[1] 陈宝春,庄一舟,黄福云.无伸缩缝桥梁[M].2版.北京:人民交通出版社,2019.
CHEN Bao-chun,ZHUANG Yi-zhou,HUANG Fu-yun.Jointless Bridges[M].2nd ed.Beijing:China Communications Press,2019.
[2]BURKE JR M P.Integral & Semi-integral Bridges[M].Oxford:Wiley-blackwell,2009.
[3]陈宝春,付 毳,庄一舟,等.中国无伸缩缝桥梁应用现状与发展对策[J].中外公路,2018,38(1):87-95.
CHEN Bao-chun,FU Cui,ZHUANG Yi-zhou,et al.The Application Status and Development Strategy of Jointless Bridges in China[J].Journal of China & Foreign Highway,2018,38(1):87-95.
[4]公路无伸缩缝桥梁技术规程:T/CECS G:D60-01—2020[S].北京:人民交通出版社,2020.
Technical Specification for Highway Jointless Bridges:T/CECS G:D60-01—2020[S].Beijing:China Communications Press,2020.
[5]公路无伸缩缝桥梁技术规程:DB13/T 2482—2017[S].石家庄:河北省交通运输厅,2017.
Technical Specifications for Highway Jointless Bridges:DB13/T 2482—2017[S].Shijiazhuang:Transportation Department of Hebei Province,2017.
[6]福建省城市无伸缩缝桥梁技术规程:DBJ/T 13-265-2017[S].福州:福建省住房和城乡建设厅,2017.
Technical Specifications for Municipal Jointless Bridges in Fujian Province:DBJ/T 13-265-2017[S].Fuzhou:Department of Housing and Urban-rural Development of Fujian Province,2017.
[7]中华人民共和国交通运输部.2020年我国交通运输行业发展统计公报发布[J].隧道建设(中英文),2021,41(6):963.
Ministry of Transport of the People's Republic of China.Announcement of the Statistical Communique on the Development of China's Transportation Industry in 2020[J].Tunnel Construction,2021,41(6):963.
[8]MARURI R F,PETRO S.Integral Abutments and Jointless Bridges(IAJB)2004 Survey Summary[C]//West Virginia University.Integral Abutment and Jointless Bridges(IAJB 2005).Baltimore:West Virginia University,2005:12-29.
[9]PARASCHOS A,AMDE A.A Survey on the Status of Use,Problems,and Costs Associated with Integral Abutment Bridges[R].Washington DC:FHWA,2010.
[10]公路桥涵设计通用规范:JTG D60—2015[S].北京:人民交通出版社,2015.
General Specifications for Design of Highway Bridges and Culverts:JTG D60—2015[S].Beijing:China Communications Press,2015.
[11]金晓勤,邵旭东.半整体式全无缝桥梁研究[J].土木工程学报,2009,42(9):68-73.
JIN Xiao-qin,SHAO Xu-dong.A Study of Fully Jointless Bridge-approach System with Semi-integral Abutment[J].China Civil Engineering Journal,2009,42(9):68-73.
[12]RAZZAQ M K,SENNAH K,GHRIB F.Effect of Sequence of Construction on the Moment Distribution of Skewed Integral Abutment Bridges[C]//BRISEGHELLA B.Proceeding of the 1st International Symposium on Jointless & Sustainable Bridges.Fuzhou:Fuzhou University,2016:42-53.
[13]许 震,罗小烨,卢 琪,等.整体式弯桥试设计研究[J].建筑科学与工程学报,2019,36(6):104-111.
XU Zhen,LUO Xiao-ye,LU Qi,et al.Trial-design Study on Integral Curved Bridge[J].Journal of Architecture and Civil Engineering,2019,36(6):104-111.
[14]陈宝春,苏家战,赵 秋,等.桥梁工程[M].4版.北京:人民交通出版社,2022.
CHEN Bao-chun,SU Jia-zhan,ZHAO Qiu,et al.Bridge Engineering[M].4th ed.Beijing:China Communications Press,2022.
[15]HONG Y S.Analysis and Design of Link Slabs in Jointless Bridges with Fibre-reinforced Concrete[D].Waterloo:University of Waterloo,2014.
[16]HOU M J,HU K X,YU J T,et al.Experimental Study on Ultra-high ductility Cementitious Composites Applied to Link Slabs for Jointless Bridge Decks[J].Composite Structures,2018,204:167-177.
[17]BRISEGHELLA Bruno,唐玉风,薛俊青,等.无伸缩缝桥梁引板研究综述[J].福州大学学报(自然科学版),2021,49(2):209-216.
BRISEGHELLA Bruno,TANG Yu-feng,XUE Jun-qing,et al.Review of Research on Approach Slabs in Jointless Bridges[J].Journal of Fuzhou University(Natural Science Edition),2021,49(2):209-216.