[1] 杨校辉.山区机场高填方地基变形和稳定性分析[D].兰州:兰州理工大学,2017.
YANG Xiaohui.Analysis of foundation deformation and stability of high fill of airport in mountainous area[D].Lanzhou:Lanzhou University of Technology,2017.
[2]ZHU C H,LI N.Ranking of influence factors and control technologies for the post-construction settlement of loess high-filling embankments[J].Computers and Geotechnics,2020,118:103320.
[3]ZHAO Z F,ZHU Y P,YE S H.Study on settlement deformation of high fill foundation in large thickness loess area[J].Arabian Journal of Geosciences,2021,14(12):1173.
[4]朱才辉.深厚黄土地基上机场高填方沉降规律研究[D].西安:西安理工大学,2012.
ZHU Caihui.Settlement regularity study of loess-high filled airport foundation with large thickness[D].Xi'an:Xi'an University of Technology,2012.
[5]苏立海.深厚黄土高填方工后变形机理与沉降规律研究[D].西安:西安理工大学,2016.
SU Lihai.Research of post-construction deformation mechanism and settlement of high loess embankment[D].Xi'an:Xi'an University of Technology,2016.
[6]徐 明,宋二祥.高填方长期工后沉降研究的综述[J].清华大学学报(自然科学版),2009,49(6):786-789.
XU Ming,SONG Erxiang.Review of long-term settling of high fills[J].Journal of Tsinghua University(Science and Technology),2009,49(6):786-789.
[7]刘萌成,黄晓明,陶向华.桥台后高填方路堤工后沉降影响因素分析[J].交通运输工程学报,2005,5(3):36-40,59.
LIU Mengcheng,HUANG Xiaoming,TAO Xianghua.Influence factors on post-construction settlement of high backfills adjacent to abutment[J].Journal of Traffic and Transportation Engineering,2005,5(3):36-40,59.
[8]崔晓如.高填方路基沉降变形分析与预测及其控制标准研究[D].长沙:长沙理工大学,2010.
CUI Xiaoru.Study on settlement of high embankment on analysis and forecast and settlement control standards[D].Changsha:Changsha University of Science & Technology,2010.
[9]郭增玉,张朝鹏,夏旺民.高湿度Q2黄土的非线性流变本构模型及参数[J].岩石力学与工程学报,2000,19(6):780-784.
GUO Zengyu,ZHANG Chaopeng,XIA Wangmin.Nonlinear rheological constitutive models and their parameters of high moisture Q2 loess[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(6):780-784.
[10]朱才辉,李 宁,刘俊平.压实Q3马兰黄土蠕变规律研究[J].西安理工大学学报,2011,27(4):392-399.
ZHU Caihui,LI Ning,LIU Junping.Research on the creep behavior of compacted Q3 Ma-Lan loess[J].Journal of Xi'an University of Technology,2011,27(4):392-399.
[11]葛苗苗,李 宁,郑建国,等.基于蠕变试验的黄土高填方工后沉降规律数值研究[J].西安理工大学学报,2015,31(3):295-300,305.
GE Miaomiao,LI Ning,ZHENG Jianguo,et al.Numerical analysis of the post-construction settlement regularity of loess-high filled embankment based on creep test[J].Journal of Xi'an University of Technology,2015,31(3):295-300,305.
[12]葛苗苗,李 宁,郑建国,等.考虑黄土时效变形特性的高填方工后沉降预测[J].土木工程学报,2015,48(增2):262-267.
GE Miaomiao,LI Ning,ZHENG Jianguo,et al.Prediction of the post-construction settlement of high filled embankment with considering the time depending deformation of compacted loess[J].China Civil Engineering Journal,2015,48(S2):262-267.
[13]YAO Y P,HUANG J,WANG N D.et al.Prediction method of creep settlement considering abrupt factors[J].Transportation Geotechnics,2020,22:100304.
[14]刘 宏,李攀峰,张倬元.九寨黄龙机场高填方地基工后沉降预测[J].岩土工程学报,2005,27(1):90-93.
LIU Hong,LI Panfeng,ZHANG Zhuoyuan.Prediction of the post-construction settlement of the high embankment of Jiuzhai-Huanglong airport[J].Chinese Journal of Geotechnical Engineering,2005,27(1):90-93.
[15]王丽琴,靳宝成,杨有海.黄土路堤工后沉降预测新模型与方法[J].岩石力学与工程学报,2007,26(11):2370-2376.
WANG Liqin,JIN Baocheng,YANG Youhai.New model and method for forecasting post-construction settlement of loess-fill embankments[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2370-2376.
[16]ZHU C H,ZHOU X S,WANG S H.Foundation treatment assessment and postconstruction settlement prediction of a loess high fill embankment:a case study[J].Shock and Vibration,2020,2020:8864690.
[17]INDRARATNA B,BALASUBRAMANIAM A S,SIVANESWARAN N.Analysis of settlement and lateral deformation of soft clay foundation behavior two full-scale embankments[J].International Journal for Numerical and Methods in Geomechanics,1997,21(9):599-618.
[18]李秀珍,许 强,孔纪名,等.九寨黄龙机场高填方地基沉降的数值模拟分析[J].岩石力学与工程学报,2005,24(12):2188-2193.
LI Xiuzhen,XU Qiang,KONG Jiming.et al.Numerical modeling analysis of settlements of high fill foundation for Jiuzhai-Huanglong airport[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2188-2193.
[19]许 强,黄润秋,张倬元,等.四川九寨黄龙机场高填方变形及稳定性的FLAC3D分析[J].成都理工学院学报,2001,28(增1):333-338.
XU Qiang,HUANG Runqiu,ZHANG Zhuoyuan,et al.Study on deformation and stability of high fill at Jiuzhai-Huanglong airport by FLAC3D modeling[J].Journal of Chengdu University of Technology,2001,28(S1):333-338.
[20]周远强,吴 宏,朱才辉,等.黄土高填方工后沉降影响因素敏感性分析[J].西安理工大学学报,2018,34(1):92-98.
ZHOU Yuanqiang,WU Hong,ZHU Caihui,et al.Sensitivity analysis of influence factors of post-construction settlement on loess high fill embankment[J].Journal of Xi'an University of Technology,2018,34(1):92-98.
[21]顾慰慈.堆石坝的沉降和位移计算[J].水利水电技术,1983(1):24-30.
GU Weici.Settlement and displacement calculation of rockfill dam[J].Water Resources and Hydropower Engineering,1983(1):24-30.