值[J].中国公路学报,2003,16(1):54-57. HAO Chao.Construction Control and Control Precision Goal of Long-span Steel Cable-stayed Bridge[J].China Journal of Highway and Transport,2003,16(1):54-57.
[2]常 英.大跨钢箱梁斜拉桥施工控制要点分析[J].公路交通科技,2001,18(1):39-43. CHANG Ying.Analysis of Key-points for Construction Control of Long-span Steel Box-girder Cable-stayed Bridge[J].Journal of Highway and Transportation Research and Development,2001,18(1):39-43.
[3]檀永刚,张 哲,杜 涛.康济桥的施工控制[J].大连理工大学学报,2005,45(6):832-836. TAN Yong-gang,ZHANG Zhe,DU Tao.Construction Control of Kangji Bridge[J].Journal of Dalian University of Technology,2005,45(6):832-836.
[4]肖汝诚,项海帆.拉吊协作桥的施工控制与吊索疲劳控制研究[J].同济大学学报,1999,27(2):234-238. XIAO Ru-cheng,XIANG Hai-fan.Study of Construction Control and Suspender Fatigue Problems for Cable-stayed-suspension Bridges[J].Journal of Tongji University,1999,27(2):234-238.
[5]潘盛山,黄才良,张 哲.202 m跨径钢管混凝土系杆拱桥的施工控制[J].武汉理工大学学报:交通科学与工程版,2004,28(4):522-525. PAN Sheng-shan,HUANG Cai-liang,ZHANG Zhe.The Supervisory of 202 m-span Concrete Filled Steel Tubular Tied Arch Bridge[J].Journal of Wuhan University of Technology:Transportation Science & Engin-eering,2004,28(4):522-525.
[6]彭旺虎,邵旭东,李立峰,等.无背索斜拉桥的概念、设计与施工[J].土木工程学报,2007,40(5):26-33. PENG Wang-hu,SHAO Xu-dong,LI Li-feng,et al.The Concept,Design,and Construction of Cable-stayed Bridges Without Backstays[J].China Civil Engineering Journal,2007,40(5):26-33.

Memo

Memo:
-
Last Update: 2010-03-20