|Table of Contents|

Mechanical Monitoring and Analysis of Umbrella Arch Structure in Shallow-buried Bias Loess Tunnel Entrance(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2011年01期
Page:
100-105
Research Field:
Publishing date:
2011-03-20

Info

Title:
Mechanical Monitoring and Analysis of Umbrella Arch Structure in Shallow-buried Bias Loess Tunnel Entrance
Author(s):
CHEN Jian-xun1 QIAO Xiong12
1. Key Laboratory for Highway Bridge and Tunnel of Shaanxi Province, Chang'an University, Xi'an 710064, Shaanxi, China; 2. School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, Gansu, China
Keywords:
tunnel engineering loess shallow-buried bias umbrella arch monitoring
PACS:
U451.2
DOI:
-
Abstract:
In order to understand the structural mechanical properties of umbrella arch in shallow-buried bias loess tunnel entrance, stress of umbrella arch base, stress of steel frame, concrete stress and vault crown settlement were monitored and analyzed in tunnel entrance of Liujiaping 2# Tunnel.The results show that in shallow-buried bias tunnel, the stress distribution in the umbrella arch base is not uniform, and filling soil in the vault crown makes the stress of umbrella arch base increase rapidly, the stress of umbrella arch base tends to be steady after the contruction of inverted arch. Stress of steel frame of umbrella arch increases rapidly after the excavation of inverted arch, which is very complex, including tension and compression, and the value is large, support action of steel frame in the umbrella arch is significant. The umbrella arch is statically indeterminate structure, temperature difference in winter and summer makes concrete stress of umbrella arch alternatively change with the variation of time(season), compressive stress is maximum in summer and tensile stress is maximum in winter, and the compressive stress is small and the tensile stress is large.The tensile stresses in many measuring points are bigger than design axis tensile strength of C25 diecasting concrete. The vault crown settlement of umbrella arch is caused by filling soil in the vault crown and excavation of inverted arch.

References:

[1] 吴英明.庆兴黄土隧道出口浅埋段施工技术[J].铁道建筑技术,2010(1):25-29. WU Ying-ming.Construction Technology in the Shallow-buried Section of Qingxing Loess Tunnel[J].Railway Construction Technology,2010(1):25-29.
[2]袁永新.甘肃黄土公路隧道设计与施工技术研究[D].西安:长安大学,2007. YUAN Yong-xin.Sweet Design and Construction Technique of the Gansu Loess Highway Tunnel Research[D].Xi'an:Chang'an University,2007.
[3]李国良.大跨黄土隧道设计与安全施工对策[J].现代隧道技术,2008, 45(1):53-62. LI Guo-liang.Design and Safety Construction Measures for Large-span Loess Tunnels[J].Modern Tunnelling Technology,2008,45(1):53-62.
[4]刘祖典.黄土力学与工程[M].西安:陕西省科学技术出版社,1996. LIU Zu-dian.Loess Dynamics and Engineering[M].Xi'an:Shaanxi Science and Technology Press,1996.
[5]陕西省交通建设集团公司吴子建设管理处,长安大学.黄土隧道支护设计与关键施工技术研究总报告[R].西安:长安大学,2010. Wubao to Zizhou Construction Management Department of Shaanxi Provincial Communication Construction Group,Chang'an University.Design and Construction Key Technical General Report of Loess Tunnel Lining[R].Xi'an:Chang'an University,2010.
[6]陈建勋,马建秦.隧道工程试验检测技术[M].北京:人民交通出版社,2005. CHEN Jian-xun,MA Jian-qin.Tunnel Engineering Test Technology[M].Beijing:China Communications Press,2005.
[7]来弘鹏,谢永利,杨晓华.黄土公路隧道受力特性测试[J].长安大学学报:自然科学版,2005,25(6):53-56. LAI Hong-peng,XIE Yong-li,YANG Xiao-hua.Mechanical Characteristic of Highway Tunnel in Loess[J].Journal of Chang'an University:Natural Science Edition,2005,25(6):53-56.
[8]韩桂武,刘 斌,范 鹤.浅埋黄土隧道衬砌结构受力分析[J].岩石力学与工程学报,2007,26(1):3250-3256. HAN Gui-wu,LIU Bin,FAN He.Mechanical Characteristics of Tunnel Lining Structure in Shallow-buried Loess Area[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(1):3250-3256.
[9]陈建勋,王 超,罗彦斌,等.高含水量土质隧道不设系统锚杆的试验研究[J].岩土工程学报,2010,32(5):815-820. CHEN Jian-xun,WANG Chao,LUO Yan-bin,et al.Experimental Research on High-water-content Soil Tunnel Without Systematic Bolts[J].Chinese Journal of Geotechnical Engineering,2010,32(5):815-820.
[10]陈建勋,姜久纯,王梦恕.黄土隧道网喷支护结构中锚杆的作用[J].中国公路学报,2007,20(3):71-75. CHEN Jian-xun,JIANG Jiu-chun,WANG Meng-shu.Function of Rock Bolt of Lattice Girder and Shotcrete Support Structure in Loess Tunnel[J].China Journal of Highway and Transport,2007,20(3):71-75.
[11]谭忠盛,喻 渝,王明年,等.大断面浅埋黄土隧道锚杆作用效果的试验研究[J].岩土力学,2008,29(2):491-495,506. TAN Zhong-sheng,YU Yu,WANG Ming-nian,et al.Experimental Study on Bolt Efect on Large Section Shallow Depth Loess Tunnels[J].Rock and Soil Mechanics,2008,29(2):491-495,506.
[12]陈建勋,姜久纯,罗彦斌,等.黄土隧道洞口段支护结构的力学特性分析[J].中国公路学报,2008,21(5):75-80. CHEN Jian-xun,JIANG Jiu-chun,LUO Yan-bin,et al.Mechanics Characteristic Analysis of Support Structure of Loess Tunnel Entrance[J].China Journal of Highway and Transport,2008,21(5):75-80.
[13]陈建勋,杨 忠.秦岭终南山特长公路隧道东线施工监控量测[J].公路,2006(7):205-208. CHEN Jian-xun,YANG Zhong.Construction Monitoring in East Linein Qinling Zhongnanshan Super-long Highway Tunnel[J].Highway,2006(7):205-208.
[14]陈建勋,杨 忠,袁雪戡.秦岭终南山特长公路隧道大埋深段施工监测及分析[J].建筑科学与工程学报,2006,23(3):71-75. CHEN Jian-xun,YANG Zhong,YUAN Xue-kan.Construction Monitoring and Measuring in Segments of Large Embedded Depth in Qinling Zhongnanshan Super-long Highway Tunnel[J].Journal of Architecture and Civil Engineering,2006,23(3):71-75.
[15]JGJ 138—2001,型钢混凝土组合结构技术规程[S]. JGJ 138—2001,Technical Specification for Steel Reinforced Concrete Composite Structures[S].
[16]JTG D70—2004,公路隧道设计规范[S]. JTG D70—2004,Code for Design of Highway Tunnel[S].

Memo

Memo:
-
Last Update: 2011-03-20