|Table of Contents|

Experiment on Bond Strength Between Steel and Concrete with Overrun Rib Spacing(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2016年02期
Page:
107-113
Research Field:
Publishing date:

Info

Title:
Experiment on Bond Strength Between Steel and Concrete with Overrun Rib Spacing
Author(s):
SUN Hao LI Ji-chao GAN Dan
School of Highway, Chang’an University
Keywords:
steel concrete bond strength overrun rib spacing pull-out test failure mode bearing capacity
PACS:
-
DOI:
-
Abstract:
In order to analyze the influence of overrun rib spacing on bond strength between steel and concrete, 36 specimens with overrun and standard rib spacing were manufactured. The pullout tests which were sensitive on the shape characteristics of steel rib were carried out. The failure mode, loaddisplacement curve, carrying capacity and bond strength were analyzed by comparing the pull-out test results. The test results show that all specimens only appear bond slip failure and concrete splitting failure. The strength of all steels cannot reach their yield strength. The carrying capacity difference of the two types of specimens is 9%-15%, and the discreteness is relatively small. The bond strength of the two types of specimens differs by less than 12.4%.There is no effect on bond strength of concrete and steel when the rib spacing overruns about 10% while they are satisfied the anchorage length and lap length.

References:

Memo

Memo:
-
Last Update: 2016-03-30