[1] 叶志龙.悬索桥主缆架设误差影响分析及参数控制[D].成都:西南交通大学,2008.
YE Zhi-long.The Effect Analysis of Errors and Par-ameters Control for Main Cable Erection of Suspension Bridge[D].Chengdu:Southwest Jiaotong University,2008.
[2]KAWATA T.Modern Suspension Bridge[M].Tokyo:Rikoh Tosho,1987.
[3]黄铁生.大岛大桥主缆施工[J].国外桥梁,1993(3):175-180.
HUANG Tie-sheng.Main Cable Construction of Oshima Bridge[J].Foreign Bridges,1993(3):175-180.
[4]HASEGAWA T,OSHIO Y,HARADA Y.Main Cable Temperature Testing Experiment of Suspension Bridge[J].Bridge and Foundation Engineering,1975,9(10):42-47.
[5]HASEGAWA T,HARADA C.Presumption Methods on Main Cable Temperature of Suspension Bridge[J].Yokogawa Technical Journal,1974(4):53-60.
[6]章熙民,任泽濡,梅飞鸣.传热学[M].5版.北京:中国建筑工业出版社,2007.
ZHANG Xi-min,REN Ze-ru,MEI Fei-ming.Heat Transfer[M].5th ed.Beijing:China Architecture & Building Press,2007.
[7]潘永仁,范立础.悬索桥施工中主缆横截面平均温度实用计算法[J].同济大学学报:自然科学版,1998,26(2):114-119.
PAN Yong-ren,FAN Li-chu.Practical Method for Calculating the Mean Temperature of the Main Cable Section in the Construction Control of Suspension Bridges[J].Journal of Tongji University:Natural Science,1998,26(2):114-119.
[8]李枝军,韩晓林,李爱群,等.悬索桥桥塔挂缆前后动态特性分析与测试[J].中国公路学报,2007,20(5):54-58.
LI Zhi-jun,HAN Xiao-lin,LI Ai-qun,et al.Dynamic Analysis and Test of Bridge Tower of Suspension Bridge Before and After Cable Installed[J].China Journal of Highway and Transport,2007,20(5):54-58.
[9]刘来君,吴士义.悬索桥张拉锚跨索股施工控制技术[J].长安大学学报:自然科学版,2008,28(6):36-40.
LIU Lai-jun,WU Shi-yi.Construction Control Technique for Suspension Bridge Built by Drawing Anchorage Cable[J].Journal of Chang'an University:Natural Science Edition,2008,28(6):36-40.