[1] 刘 华,胡文乐,王铁行,等.碱液加固黄土的电阻率特征试验及其效果评价[J].建筑科学与工程学报,2021,38(2):99-107.
LIU Hua,HU Wen-le,WANG Tie-hang,et al.Resistivity Characteristics Test and Effect Evaluation of Alkali Solution Strengthening Loess[J].Journal of Architecture and Civil Engineering,2021,38(2):99-107.
[2]MA L Q,YANG K,YUAN W Z,et al.Centrifuge Modeling of the Pile Foundation Reinforcement on Slopes Subjected to Uneven Settlement[J].Bulletin of Engineering Geology and the Environment,2020,79(5):2647-2658.
[3]LIN P,ZHOU W Y,LIU H Y.Experimental Study on Cracking,Reinforcement,and Overall Stability of the Xiaowan Super-high Arch Dam[J].Rock Mechanics and Rock Engineering,2015,48(2):819-841.
[4]朱彦鹏,王海明,杨奎斌,等.桩基础高层建筑纠倾加固方法及工程实践[J].建筑科学与工程学报,2018,35(3):87-94.
ZHU Yan-peng,WANG Hai-ming,YANG Kui-bin,et al.Rectifying and Strengthening Method for Pile Foundation of High-rise Building and Engineering Practice[J].Journal of Architecture and Civil Engineering,2018,35(3):87-94.
[5]阳军生,杨元洪,晏 莉,等.大断面隧道下穿既有高压输电铁塔施工方案比选及其应用[J].岩石力学与工程学报,2012,31(6):1184-1191.
YANG Jun-sheng,YANG Yuan-hong,YAN Li,et al.Construction Scheme Choice of Large-span Tunnels Under-passing High Voltage Transmission Tower and Its Application[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(6):1184-1191.
[6]朱彦鹏,陈琰娇.抛石挤淤加固公路软基机理研究[J].建筑科学与工程学报,2016,33(4):17-24.
ZHU Yan-peng,CHEN Yan-jiao.Study on Mechanism of Reinforcing Soft Soil Foundation of Highway by Dumping Riprap to Extrude Silt[J].Journal of Architecture and Civil Engineering,2016,33(4):17-24.
[7]曹明星,高永涛,周 喻.基于树根桩地基加固法的井塔纠偏方案[J].中南大学学报(自然科学版),2020,51(10):2906-2916.
CAO Ming-xing,GAO Yong-tao,ZHOU Yu.Correction Scheme of Auxiliary Shaft Tower Based on Foundation Reinforcement Method Using Root Piles[J].Journal of Central South University(Science and Technology),2020,51(10):2906-2916.
[8]文颖文,刘松玉,胡明亮,等.地下增层工程中既有结构变形控制技术研究[J].岩土工程学报,2013,35(10):1914-1921.
WEN Ying-wen,LIU Song-yu,HU Ming-liang,et al.Deformation Control Techniques for Existing Buildings During Construction Process of Basement[J].Chinese Journal of Geotechnical Engineering,2013,35(10):1914-1921.
[9]ZHOU M,SU X L,LEI J S,et al.Foundation Reinforcement and Deviation Rectifying of the Leaning Pagoda of Dinglin Temple[J].Proceedings of the Institution of Civil Engineers — Geotechnical Engineering,2019,173(6):473-484.
[10]刘念武,张忠苗,俞 峰,等.黏性土中微型桩抗压和抗拔现场试验[J].天津大学学报(自然科学与工程技术版),2013,46(8):698-704.
LIU Nian-wu,ZHANG Zhong-miao,YU Feng,et al.Field Tests on Micropiles in Clay Subjected to Compression and Uplift[J].Journal of Tianjin University(Science and Technology),2013,46(8):698-704.
[11]陈 贺,张玉芳,张新民,等.高压注浆钢花管微型桩抗滑特性足尺模型试验研究[J].岩土力学,2020,41(2):428-436.
CHEN He,ZHANG Yu-fang,ZHANG Xin-min,et al.Full-scale Model Experiments on Anti-sliding Characteristics of High-pressure Grouting Steel-tube Micropiles[J].Rock and Soil Mechanics,2020,41(2):428-436.
[12]潘 健,袁文俊,韦莎丽,等.微型钢管灌注桩的竖向承载性状研究[J].岩土工程学报,2019,41(增1):77-80.
PAN Jian,YUAN Wen-jun,WEI Sha-li,et al.Shaft Bearing Behaviors of Micro Cast-place Piles with Steel Tubes[J].Chinese Journal of Geotechnical Engineering,2019,41(S1):77-80.
[13]WEN L,KONG G Q,LI Q S,et al.Field Tests on Axial Behavior of Grouted Steel Pipe Micropiles in Marine Soft Clay[J].International Journal of Geomechanics,2020,20(6):06020006.
[14]WEN L,KONG G Q,ABUEL-NAGA H,et al.Rectification of Tilted Transmission Tower Using Micropile Underpinning Method[J].Journal of Performance of Constructed Facilities,2020,34(1):04019110.
[15]HAQUE M N,ABU-FARSAKH M Y,TSAI C.Field Investigation to Evaluate the Effects of Pile Installation Sequence on Pile Setup Behavior for Instrumented Test Piles[J].Geotechnical Testing Journal,2016,39(5):769-785.
[16]张建新,鹿 群,吴东云,等.基于模型试验的静压群桩引起的土体变形分析[J].岩土力学,2010,31(4):1243-1246,1252.
ZHANG Jian-xin,LU Qun,WU Dong-yun,et al.Analysis of Soil Deformation in Jacked Pile Group Based on the Model Test[J].Rock and Soil Mechanics,2010,31(4):1243-1246,1252.
[17]解廷伟,左殿军,王绪锋,等.静压桩沉桩过程中地下排污管的动态响应数值分析[J].水利学报,2015,46(增1):168-172.
XIE Ting-wei,ZUO Dian-jun,WANG Xu-feng,et al.Numerical Study on Dynamic Response of Underground Sewage Disposal Pipe Due to Pile Jacked[J].Journal of Hydraulic Engineering,2015,46(S1):168-172.
[18]宋福贵,王炳龙,黄大维,等.钢套管灌注群桩施工顺序对多隧道的影响[J].岩土力学,2012,33(8):2330-2336.
SONG Fu-gui,WANG Bing-long,HUANG Da-wei,et al.Influence of Construction Sequence of Cast-in-place Group Piles with Steel Sleeve on Tunnels[J].Rock and Soil Mechanics,2012,33(8):2330-2336.
[19]钱 程.超长钢管静压桩加固既有建筑物的应用研究[D].南京:东南大学,2017.
QIAN Cheng.Study on the Application of Super-long Steel Tube Static Pressure Pile in Strengthening Existing Buildings[D].Nanjing:Southeast University,2017.
[20]建筑地基基础设计规范:GB 50007—2011[S].北京:中国建筑工业出版社,2012.
Code for Design of Building Foundation:GB 50007—2011[S].Beijing:China Architecture & Building Press,2012.
[21]文颖文,胡明亮,韩顺有,等.既有建筑地下室增设中锚杆静压桩技术应用研究[J].岩土工程学报,2013,35(增2):224-229.
WEN Ying-wen,HU Ming-liang,HAN Shun-you,et al.Application of Static Bolt-pile Technique to Construction of Basement of Existing Buildings[J].Chinese Journal of Geotechnical Engineering,2013,35(S2):224-229.