[1] 韩林海,尧国皇.钢管初应力对钢管混凝土压弯构件承载力的影响研究[J].土木工程学报,2003,36(4):9-18.
HAN Lin-hai,YAO Guo-huang.Effect of Initial Stress on Bearing Capacity of Concrete-filled Steel Tubular Beam-columns[J].China Civil Engineering Journal,2003,36(4):9-18.
[2]ASCCS.Concrete Filled Steel Tubes— a Comparison of International Codes and Practices[R].Innsbruck:ASCCS,1997.
[3]JOHANSSON M,GYLLTOFT K.Mechanical Behavior of Circular Steel-concrete Composite Stub Columns[J].Journal of Engineering Mechanics,2002,128(8):1073-1081.
[4]周水兴,张 敏,王小松.钢管初应力对钢管砼拱桥承载力影响非线性分析[J].计算力学学报,2010,27(2):291-297,302.
ZHOU Shui-xing,ZHANG Min,WANG Xiao-song.Nonlinear Analysis of Steel Tube Initial Stress Effect in Steel Tube on Bearing Capacity for CFST Arch Bridges[J].Chinese Journal of Computational Mechanics,2010,27(2):291-297,302.
[5]XIONG De-xin,ZHA Xiao-xiong.A Numerical Investigation on the Behavior of Concrete-filled Steel Tubular Columns Under Initial Stress[J].Journal of Construction Steel Research,2007,63(5):599-611.
[6]XIONG De-xin,ZHA Xiao-xiong.Non-linear Analysis of the Initial Stress Effect on the Behavior of Concrete-filled Square Steel Tubular Members[C]//SHEN Z Y,LI G Q,CHAN S L.Proceedings of the Fourth International Conference on Advances in Steel Structures.Shanghai:Elsevier Science Ltd,2005:599-611.
[7]周水兴,刘 琪,陈湛荣.钢管初应力对哑铃型钢管砼拱桥承载力影响分析[J].工程力学,2008,25(7):159-165,178.
ZHOU Shui-xing,LIU Qi,CHEN Zhan-rong.Effect of Initial Stress on Bearing Capacity of Dumbbell Concrete-filled Steel Tube Arch Bridge[J].Engineering Mechanics,2008,25(7):159-165,178.
[8]韦建刚,黄福云,陈宝春.初应力对钢管混凝土单圆管拱极限承载力影响的研究[J].工程力学,2010,27(7):103-112.
WEI Jian-gang,HUANG Fu-yun,CHEN Bao-chun.Research on the Influence of Initial Stress to Ultimate Load Carrying Capacity of Concrete Filled Steel Tubular(Single Tube)Arches[J].Engineering Mechanics,2010,27(7):103-112.
[9]WEI Jian-gang,CHEN Bao-chun,WU Qing-xiong,et al.Equivalent Beam-column Method to Estimate In-plane Circle Loads of Parabolic Fixed Steel Arches[J].Bridge Engineering,2009,14(5):346-354.
[10]黄福云,陈宝春,林友勤,等.初应力对钢管混凝土轴压柱套箍作用影响研究[J].福州大学学报:自然科学版,2011,39(4):575-580,588.
HUANG Fu-yun,CHEN Bao-chun,LIN You-qin,et al.Research on Hooping Effect of Concrete Filled Steel Tube Stubs with Initial Stress Under Axial Compression[J].Journal of Fuzhou University:Natural Science Edition,2011,39(4):575-580,588.
[11]许凯明,张明中.大跨径钢管混凝土拱桥主拱混凝土灌注阶段空间稳定分析[J].筑路机械与施工机械化,2008,25(12):66-68,72.
XU Kai-ming,ZHANG Ming-zhong.Spatial Stability Research on Concrete Construction Stage of Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Mechanization,2008,25(12):66-68,72.
[12]卢 斌,文 锋,李世清.大跨径钢管混凝土拱桥施工方法的风洞试验研究[J].筑路机械与施工机械化,2006,23(3):41-43.
LU Bin,WEN Feng,LI Shi-qing.Study of Wind-resistant of Integral Lifting Construction for Big Solid in Long-span Concrete-filled[J].Road Machinery & Construction Mechanization,2006,23(3):41-43.
[13]吴庆雄,陈宝春.钢管混凝土拱桥桥面平整度评价[J].交通运输工程学报,2010,10(4):23-28.
WU Qing-xiong,CHEN Bao-chun.Deck Roughness Evaluation of Concrete-filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2010,10(4):23-28.
[14]韦建刚,陈宝春.钢管混凝土拱桥拱肋刚度设计取值分析[J].交通运输工程学报,2008,8(2):34-39.
WEI Jian-gang,CHEN Bao-chun.Analysis on Rib Rigidity of Concrete Filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2008,8(2):34-39.
[15]陈宝春,黄福云,盛 叶.钢管混凝土哑铃形短柱轴压试验研究[J].工程力学,2005,22(1):187-194.
CHEN Bao-chun,HUANG Fu-yun,SHENG Ye.Experimental Study of Concrete-filled Steel Tubular Dumbbell Shaped Short Columns Under Concentric Loads[J].Engineering Mechanics,2005,22(1):187-194.
[16]陈宝春,肖泽荣,韦建刚.钢管混凝土哑铃形偏压构件试验研究[J].工程力学,2005,22(2):89-95.
CHEN Bao-chun,XIAO Ze-rong,WEI Jian-gang.Experimental Study of Concrete-filled Steel Tubular Dumbbell Shaped Columns Under Eccentric Loads[J].Engineering Mechanics,2005,22(2):89-95.
[17]陈宝春,盛 叶.钢管混凝土哑铃形轴压长柱极限承载力研究[J].工程力学,2008,25(4):121-127,133.
CHEN Bao-chun,SHENG Ye.Research on Load-carrying Capacity of Concrete-filled-steel Tubular Dumbbell-shaped Long Columns Under Axial Loads[J].Engineering Mechanics,2008,25(4):121-127,133.
[18]陈宝春,盛 叶.钢管混凝土哑铃形偏压长柱极限承载力研究[J].工程力学,2008,25(12):98-105.
CHEN Bao-chun,SHENG Ye.Research on Ultimate Load-carrying Capacity of Concrete Filled Steel Tubular Dumbbell-shaped Long Columns Under Eccentric Loads[J].Engineering Mechanics,2008,25(12):98-105.
[19]丁发兴,李大稳,余志武,等.哑铃型钢管混凝土轴压短柱力学性能分析[J].铁道科学与工程学报,2011,8(2):1-6.
DING Fa-xing,LI Da-wen,YU Zhi-wu,et al.Behavior of Axial Loaded Concrete-filled Steel Tubular Dumbbell Shaped Stub Columns[J].Journal of Railway Science and Engineering,2011,8(2):1-6.
[20]周水兴,熊洪滨,张 敏.钢管混凝土哑铃型截面计算模式分析[J].土木建筑与环境工程,2009,31(2):105-109.
ZHOU Shui-xing,XIONG Hong-bin,ZHANG Min.Discussion on Calculation Pattern of Concrete-filled Steel Tube with Dumbbell-shaped Section[J].Journal of Civil,Architectural & Environmental Engineering,2009,31(2):105-109.
[21]黄福云,陈宝春.初应力对钢管混凝土哑铃形轴压短柱受力性能影响的试验研究[J].福州大学学报:自然科学版,2006,34(2):240-244.
HUANG Fu-yun,CHEN Bao-chun.Experimental Research on Influence of Initial Stress to Behavior of Concrete Filled Steel Tubular Dumbbell Shaped Stub Columns Under Axial Loads[J].Journal of Fuzhou University:Natural Science Edition,2006,34(2):240-244.
[22]陈昀明,黄福云,陈宝春.初应力对钢管混凝土哑铃形长柱受力性能的影响[J].长沙交通学院学报,2008,24(4):6-11.
CHEN Yun-ming,HUANG Fu-yun,CHEN Bao-chun.The Influence of Initial Stress on the Behavior of Concrete Filled Steel Tubular Dumbbell Shaped Long Columns[J].Journal of Changsha Communications University,2008,24(4):6-11.
[23]陈宝春,黄福云.有初应力的钢管混凝土偏压构件极限承载力计算[J].长沙交通学院学报,2008,24(2):1-8.
CHEN Bao-chun,HUANG Fu-yun.Calculation of Ultimate Load-carrying Capacity of Eccentrically Loaded Concrete Filled Steel Tubular(CFST)Columns with Initial Stresses[J].Journal of Changsha Communications University,2008,24(2):1-8.
[24]刘金福.哑铃型钢管砼拱桥拱肋截面设计[J].福建建筑,1996(3):16-18.
LIU Jin-fu.Section Design of Rib Arch of Dumbbell-shaped Arch Bridge of Concrete Filled Steel Tube[J].Fujian Architecture & Construction,1996(3):16-18.
[25]中国土木工程学会高强混凝土委员会.高强混凝土结构设计与施工指南[M].2版.北京:中国建筑工业出版社,2001.
High Strength Concrete Committee of China Civil Engineering Society.Design and Construction Guide of High Strength Concrete Structures[M].2nd ed.Beijing:China Architecture & Building Press,2001.
[26]蒋凌云,江 晖.深圳芙蓉大桥设计[J].桥梁建设,2000(3):38-40.
JIANG Ling-yun,JIANG Hui.Design of Furong Bridge in Shenzhen[J].Bridge Construction,2000(3):38-40.
[27]韦建刚,陈宝春,肖泽荣.钢管混凝土哑铃形偏心受压短柱极限承载力的修正格构式算法[J].福州大学学报:自然科学版,2004,32(5):603-607.
WEI Jian-gang,CHEN Bao-chun,XIAO Ze-rong.Modified Lattice Method for Ultimate Load-carrying Capacity of Dumbbell Shaped Concrete Filled Steel Tubular Eccentrically-loaded Stub Columns[J].Journal of Fuzhou University:Natural Science Edition,2004,32(5):603-607.
[28]陈宝春,黄福云,肖泽荣.钢管混凝土哑铃形短柱极限承载力的等效单圆管算法[J].公路交通科技,2004,21(6):50-53,57.
CHEN Bao-chun,HUANG Fu-yun,XIAO Ze-rong.Equivalent Single Circular Tube Method for Ultimate Load-carrying Capacity of Concrete Filled Steel Tubular Dumbbell Shaped Short Columns[J].Journal of Highway and Transportation Research and Development,2004,21(6):50-53,57.
[29]YU Mao-hong.Unified Strength Theory and Its Applications[M].Berlin:Springer Press,2004.
[30]蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003.
CAI Shao-huai.Modern Steel Tube Confined Concrete Structures[M].Beijing:China Communications Press,2003.
[31]谭克锋,蒲心诚,蔡绍怀.钢管超高强混凝土的性能与极限承载能力的研究[J].建筑结构学报,1999,20(1):10-15.
TAN Ke-feng,PU Xin-cheng,CAI Shao-huai.Study on the Mechanical Properties of Steel Extra-high Strength Concrete Encased in Steel Tubes[J].Journal of Building Structures,1999,20(1):10-15.