[1] 徐 飞,张同晓,石少帅,等.铁路隧道横洞进主洞关键技术及施工方案优化[J].科学技术与工程,2016,16(32):288-295.
XU Fei,ZHANG Tongxiao,SHI Shaoshuai,et al.Key technique and construction scheme optimization for the intersection of the horizontal adit and main tunnel of railway tunnels[J].Science Technology and Engineering,2016,16(32):288-295.
[2]邵珠山,赵 鑫.基于隧道施工诱发地表沉降随机介质理论预测模型的拓展[J].长安大学学报(自然科学版),2021,41(6):73-81.
SHAO Zhushan,ZHAO Xin.Based on extension of stochastic medium theory prediction model for surface subsidence induced by tunnel construction[J].Journal of Chang'an University(Natural Science Edition),2021,41(6):73-81.
[3]杨晓华,赵滨京,吴 昊,等.千枚岩深埋隧道支护参数对结构受力与变形的影响[J].建筑科学与工程学报,2020,37(3):108-117.
YANG Xiaohua,ZHAO Binjing,WU Hao,et al.Influence of supporting parameters of phyllite deep tunnel on structural stress and deformation[J].Journal of Architecture and Civil Engineering,2020,37(3):108-117.
[4]罗彦斌,陈建勋.黏弹性条件下大跨度公路黄土隧道二次衬砌施作时机[J].长安大学学报(自然科学版),2021,41(5):86-95.
LUO Yanbin,CHEN Jianxun.Construction time of secondary lining of large span loess tunnel under viscoelasticity condition[J].Journal of Chang'an University(Natural Science Edition),2021,41(5):86-95.
[5]JONEIDI M,GOLSHANI A,NAEIMIFAR I.Progressive deformation and mechanical behaviour of intersecting tunnels in soft ground[J].Proceedings of the Institution of Civil Engineers:Ground Improvement,2019,172(4):285-296.
[6]BIAN K,LIU J,XIAO M,et al.Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou pumped storage power station[J].Tunnelling and Underground Space Technology,2016,54:123-134.
[7]邓 碧,张俊伟,诸葛绪松,等.软土地层并行曲线隧道施工顺序对既有隧道的影响[J].建筑科学与工程学报,2021,38(6):170-176.
DENG Bi,ZHANG Junwei,ZHUGE Xusong,et al.Influence of construction sequence of parallel curved tunnels on existing tunnels in soft soil stratum[J].Journal of Architecture and Civil Engineering,2021,38(6):170-176.
[8]张立鑫,陈丽俊,陈建勋,等.单斜构造软硬互层围岩隧道变形特征及控制对策[J].建筑科学与工程学报,2021,38(6):186-196.
ZHANG Lixin,CHEN Lijun,CHEN Jianxun,et al.Deformation characteristics and treatment measures of tunnels in soft and hard interbedded surrounding rock with tilted stratum[J].Journal of Architecture and Civil Engineering,2021,38(6):186-196.
[9]薛 平,王长帅.某输水隧洞斜井进入主洞挑顶施工关键技术[J].现代隧道技术,2019,56(增2):688-692.
XUE Ping,WANG Changshuai.Key roof ripping construction technology for the transition section from the inclined shaft to main tunnel:case study of a water conveyance tunnel[J].Modern Tunnelling Technology,2019,56(S2):688-692.
[10]薛模美,胡恒福.客运专线隧道斜井转正洞施工技术研究[J].铁道标准设计,2008,52(4):90-93.
XUE Momei,HU Hengfu.Study on construction technology of inclined shaft turning into positive tunnel in passenger dedicated line tunnel[J].Railway Standard Design,2008,52(4):90-93.
[11]于家武,龙文华,郭新新,等.预应力锚索支护技术在高地应力大跨径隧道挑顶施工中的应用——以渭武高速公路木寨岭隧道为例[J].隧道建设(中英文),2021,41(8):1392-1398.
YU Jiawu,LONG Wenhua,GUO Xinxin,et al.Application of prestressed anchor cable supporting technology in roof ripping construction of long-span tunnel with high geostress:a case study of Muzhailing tunnel of Weiyuan-Wudu expressway[J].Tunnel Construction,2021,41(8):1392-1398.
[12]刘 毅,张 勇,彭 振,等.大跨地铁隧道斜井进洞垂直挑顶施工关键技术[J].现代隧道技术,2020,57(4):201-207.
LIU Yi,ZHANG Yong,PENG Zhen,et al.Vertical roof ripping construction techniques for excavation of main tunnel from inclined shaft:a case study of the large-span metro tunnel in soft surrounding rock[J].Modern Tunnelling Technology,2020,57(4):201-207.
[13]闫自海,章立峰,路军富,等.城市地下立交隧道交叉口施工方法研究[J].现代隧道技术,2019,56(1):176-184.
YAN Zihai,ZHANG Lifeng,LU Junfu,et al.Study on construction method of the intersection of the urban underground interchange tunnel[J].Modern Tunnelling Technology,2019,56(1):176-184.
[14]宋金贵.横洞进正洞交叉口设计优化方案研究[J].隧道建设,2017,37(增1):168-173.
SONG Jingui.Study of optimization scheme of design of connection section between horizontal gallery and main tunnel[J].Tunnel Construction,2017,37(S1):168-173.
[15]安永林,欧阳鹏博,彭立敏,等.深大竖井及转隧道正洞施工技术与安全分析[J].现代隧道技术,2018,55(2):164-173.
AN Yonglin,OUYANG Pengbo,PENG Limin,et al.Construction techniques and safety analysis for a deep vertical shaft and vertical shaft shifting to main tunnel[J].Modern Tunnelling Technology,2018,55(2):164-173.
[16]焦华喆,董腾飞,陈新明,等.大断面隧道三岔口段施工技术及围岩变形规律[J].公路交通科技,2019,36(8):100-107.
JIAO Huazhe,DONG Tengfei,CHEN Xinming,et al.Construction technology for fork road of large section tunnel and deformation rule of surrounding rock[J].Journal of Highway and Transportation Research and Development,2019,36(8):100-107.
[17]张洪达.软弱地层辅助坑道进隧道正洞上联洞+门架法挑顶施工技术[J].隧道建设(中英文),2021,41(12):2150-2156.
ZHANG Hongda.Construction technology of roof lifting using portal frame method of auxiliary tunnel entering main tunnel in soft stratum[J].Tunnel Construction,2021,41(12):2150-2156.
[18]刘 毅,贺祖浩,王志敏,等.破碎围岩条件下隧道挑顶施工技术研究[J].现代隧道技术,2020,57(6):200-206.
LIU Yi,HE Zuhao,WANG Zhimin,et al.Research on roof-ripping construction technology for tunnels under fractured surrounding rock conditions[J].Modern Tunnelling Technology,2020,57(6):200-206.
[19]杨晓华,曹扬帆,肖 靖,等.开挖方式对跨基覆界面浅埋偏压隧道变形的影响分析[J/OL].建筑科学与工程学报:1-14[2023-03-10].http://kns.cnki.net/kcms/detail/61.1442.tu.20211230.1338.024.html.
YANG Xiaohua,CAO Yangfan,XIAO Qing,et al.Analysis of the influence of excavation methods on the deformation of shallow-buried unsymmetrical loaded tunnels across the base and cover interface[J/OL].Journal of Architecture and Civil Engineering:1-14[2023-03-10].http://kns.cnki.net/kcms/detail/61.1442.tu.20211230.1338.024.html.
[20]章 剑,高 波,周佳媚,等.软弱围岩斜井转正洞工法动态施工力学行为分析[J].现代隧道技术,2013,50(2):46-51.
ZHANG Jian,GAO Bo,ZHOU Jiamei,et al.Analysis of dynamic mechanical behavior during construction from an inclined shaft to the main tunnel in soft surrounding rock[J].Modern Tunnelling Technology,2013,50(2):46-51.
[21]王景春,张天陆,王炳华,等.施工通道与站台隧道三岔口段施工方法及力学行为研究[J].铁道科学与工程学报,2021,18(10):2694-2702.
WANG Jingchun,ZHANG Tianlu,WANG Binghua,et al.Research on construction method and dynamic mechanical behavior of three-fork section of construction passage and station tunnel[J].Journal of Railway Science and Engineering,2021,18(10):2694-2702.
[22]陈佳玮,李元海,刘 毅.地铁大跨度隧道垂直挑顶施工中的围岩力学分析[J].城市轨道交通研究,2022,25(7):192-196,202.
CHEN Jiawei,LI Yuanhai,LIU Yi.Analysis of surrounding rock mechanical behavior of metro large-span tunnel vertical propping construction[J].Urban Mass Transit,2022,25(7):192-196,202.
[23]罗彦斌,陈建勋,王梦恕.隧道斜交横通道施工对主隧道衬砌结构的影响研究[J].岩石力学与工程学报,2010,29(增2):3792-3798.
LUO Yanbin,CHEN Jianxun,WANG Mengshu.Study of influence of skew horizontal adit tunnel construction on main tunnel lining structure[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(S2):3792-3798.
[24]饶军应,谢财进,赵 霞,等.深埋隧洞三岔口围岩稳定性计算理论[J].中南大学学报(自然科学版),2019,50(8):1949-1959.
RAO Junying,XIE Caijin,ZHAO Xia,et al.Theoretical stability calculation of surrounding rocks in divergence of deep tunnel[J].Journal of Central South University(Science and Technology),2019,50(8):1949-1959.
[25]李连祥,张永磊,扈学波.基于PLAXIS 3D有限元软件的某坑中坑开挖影响分析[J].地下空间与工程学报,2016,12(增1):254-261,266.
LI Lianxiang,ZHANG Yonglei,HU Xuebo.Finite element analysis of a pit-in-pit excavation based on PLAXIS 3D[J].Chinese Journal of Underground Space and Engineering,2016,12(S1):254-261,266.
[26]牛方义.钢纤维喷射混凝土的数值建模及其在隧洞支护衬砌中的应用[D].北京:北京交通大学,2020.
NIU Fangyi.Numerical simulation for steel fiber reinforced shotcrete and its application to tunnel lining[D].Beijing:Beijing Jiaotong University,2020.