[1] MROUEH H,SHAHROUR I.Three-dimensional Finite Element Analysis of the Interaction Between Tunneling and Pile Foundations[J].International Journal for Numerical and Analytical Methods in Geomechanics,2002,26(3):217-230.
[2]张陈蓉,黄茂松.基坑开挖引起的邻近建筑物桩基变形受力响应[J].岩土工程学报,2012,34(增):565-570.
ZHANG Chen-rong,HUANG Mao-song.Behavior of Pile Foundation Due to Excavation-induced Lateral Soil Movement[J].Chinese Journal of Geotechnical Engineering,2012,34(S):565-570.
[3]刘松玉,李洪江,童立元,等.地下工程开挖卸荷既有桩基承载响应物理模拟及新进展[J].岩土工程学报,2019,41(7):1329-1338.
LIU Song-yu,LI Hong-jiang,TONG Li-yuan,et al.Model Tests and New Progress of Pile Response Due to Underground Excavations[J].Chinese Journal of Geotechnical Engineering,2019,41(7):1329-1338.
[4]张治国,赵其华,徐 晨,等.基于影像源法的基坑开挖对邻近单桩影响简化分析[J].岩土力学,2016,37(7):2011-2020.
ZHANG Zhi-guo,ZHAO Qi-hua,XU Chen,et al.Simplified Analysis of Adjacent Single-pile Response Subjected to Foundation Pit Excavation Based on Virtual Image Technique[J].Rock and Soil Mechanics,2016,37(7):2011-2020.
[5]张爱军,莫海鸿,李爱国,等.基坑开挖对邻近桩基影响的两阶段分析方法[J].岩石力学与工程学报,2013,32(增1):2746-2750.
ZHANG Ai-jun,MO Hai-hong,LI Ai-guo,et al.Two-stage Analysis Method for Behavior of Adjacent Piles Due to Foundation Pit Excavation[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(S1):2746-2750.
[6]王 恒,陈福全,林 海.基坑开挖对邻近桥梁桩基的影响与加固分析[J].地下空间与工程学报,2015,11(5):1257-1265.
WANG Heng,CHEN Fu-quan,LIN Hai.Behaviors and Strengthening of Bridge Piles Subjected to Excavation-induced Soil Movement[J].Chinese Journal of Underground Space and Engineering,2015,11(5):1257-1265.
[7]丁勇春,王建华.深基坑施工对高架基础的变形影响及控制研究[J].土木工程学报,2012,45(7):155-161.
DING Yong-chun,WANG Jian-hua.Influence of Deep Excavation on Deformation of Elevated Bridge Foundations and Countermeasures[J].China Civil Engineering Journal,2012,45(7):155-161.
[8]木林隆,黄茂松.基坑开挖引起的周边土体三维位移场的简化分析[J].岩土工程学报,2013,35(5):820-827.
MU Lin-long,HUANG Mao-song.Simplified Method for Analysis of Soil Movement Induced by Excavations[J].Chinese Journal of Geotechnical Engineering,2013,35(5):820-827.
[9]王 翠,闫澍旺,张启斌.深基坑开挖对邻近桥桩的影响机制及控制措施研究[J].岩石力学与工程学报,2010,39(增1):2994-3000.
WANG Cui,YAN Shu-wang,ZHANG Qi-bin.Study of Influence of Deep Pit Excavation on Adjacent Bridge Foundation Piles[J].Chinese Journal of Rock Mechanics and Engineering,2010,39(S1):2994-3000.
[10]郑 刚,颜志雄,雷华阳,等.基坑开挖对临近桩基影响的实测及有限元数值模拟分析[J].岩土工程学报,2007,29(5):638-643.
ZHENG Gang,YAN Zhi-xiong,LEI Hua-yang,et al.Field Observation and Finite Element Numerical Simulation Analysis of Effect on Adjacent Piles Due to Excavation[J].Chinese Journal of Geotechnical Engineering,2007,29(5):638-643.
[11]郑俊杰,章荣军,潘玉涛,等.考虑开挖卸荷及变形耦合效应的被动桩分析方法[J].岩土工程学报,2012,34(4):606-614.
ZHENG Jun-jie,ZHANG Rong-jun,PAN Yu-tao,et al.Analytic Method for Passive Piles Considering Excavation-induced Unloading Effects and Deformation Coupling Effect[J].Chinese Journal of Geotechnical Engineering,2012,34(4):606-614.
[12]REZA B A,VOJTECH G.3D Numerical Parametric Study of the Influence of Open-pit Mining Sequence on Existing Tunnels[J].International Journal of Mining Science and Technology,2017,27(3):459-466.
[13]POULOS H G,CHEN L T.Pile Response Due to Excavation-induced Lateral Soil Movement[J].Journal of Geotechnical and Geoenvironmental Engineering,1997,123(2):94-99.
[14]张 骁,肖军华,农兴中,等.基于HS-Small模型的基坑近接桥桩开挖变形影响区研究[J].岩土力学, 2018,39(增2):263-273.
ZHANG Xiao,XIAO Jun-hua,NONG Xing-zhong,et al.Analysis of Influenced Zone of Foundation Pit Excavation Adjacent to Bridge Pile Foundation Using HS-Small Constitutive Model[J].Rock and Soil Mechanics,2018,39(S2):263-273.
[15]张治国,鲁明浩,宫剑飞.黏弹性地基中基坑开挖对邻近桩基变形影响的时域解[J].岩土力学,2017,38(10):3017-3028,3038.
ZHANG Zhi-guo,LU Ming-hao,GONG Jian-fei.Time-domain Solution for Influence of Excavation on Adjacent Pile Deformation in Visco-elastic Foundation[J].Rock and Soil Mechanics,2017,38(10):3017-3028,3038.
[16]黄茂松,张陈蓉,李 早.开挖条件下非均质地基中被动群桩水平反应分析[J].岩土工程学报,2008,30(7):1017-1023.
HUANG Mao-song,ZHANG Chen-rong,LI Zao.Lateral Response of Passive Pile Groups Due to Excavation-induced Soil Movement in Stratified Soils[J].Chinese Journal of Geotechnical Engineering,2008,30(7):1017-1023.
[17]BURMISTER D M.The General Theory of Stresses and Displacements in Layered Soil Systems.Ⅲ[J].Journal of Applied Physics,1945,16(3):126-127.
[18]KERR A D.On the Determination of Foundation Model Parameters[J].Journal of Geotechnical Engineering,1985,111(11):1334-1340.
[19]魏 纲,赵城丽.基坑开挖引起临近地铁隧道的附加荷载计算方法[J].岩石力学与工程学报,2016,35(增1):3408-3417.
WEI Gang,ZHAO Cheng-li.Calculation Method of Additional Load of Adjacent Metro Tunnels Due to Foundation Pit Excavation[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(S1):3408-3417.
[20]TANAHASHI H.Formulas for an Infinitely Long Bernoulli-Euler Beam on the Pasternak Model[J].Soils and Foundations,2004,44(5):109-118.
[21]SHI J,NG C W W,CHEN Y.Three-dimensional Numerical Parametric Study of the Influence of Basement Excavation on Existing Tunnel[J].Computers and Geotechnics,2015,63:146-158.
[22]VESIC A S.Bending of Beams Resting on Isotropic Elastic Solids[J].Journal of the Engineering Mechanics Division,1961,87(2):35-53.
[23]MORFIDIS K.Research and Development of Methods for the Modeling of Foundation Structural Elements and Soil[D].Thessaloniki:Aristotle University of Thessaloniki,2003.
---NEXT MATCH---收稿日期:2020-09-15
基金项目:国家自然科学基金项目(51778058,51378068); 中央高校基本科研业务费专项资金项目(300102219310)
作者简介:刘永健(1966-),男,江西玉山人,教授,博士研究生导师,工学博士,E-mail:liuyongjian@chd.edu.cn。