[1] 新华社.中共中央 国务院印发《交通强国建设纲要》[EB/OL].(2019-09-19)[2023-04-11].http://www.gov.cn/zhengce/2019-09/19/content_5431432.htm.
Xinhua News Agency.The CPC Central Committee and State Council issued Outline of Building a Strong Transportation Country[EB/OL].(2019-09-19)[2023-04-11].http://www.gov.cn/zhengce/2019-09/19/content_5431432.htm.
[2]张建均,荣春堂.锦屏二级水电站涨壳式预应力中空注浆锚杆施工[J].水力发电,2008,34(9):43-45.
ZHANG Jianjun,RONG Chuntang.Construction technique of expanding-shell pre-stressed hollow pouring anchorage rod of Jinping cascade-II hydropower station[J].Water Power,2008,34(9):43-45.
[3]张全彪.锦屏二级水电站机械涨壳式预应力中空注浆锚杆施工技术[J].水利水电技术,2008,39(11):46-48.
ZHANG Quanbiao.Construction technology of mechanical shell expansion prestressed hollow grouting anchor rod in Jinping Ⅱ hydropower station[J].Water Resources and Hydropower Engineering,2008,39(11):46-48.
[4]卢小刚.涨壳式预应力中空锚杆的研究与应用[J].铁道建筑技术,2009(11):96-98,121.
LU Xiaogang.Study and application of the expanding-shell pre-stressed hollow anchor rod[J].Railway Construction Technology,2009(11):96-98,121.
[5]冯 艺,石 钊,张照太,等.涨壳式中空预应力锚杆在TBM法隧洞施工中的应用和改进[J].现代隧道技术,2011,48(1):160-164.
FENG Yi,SHI Zhao,ZHANG Zhaotai,et al.Application and modification of swelling prestressed bolts in a TBM excavated tunnel[J].Modern Tunnelling Technology,2011,48(1):160-164.
[6]杨瑞莲,刘 文.大型地下洞室高边墙围岩固壁预应力锚固新技术研究[J].隧道建设,2010,30(4):439-445,464.
YANG Ruilian,LIU Wen.Study on prestressed anchoring technology used in large-scale underground power plant[J].Tunnel Construction,2010,30(4):439-445,464.
[7]吴大伟,吴爱军,苏华友.大断面巷道中空预应力注浆锚杆的支护效果研究[J].中国安全生产科学技术,2015,11(8):90-95.
WU Dawei,WU Aijun,SU Huayou.Study on support effect of hollow pre-stress grouting anchor in large section roadway[J].Journal of Safety Science and Technology,2015,11(8):90-95.
[8]刘 江,王 军,徐腾辉.涨壳式预应力中空锚杆在机械化开挖大断面隧道中的施工应用研究[J].隧道建设(中英文),2018,38(增2):324-329.
LIU Jiang,WANG Jun,XU Tenghui.Research of swelling prestressed bolts using in mechanized excavation of large section tunnel[J].Tunnel Construction,2018,38(S2):324-329.
[9]张喜涛,苏华友,吴爱军,等.预应力中空注浆锚杆锚固机理与参数分析[J].中国安全生产科学技术,2015,11(9):31-37.
ZHANG Xitao,SU Huayou,WU Aijun,et al.Analysis on anchoring mechanism and parameters of prestressed hollow grouting bolt[J].Journal of Safety Science and Technology,2015,11(9):31-37.
[10]陈 琼,庞 琦,隋学华,等.涨壳式中空锚杆抗冲击性能现场试验研究[J].价值工程,2019,38(34):130-131.
CHEN Qiong,PANG Qi,SUI Xuehua,et al.Field test study on impact resistance of shell-type hollow anchor[J].Value Engineering,2019,38(34):130-131.
[11]吴德兴,汪 波,孙 钧.新型锚杆支护技术与工程实践[M].上海:上海科学技术出版社,2020.
WU Dexing,WANG Bo,SUN Jun.New bolt support technology and engineering practice[M].Shanghai:Shanghai Scientific & Technical Publishers,2020.
[12]汪 波,何 川.预应力中空注浆锚杆在苍岭隧道防岩爆设计中的应用[J].公路,2011,56(10):206-210.
WANG Bo,HE Chuan.Application of prestressed hollow grouting anchor in rock burst prevention design of cangling tunnel[J].Highway,2011,56(10):206-210.
[13]汪 波,喻 炜,刘锦超,等.交通/水工隧道中基于预应力锚固系统的及时主动支护理念及其技术实现[J].中国公路学报,2020,33(12):118-129.
WANG Bo,YU Wei,LIU Jinchao,et al.Timely-active support theory and its application in transportation/hydraulic tunnels based on pre-stressed anchorage system[J].China Journal of Highway and Transport,2020,33(12):118-129.
[14]朱珍德,舒晓云,陈卫忠,等.一种改进的中空注浆锚杆连接段螺纹参数优化分析[J].煤炭学报,2022,47(6):2300-2310.
ZHU Zhende,SHU Xiaoyun,CHEN Weizhong,et al.Optimization analysis on thread connection parameters of an improved hollow grouting bolt[J].Journal of China Coal Society,2022,47(6):2300-2310.
[15]陈昌富,朱世民,高 傑,等.考虑注浆压力影响锚-土界面剪切蠕变Kriging模型[J].岩土工程学报,2019,41(增1):125-128.
CHEN Changfu,ZHU Shimin,GAO Jie,et al.Kriging method-based creep model for anchor-soil interface considering grouting pressure[J].Chinese Journal of Geotechnical Engineering,2019,41(S1):125-128.
[16]陈昌富,刘俊斌,徐优林,等.锚-土界面剪切蠕变试验及其经验模型研究[J].岩土工程学报,2016,38(10):1762-1768.
CHEN Changfu,LIU Junbin,XU Youlin,et al.Tests on shearing creep of anchor-soil interface and its empirical model[J].Chinese Journal of Geotechnical Engineering,2016,38(10):1762-1768.
[17]许万忠,曹 平,彭振斌,等.考虑弱面注浆因素对加锚层理边坡抗剪性能影响的力学机制分析[J].岩石力学与工程学报,2006,25(7):1475-1480.
XU Wanzhong,CAO Ping,PENG Zhenbin,et al.Analysis of mechanical mechanism of shear characteristic of bolted layered slope considering grouting factor of weak plane[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1475-1480.
[18]叶新宇,彭 锐,马新岩,等.压密效应对新型压密注浆土钉的强化研究[J].岩土工程学报,2021,43(9):1649-1656,1738.
YE Xinyu,PENG Rui,MA Xinyan,et al.Enhancement of compaction grouting on a compaction-grouted soil nail in sand[J].Chinese Journal of Geotechnical Engineering,2021,43(9):1649-1656,1738.
[19]张广兴,管林波.压力注浆参数对土钉受力性状影响的试验研究[J].岩土工程学报,2014,36(增2):489-494.
ZHANG Guangxing,GUAN Linbo.Experimental study on effect of pressure grouting parameters on bearing capacity behavior of soil nailings[J].Chinese Journal of Geotechnical Engineering,2014,36(S2):489-494.
[20]HONG C Y,YIN J H,PEI H,et al.Experimental study on the pullout resistance of pressure-grouted soil nails in the field[J].Canadian Geotechnical Journal,2013,50:693-704.
[21]YIN J H,ZHOU W H.Influence of grouting pressure and overburden stress on the interface resistance of a soil nail[J].Journal of Geotechnical and Geoenvironmental Engineering,2009,135(9):1198-1208.
[22]WANG Q,YE X Y,WANG S Y,et al.Experimental investigation of compaction grouted soil nails[J].Canadian Geotechnical Journal,2017,54(12):1728-1738.
[23]陈育民,徐鼎平.FLAC/FLAC3D基础与工程实例[M].2版.北京:中国水利水电出版社,2013.
CHEN Yumin,XU Dingping.FLAC/FLAC3D foundation and engineering example[M].2nd ed.Beijing:China Water & Power Press,2013.
[24]黄庆享.公路隧道TZL预应力锚杆支护效果对比试验研究[J].西安公路交通大学学报,2000,20(4):39-42.
HUANG Qingxiang.The contrast bolting test on TZL pretension bolt in highway tunnel[J].Journal of Xi'an Highway University,2000,20(4):39-42.
[25]刘林胜,李 洋,李为腾,等.地铁暗挖车站端锚锚杆预应力功效研究[J].隧道建设(中英文),2021,41(增2):255-260.
LIU Linsheng,LI Yang,LI Weiteng,et al.Prestress effect of end anchor bolt in mined metro station[J].Tunnel Construction,2021,41(S2):255-260.
[26]康红普,姜铁明,高富强.预应力锚杆支护参数的设计[J].煤炭学报,2008,33(7):721-726.
KANG Hongpu,JIANG Tieming,GAO Fuqiang.Design for pretensioned rock bolting parameters[J].Journal of China Coal Society,2008,33(7):721-726.
[27]赵明华,刘峻龙,龙 照.锚杆变形分析与临界锚固长度计算[J].建筑科学与工程学报,2008,25(3):17-21.
ZHAO Minghua,LIU Junlong,LONG Zhao.Deformation analysis of bolt and calculation of critical anchorage length[J].Journal of Architecture and Civil Engineering,2008,25(3):17-21.
[28]张建清,吴继敏,彭 冈,等.基于声波无损检测的特殊锚杆质量影响因素[J].河海大学学报(自然科学版),2009,37(2):179-184.
ZHANG Jianqing,WU Jimin,PENG Gang,et al.Factors in quality of special bolts based on sonic non-destructive detection[J].Journal of Hohai University(Natural Sciences),2009,37(2):179-184.
[29]杨江华,朱国进.声波反射法在锚杆锚固质量检测中的应用[J].云南大学学报(自然科学版),2017,39(增2):302-304.
YANG Jianghua,ZHU Guojin.Application of acoustic reflection method in quality inspection of anchor bolt[J].Journal of Yunnan University(Natural Sciences Edition),2017,39(S2):302-304.