[1] 陈宝春.钢管混凝土拱桥设计与施工[M].北京:人民交通出版社,1999.CHEN Bao-chun.Design and Construction of Concrete-filled Steel Tubular Arch Bridges[M].Beijing:China Communications Press,1999.
[2]陈水盛,陈宝春.钢管混凝土拱桥动力特性分析[J].公路,2001(2):10-14.CHEN Shui-sheng,CHEN Bao-chun.Analysis of Dynamic Characteristics of Concrete Filled Steel Tubular Arch Bridge[J].Highway,2001(2):10-14.
[3]ZHAO J,DE WOLF J T.Sensitivity Study for Vibration Parameters Used in Damage Detection[J].Journal of Structural Engineering,1999,25(4):410-416.
[4]HASSIOTIS S,JEONG G D.Identification of Stiffness Reduction Using Natural Frequencies[J].Journal of Engineering Mechanics,1995,121(10):1106-1113.
[5]REN W X,ZHAO T,HARIK I E.Experimental and Analytical Modal Analysis of a Steel Arch Bridge[J].Journal of Structural Engineering,2004,130(7):1022-1031.
[6]冯仲仁,李彩霞,吴刚刚.下承式钢管混凝土拱桥自振特性的有限元分析[J].武汉理工大学学报,2005,27(7):50-53.FENG Zhong-ren,LI Cai-xia,WU Gang-gang.Finite Element Analysis on Through Concrete-filled Steel-tubular Arch Bridge’s Self-vibration Characteristics[J].Journal of Wuhan University of Technology,2005,27(7):50-53.
[7]高大峰,刘伯栋,张静娟.中承式钢筋混凝土拱桥自振特性分析[J].西北地震学报,2009,31(1):75-79.GAO Da-feng,LIU Bo-dong,ZHANG Jing-juan.Analysis on Self-vibration Characteristics of Half-through Reinforced Concrete Arch Bridge[J].Northwestern Seismological Journal,2009,31(1):75-79.
[8]WANG H,ZHOU K G,LI A Q,et al.Parameter Effects on the Dynamic Characteristics of a Super-long-span Triple-tower Suspension Bridge[J].Journal of Zhejiang University:Science A,2010,11(5):305-316.
[9]谢 静.基于现场实测的大跨斜拉桥抖振响应时域分析[D].南京:东南大学,2010.XIE Jing.Time Domain Study on Buffeting Response of Long-span Cable-stayed Bridge Based on Field Measurement[D].Nanjing:Southeast University,2010.
[10]姜海波,赵人达.带边界条件损伤简支梁振动模态分析[J].振动与冲击,2004,23(2):72-74,77.JIANG Hai-bo,ZHAO Ren-da.Vibration Mode Analysis of Simply Supported Beam with Damage Boundary Condition[J].Journal of Vibration and Shock,2004,23(2):72-74,77.
[11]项海帆,刘光栋.拱结构的稳定与振动[M].北京:人民交通出版社,1991.XIANG Hai-fan,LIU Guang-dong.Arch Structure Stability and Vibration[M].Beijing:China Communications Press,1991.
[12]CECS 28:90,钢管混凝土结构设计与施工规程[S].CECS 28:90,Specification for Design and Construction of Concrete-filled Steel Tubular Structures[S].
[13]杨大余,于金良,张 凯.锚喷混凝土加固双曲拱桥植筋工艺参数研究[J].筑路机械与施工机械化,2011,28(6):67-69.YANG Da-yu,YU Jin-liang,ZHANG Kai.Study on Parameters of Planting Steel Bars for Reinforcement of Double-curvature Arch Bridge by Spurting Concrete[J].Road Machinery & Construction Mechanization,2011,28(6):67-69.
[14]侯林平,常国强,王丰华.在役双曲拱桥的加固方法[J].筑路机械与施工机械化,2010,27(11):65-67.HOU Lin-ping,CHANG Guo-qiang,WANG Feng-hua.Reinforcement Measures for In-service Double-curved Arch Bridge[J].Road Machinery & Construction Mechanization,2010,27(11):65-67.
[15]周勇军,彭晓彬,赵 煜,等.简支梁桥顺桥向地震动分析[J].交通运输工程学报,2007,7(6):86-89.ZHOU Yong-jun,PENG Xiao-bin,ZHAO Yu,et al.Analysis of Longitudinal Seismic Vibration for Simply-supported Beam Bridge[J].Journal of Traffic and Transportation Engineering,2007,7(6):86-89.
[16]吴庆雄,陈宝春.钢管混凝土拱桥桥面平整度评价[J].交通运输工程学报,2010,10(4):23-28.WU Qing-xiong,CHEN Bao-chun.Deck Roughness Evaluation of Concrete-filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2010,10(4):23-28.
[17]韦建刚,陈宝春.钢管混凝土拱桥拱肋刚度设计取值分析[J].交通运输工程学报,2008,8(2):34-39.WEI Jian-gang,CHEN Bao-chun.Analysis on Rib Rigidity of Concrete Filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2008,8(2):34-39.