[1] WILLIAM Z.Thermal Behavior of Composite Bridges-insulated and Uninsulated[J].Highway Research Record,1965(76):231-253.
[2]WILLIAM Z.Simplified Design Check of Thermal Stresses in Composite Highway Bridges[J].Highway Research Record,1965(103):10-13.
[3]EMERSON M.Bridge Temperatures Estimated from the Shade Temperature[R].Wokingham:TRRL,1976.
[4]EMERSON M.The Calculation of the Distribution of Temperature in Bridges[R].Wokingham:TRRL,1973.
[5]刘兴法.混凝土结构的温度应力分析[M].北京:人民交通出版社,1991.
LIU Xing-fa.Analysis on the Temperature Stress of Concrete Structure[M].Beijing:China Communications Press,1991.
[6]郝 超.大跨度钢斜拉桥施工阶段非线性温度影响研究[J].公路交通科技,2003,20(1):63-66.
HAO Chao.Study on the Nonlinear Influence of Temperature on Long-span Steel Cable-stayed Bridge During Construction[J].Journal of Highway and Transportation Research and Development,2003,20(1):63-66.
[7]何 翔,方诗圣,方 飞,等.不同梯度温度作用下曲线桥梁的温度效应分析[J].合肥工业大学学报:自然科学版,2012,35(8):1088-1092.
HE Xiang,FANG Shi-sheng,FANG Fei,et al.Analysis of Temperature Effects of Curved Bridge Under Different Gradient Temperature Load[J].Journal of Hefei University of Technology:Natural Science,2012,35(8):1088-1092.
[8]周 浩,易岳林,叶仲韬,等.大跨度结合梁斜拉桥温度场及温度效应分析[J].桥梁建设,2020,50(5):50-55.
ZHOU Hao,YI Yue-lin,YE Zhong-tao,et al.Analysis of Temperature Field and Thermal Effect in Long-span Composite Girder Cable-stayed Bridge[J].Bridge Construction,2020,50(5):50-55.
[9]刘永健,刘 江,张 宁.桥梁结构日照温度作用研究综述[J].土木工程学报,2019,52(5):59-78.
LIU Yong-jian,LIU Jiang,ZHANG Ning.Review on Solar Thermal Actions of Bridge Structures[J].China Civil Engineering Journal,2019,52(5):59-78.
[10]季德钧,刘 江,张瑑芳,等.高原高寒地区钢-混凝土组合梁斜拉桥温度效应分析[J].建筑科学与工程学报,2016,33(1):113-119.
JI De-jun,LIU Jiang,ZHANG Zhuan-fang,et al.Temperature Effect Analysis of Steel-concrete Composite Girder Cable-stayed Bridge in Arctic-alpine Region[J].Journal of Architecture and Civil Engineering,2016,33(1):113-119.
[11]蒲黔辉,熊 赳,王文东.高低塔斜拉桥施工阶段温度效应分析[J].桥梁建设,2018,48(5):21-26.
PU Qian-hui,XIONG Jiu,WANG Wen-dong.Analysis of Temperature Effect of Cable-stayed Bridge with Unequal Height Pylons at Construction Stage[J].Bridge Construction,2018,48(5):21-26.
[12]李 伟.独塔混合梁斜拉桥施工及运营阶段温度影响分析[J].中外公路,2020,40(6):166-170.
LI Wei.Temperature Effect Analysis of Single Pylon Hybrid Girder Cable-stayed Bridge During Construction and Operation[J].Journal of China & Foreign Highway,2020,40(6):166-170.
[13]曾 洋,冯仲仁.混合梁斜拉桥塔梁同步施工中主塔偏位影响因素分析[J].中外公路,2017,37(6):205-209.
ZENG Yang,FENG Zhong-ren.Influence Factor Analysis on the Pylon Deviation During the Simultaneous Construction of Pylon and Girder of Hybrid Girder Cable-stayed Bridge[J].Journal of China & Foreign Highway,2017,37(6):205-209.
[14]刘广龙,刘 江,刘永健,等.西北极寒地区混凝土箱梁温度场实测与仿真分析[J].公路交通科技,2018,35(3):64-71.
LIU Guang-long,LIU Jiang,LIU Yong-jian,et al.Measurement and Simulation of Temperature Field of Concrete Box Girder in Northwest Severe Cold Area[J].Journal of Highway and Transportation Research and Development,2018,35(3):64-71.
[15]刘永健,刘 江.钢-混凝土组合梁桥温度作用及效应研究综述[J].交通运输工程学报,2020,20(1):42-59.
LIU Yong-jian,LIU Jiang.Review on Temperature Action and Effect of Steel-concrete Composite Girder Bridge[J].Journal of Traffic and Transportation Engineering,2020,20(1):42-59.
[16]刘 江,刘永健,白永新,等.混凝土箱梁温度梯度模式的地域差异性及分区研究[J].中国公路学报,2020,33(3):73-84.
LIU Jiang,LIU Yong-jian,BAI Yong-xin,et al.Regional Variation and Zoning of the Temperature Gradient Pattern of Concrete Box Girder[J].China Journal of Highway and Transport,2020,33(3):73-84.
[17]刘 江,刘永健,房建宏,等.高原高寒地区“上”形钢-混凝土组合梁的竖向温度梯度模式[J].交通运输工程学报,2017,17(4):32-44.
LIU Jiang,LIU Yong-jian,FANG Jian-hong,et al.Vertical Temperature Gradient Patterns of 上-shaped Steel-concrete Composite Girder in Arctic-alpine Region[J].Journal of Traffic and Transportation Engineering,2017,17(4):32-44.
[18]LIU J,LIU Y J,JIANG L,et al.Long-term Field Test of Temperature Gradients on the Composite Girder of a Long-span Cable-stayed Bridge[J].Advances in Structural Engineering,2019,22(13):2785-2798.
[19]张 宁,刘永健,刘 江,等.高原高寒地区H形混凝土桥塔日照温度效应[J].交通运输工程学报,2017,17(4):66-77.
ZHANG Ning,LIU Yong-jian,LIU Jiang,et al.Temperature Effects of H-shaped Concrete Pylon in Arctic-alpine Plateau Region[J].Journal of Traffic and Transportation Engineering,2017,17(4):66-77.
[20]LIU J,LIU Y J,ZHANG Z J.Numerical Simulation on Thermo-mechanical Coupling Behavior of Early-age Concrete in the Large-scale Steel-concrete Connecting Segment of a Hybrid Girder Cable-stayed Bridge[J].Journal of Bridge Engineering,2020,25(11):05020009.
[21]DILGER W H,GHALI A,CHAN M,et al.Temperature Stresses in Composite Box Girder Bridges[J].Journal of Structural Engineering,1983,109(6):1460-1478.
[22]闫 雯.钢管混凝土拱肋截面温度场及温度效应分析[D].西安:长安大学,2008.
YAN Wen.Analysis on Temperature Field and Its Effect of Concrete Filled Steel Tubular Rib Section[D].Xi'an:Chang'an University,2008.
[23]LIU J,LIU Y J,ZHANG N,et al.Research on Temperature Action and Cracking Risk of Steel-concrete Composite Girder During the Hydration Process[J].Archives of Civil and Mechanical Engineering,2020,20(2):47.
[24]刘来君,贺拴海,宋一凡.大跨径桥梁施工控制温度应力分析[J].中国公路学报,2004,17(1):53-56.
LIU Lai-jun,HE Shuan-hai,SONG Yi-fan.Analysis of Temperature Stress in Control of Long-span Bridge Construction[J].China Journal of Highway and Transport,2004,17(1):53-56.
[25]张元海,李 乔.桥梁结构日照温差二次力及温度应力计算方法研究[J].中国公路学报,2004,17(1):49-52.
ZHANG Yuan-hai,LI Qiao.Study of the Method for Calculation of the Thermal Stress and Secondary Force of Bridge Structure by Solar Radiation[J].China Journal of Highway and Transport,2004,17(1):49-52.
[26]徐 达,王定文.MIDAS/Civil桥梁结构分析技巧与实例[M].北京:中国建筑工业出版社,2015.
XU Da,WANG Ding-wen.Bridge Structure Analysis Skills and Examples Based on MIDAS/Civil[M].Beijing:China Architecture & Building Press,2015.
[27]JTG/T 3365-01—2020,公路斜拉桥设计规范[S].
JTG/T 3365-01—2020,Specifications for Design of Highway Cable-stayed Bridge[S].