[1] 钟善桐.钢管混凝土结构[M].北京:清华大学出版社,2003.
ZHONG Shan-tong.Structure of Concrete-filled Steel Tube[M].Beijing:Tsinghua University Press,2003.
[2]陈宝春.钢管混凝土拱桥[M].北京:人民交通出版社,2007.
CHEN Bao-chun.Concrete Filled Steel Tubular Arch Bridges[M].Beijing:China Communications Press,2007.
[3]林春皎,郑皆连,秦 荣.钢管混凝土拱肋混凝土脱空研究综述[J].中外公路,2004,24(6):54-58.
LIN Chun-jiao,ZHENG Jie-lian,QIN Rong.Reviews on the Detachment of Concrete Column from Steel Tube in Concrete-filled Steel Tubular Arch Bridge[J].Journal of China & Foreign Highway,2004,24(6):54-58.
[4]徐亚光,颜东煌,邵旭东.脱粘对桁架式钢管混凝土拱桥受力性能的影响[J].中国公路学报,2007,20(6):61-66.
XU Ya-guang,YAN Dong-huang,SHAO Xu-dong.Influences of Debonding on Mechanical Behavior of Trussed Concrete-filled Steel Tubular Arch Bridge[J].China Journal of Highway and Transport,2007,20(6):61-66.
[5]刘永健,刘君平,池建军.钢管混凝土界面抗剪粘结滑移力学性能试验[J].广西大学学报:自然科学版,2010,35(1):17-23.
LIU Yong-jian,LIU Jun-ping,CHI Jian-jun.Shear Bond Behaviors at Interface of Concrete-filled Steel Tube[J].Journal of Guangxi University:Nature Science Edition,2010,35(1):17-23.
[6]张清华,李 乔,唐 亮.桥塔钢-混凝土结合段剪力键破坏机理及极限承载力[J].中国公路学报,2007,20(1):85-90.
ZHANG Qing-hua,LI Qiao,TANG Liang.Fracture Mechanism and Ultimate Carrying Capacity of Shear Connectors Applied for Steel-concrete Joint Segment of Bridge Pylon[J].China Journal of Highway and Transport,2007,20(1):85-90.
[7]张清华,李 乔,唐 亮.剪力连接件的三维非线性仿真分析方法[J].西南交通大学学报,2005,40(5):595-599.
ZHANG Qing-hua,LI Qiao,TANG Liang.Research on 3D FEM Nonlinear Simulation Method for Shear Connectors[J].Journal of Southwest Jiaotong University,2005,40(5):595-599.
[8]胡建华,侯文崎,叶梅新.PBL剪力键承载力影响因素和计算公式研究[J].铁道科学与工程学报,2007,4(6):12-18.
HU Jian-hua,HOU Wen-qi,YE Mei-xin.Study of Influence Factors and Formula for the Bearing Capacity of PBL Shear Connectors[J].Journal of Railway Science and Engineering,2007,4(6):12-18.
[9]LEONHARDT E F,ANDRAE W,ANDRAE H P,et al.Novel,Advantageous Shear Connectors for Composite Steel Structures with High Fatigue Strength[J].Concrete and Reinforced Concrete Construction,1987,82(12):325-331.