|Table of Contents|

Mechanical Performance of Beam-column Connection with Upper Flange Welded-lower Flange Bolted(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2019年05期
Page:
106-118
Research Field:
Publishing date:

Info

Title:
Mechanical Performance of Beam-column Connection with Upper Flange Welded-lower Flange Bolted
Author(s):
YU You-sheng12 YUAN Peng-cheng1 WANG Sheng3
(1. School of Civil Engineering, Qingdao University of Technology, Qingdao 266033, Shandong, China; 2. Cooperative Innovation Center of Engineering Construction and Safety in Shandong Blue Economic Zone, Qingdao University of Technology, Qingdao 266033, Shandong, China; 3. Qingjian Group Co., Ltd., Qingdao 266071, Shandong, China)
Keywords:
connection with upper flange welded-lower flange bolted mechanical performance low cycle reversed loading energy dissipation
PACS:
TU311
DOI:
-
Abstract:
In order to study the appearance sequence of plastic hinge and splicing slippages, and the proportion of energy dissipation of splicing, two groups of test specimens were designed by changing the cross-section area of flange splice plate. The finite element analysis of the new connection under monotonic and low cycle reversed loading was simulated by the ABAQUS software. Taking the BASE specimen of beam-column connection with upper flange welded-lower flange bolted as an example, the failure modes, hysteresis curves and skeleton curves of the BASE specimen of beam-column connection with upper flange welded-lower flange bolted were compared with those of the “HU” connection and the traditional bolted-welded hybrid connection designed with the same parameters. The results show that the deformation and the slipping of splicing can be fully developed when the cross-section area of flange splice plate is 2/3-1.0 times as large as the flange. The deformation and slipping of splicing cannot be fully developed when the cross-section area of splice plate is 1.0-4/3 times as large as the flange. Under low cycle reversed loading, the failure modes of the two groups of connections with upper flange welded-lower flange bolted are similar. When the interstory drift angle of beam end is about 0.024 rad, the lower flange and the splice plate begin to slip. When the interstory drift angle of beam end is about 0.036 rad, the plastic hinge appears on the cantilever beam. During the whole loading process, the energy dissipation of the deformation and the slipping of splicing account for 39%-45% of the total energy dissipation. The ductility, energy dissipation and deformation of BASE specimen of beam-column connection with upper flange welded-lower flange bolted are lower than those of the “HU” connection designed with the same parameters, but are slightly higher than those of the traditional bolted-welded hybrid connection.

References:

[1] 郝际平,孙晓岭,薛 强,等.绿色装配式钢结构建筑体系研究与应用[J].工程力学,2017,34(1):1-13.
HAO Ji-ping,SUN Xiao-ling,XUE Qiang,et al.Research and Applications of Prefabricated Steel Structure Building Systems[J].Engineering Mechanics,2017,34(1):1-13.
[2]郭志鹏,张爱林,刘学春,等.装配式钢框架节点带Z字形悬臂梁段和削弱梁段连接的抗震性能研究[J].建筑结构学报,2017,38(6):43-52.
GUO Zhi-peng,ZHANG Ai-lin,LIU Xue-chun,et al.Seismic Behavior of Prefabricated Steel Frame Connection with Z-shaped Cantilever Beam and Reduced Beam Section[J].Journal of Building Structures,2017,38(6):43-52.
[3]于长亮,郑 宏,袁晓洒,等.带侧板钢节点力学性能研究[J].建筑科学与工程学报,2012,29(4):74-82.
YU Chang-liang,ZHENG Hong,YUAN Xiao-sa,et al.Mechanical Behavior of Moment Resisting Connection with Side Plate Under Cyclic Loading[J].Journal of Architecture and Civil Engineering,2012,29(4):74-82.
[4]LEE K,LI R,CHEN L Y,et al.Cyclic Testing of Steel Column-tree Moment Connections with Various Beam Splice Lengths[J].Steel & Composite Structures,2014,16(2):221-231.
[5]WONG M F,CHUNG K F.Structural Behaviour of Bolted Moment Connections in Cold-formed Steel Beam-column Sub-frames[J].Journal of Constructional Steel Research,2002,58(2):253-274.
[6]SWATI A K,GAURANG V.Study of Steel Moment Connection with and Without Reduced Beam Section[J].Case Studies in Structural Engineering,2014,1:26-31.
[7]ABDOLLAHZADEH G,SHABANIAN S M.Experimental and Numerical Analysis of Beam to Column Joints in Steel Structures[J].Frontiers of Structural and Civil Engineering,2018,12(4):642-661.
[8]张爱林,张振宇,姜子钦,等.可修复的装配式钢框架梁柱节点非线性静力分析[J].建筑科学与工程学报,2017,34(4):1-8.
ZHANG Ai-lin,ZHANG Zhen-yu,JIANG Zi-qin,et al.Nonlinear Static Analysis of Repairable Prefabricated Steel Frame Beam-column Joint[J].Journal of Architecture and Civil Engineering,2017,34(4):1-8.
[9]贾连光,李红超,吴一红.低周反复荷载下蜂窝式钢框架梁柱节点性能试验研究[J].土木工程学报,2012,45(1):61-68.
JIA Lian-guang,LI Hong-chao,WU Yi-hong.Experimental Study of the Behavior of Beam-column Connections of Cellular Steel Frames Under Low-cyclic Reversed Loading[J].China Civil Engineering Journal,2012,45(1):61-68.
[10]卢林枫,钟丽丽,胡本峰,等.箱形节点域外伸端板弱轴连接的滞回性能研究[J].建筑科学与工程学报,2017,34(4):48-56.
LU Lin-feng,ZHONG Li-li,HU Ben-feng,et al.Research on Hysteretic Performance for Box Node Domain Extended End-plate Weak-axis Connection[J].Journal of Architecture and Civil Engineering,2017,34(4):48-56.
[11]李启才,苏明周,顾 强,等.带悬臂梁段拼接的梁柱连接循环荷载试验研究[J].建筑结构学报,2003,24(4):54-59.
LI Qi-cai,SU Ming-zhou,GU Qiang,et al.Experimental Study of Steel Beam-to-column Connection with Cantilever Beam Splicing Under Cyclic Loading[J].Journal of Building Structures,2003,24(4):54-59.
[12]KARAGIANNIS V,MALAGA-CHUQUITAYPE C,ELGHAZOULI A Y.Behaviour of Hybrid Timber Beam-to-tubular Steel Column Moment Connections[J].Engineering Structures,2017,131:243-263.
[13]焦燏烽,何敏娟,马人乐.新型带悬臂梁段栓-焊拼接节点力学性能研究[J].建筑钢结构进展,2015,17(4):10-18.
JIAO Yu-feng,HE Min-juan,MA Ren-le.Study on a New Cantilever Beam Joint with Bolted-welded Spliced Connections[J].Progress in Steel Building Structures,2015,17(4):10-18.
[14]卢林枫,林建军,胡本峰.H形梁翼缘双肋板加强式弱轴连接的抗震性能分析[J].建筑科学与工程学报,2017,34(3):47-55.
LU Lin-feng,LIN Jian-jun,HU Ben-feng.Analysis on Seismic Behavior of H-type Beam Flange Double Rib Reinforced Weak Axis Connection[J].Journal of Architecture and Civil Engineering,2017,34(3):47-55.
[15]OH K,LI R,CHEN L Y,et al.Cyclic Testing of Steel Column-tree Moment Connections with Weakened Beam Splices[J].International Journal of Steel Structures,2014,14(3):471-478.
[16]OH K,LEE K,CHEN L Y,et al.Seismic Performance Evaluation of Weak Axis Column-tree Moment Connections with Reduced Beam Section[J].Journal of Constructional Steel Research,2015,105:28-38.
[17]聂少锋,朱纪钊,马 轶,等.蜂窝梁-实腹柱十字形节点受力性能研究[J].建筑科学与工程学报,2018,35(4):63-71.
NIE Shao-feng,ZHU Ji-zhao,MA Yi,et al.Study on Mechanical Behavior of Castellated Beam-solid Column Cruciform Joints[J].Journal of Architecture and Civil Engineering,2018,35(4):63-71.
[18]LIU X C,CUI X X,YANG Z W,et al.Analysis of the Seismic Performance of Site-bolted Beam to Column Connections in Modularized Prefabricated Steel Structures[J].Advances in Materials Science and Engineering,2017,2017:1932730.
[19]OH K,SO J,HA H,et al.Seismic Performance Evaluation of Korean Column-tree Steel Moment Connections[J].International Journal of Steel Structures,2016,16(4):1287-1298.
[20]卢林枫,艾 龙,郝振奋,等.方管束腹板削弱型弱轴连接的抗震性能影响因素分析[J].建筑科学与工程学报,2019,36(2):64-76.
LU Lin-feng,AI Long,HAO Zhen-fen,et al.Analysis of Influence Factors on Hysteretic Behavior of Weak-axis Square Tubular Web RBS Connection[J].Journal of Architecture and Civil Engineering,2019,36(2):64-76.
[21]潘伶俐,陈以一.考虑竖向加劲肋作用的H形梁柱节点试验研究[J].建筑结构学报,2012,33(12):1-9.
PAN Ling-li,CHEN Yi-yi.Experimental Study on H-shaped Beam-to-column Connections with Vertical Stiffener[J].Journal of Building Structures,2012,33(12):1-9.
[22]DIAZ C,VICTORIA M,QUERIN O M,et al.FE Model of Three-dimensional Steel Beam-to-column Bolted Extended End-plate Joint[J].International Journal of Steel Structures,2018,18(3):843-867.
[23]MOU B,LI X,BAI Y T,et al.Numerical Evaluation on Shear Behavior of Irregular Steel Beam-to-CFST Column Connections[J].Journal of Constructional Steel Research,2018,148:422-435.
[24]郁有升,张颜颜,李建峰,等.一种新型梁柱装配式刚性节点滞回性能研究[J].建筑钢结构进展,2014,16(2):1-5,12.
YU You-sheng,ZHANG Yan-yan,LI Jian-feng,et al.Study on Hysteretic Behavior of a New Prefabricated Beam-to-column Rigid Connection[J].Progress in Steel Building Structures,2014,16(2):1-5,12.
[25]张孝栋.钢结构“互”型装配式刚性节点的试验及有限元研究[D].青岛:青岛理工大学,2016.
ZHANG Xiao-dong.Experiment and Finite Element Study of Steel Structure “HU” Assembly Rigid Connection[D].Qingdao:Qingdao University of Techno-logy,2016.
[26]JGJ/T 101—2015,建筑抗震试验规程[S].
JGJ/T 101—2015,Specification for Seismic Test of Buildings[S].
[27]FEMA-350,Recommended Seismic Design Criteria for New Steel Moment-frame Buildings[S].
[28]张爱林,郭志鹏,刘学春,等.悬臂梁段不同拼接方式下延性节点静力性能分析[J].北京工业大学学报,2017,43(5):770-779.
ZHANG Ai-lin,GUO Zhi-peng,LIU Xue-chun,et al.Analysis on Static Behavior of the Ductile Connections with Different Cantilever Beam Splices[J].Journal of Beijing University of Technology,2017,43(5):770-779.

Memo

Memo:
-
Last Update: 2019-09-29