Construction and Application of Risk Management Objective System of Construction Project Based on Multi-barrel Model(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2017年01期
Page:
121-126
Research Field:
Publishing date:

Info

Title:
Construction and Application of Risk Management Objective System of Construction Project Based on Multi-barrel Model
Author(s):
DONG Xiao-lin ZHAO Jia-hong ZHAO Li-juan WU Yang
School of Civil Engineering, Chang’an University
Keywords:
project management construction project risk management objective system multi-barrel model
PACS:
-
DOI:
-
Abstract:
According to the whole process of construction project, six major risks of construction project, including engineering risk, environmental risk, ecological risk, economic risk, safety risk and social risk were put forward, and the management objectives of the six risks and their mutual relations were analyzed. The risk management objective system of construction project was constructed and analyzed with multi-barrel model. Taking a project in a city subway line as an example, through the analysis of the project risk management objectives, the application of risk management objective system of construction project was studied. The results show that the risk management objective system composed of six risk management objectives of construction project can effectively control and reduce the occurrence of construction project risk, standardize and guide the construction project social stability risk analysis and assessment work, and maximize the social utility of construction project. The construction and application of risk management objective system of construction project are important guarantees for scientific and comprehensive management of construction project risk.