Title:
-
Author(s):
LIU Xinzhao12 HUANG Hua123 ZENG Fankui12
(1. School of Civil and Architecture Engineering, Xi’an Technological University, Xi’an 710021, Shaanxi, China;?
2. School of Materials and Chemical Engineering, Xi’an Technological University, Xi’an 710021, Shaanxi, China;
3. Shaanxi Province “Four Subjects and One Union” Large-span Spatial Structure Schoolenterprise Joint Research Center, Xi’an 710021, Shaanxi, China)
Keywords:
super high-rise building jacking steel platform finite element analysis installation construction simulation
PACS:
TU974
DOI:
10.19815/j.jace.2024.10077
Abstract:
To ensure the safety of the key system of the jacking steel platform during its operational phase and the installation and construction process, the finite element analysis of its key system was conducted and the structural integrity safety under three operational phases including jacking, construction, and lifting was verified. Based on the analysis results, an efficient installation and construction scheme was designed. Key components were hoisted and verified using finite element software, and the specifications of the steel wire ropes used during hoisting were determined according to actual needs. A simulation analysis of the installation and construction of the key system of the jacking steel platform was also carried out. The results show that the stress and vertical displacement of the key system of the jacking steel platform are the largest during the construction phase, and the maximum values are within the limits of the steel structure design standards. Linear buckling analysis shows that the steel platform will become unstable only under five times the design load, and the overall strength, stiffness, and stability of the structure meet the requirements. The stress and vertical displacement of each component of the key system of the jacking steel platform during hoisting operations are in compliance with the requirements of the steel structure design standards. The stress and vertical displacement of the structure gradually increase during the installation of the steel truss, but the maximum stress and vertical displacement values are far less than the requirements of the steel structure design standards, indicating that this installation and construction scheme has a high level of safety. The analysis results can provide a theoretical basis for the formulation of the installation and construction scheme.

References:

1]艾心荧,余地华,叶建,.天津高银117大厦新型抗侧移模块化低位顶升钢平台模架体系安装施工关键技术[J].钢结构(中英文),2022,37(2):46-52.

AI Xinying, YU Dihua, YE Jian, et al. Keyinstallation technology of new sidesway-resisting modularized low-positionjacking steel platform scaffold system in Tianjin Goldin 117 building[J]. SteelConstruction (Chinese & English), 2022, 37(2): 46-52.

2]仲继寿,陈义红,汪鼎华,.现浇钢筋混凝土高层建筑工业化建造研究与工程示范[J].建筑科学,2022,38(3):139-145.

ZHONG Jishou, CHEN Yihong, WANG Dinghua, etal. Industrial construction research and engineering demonstration of cast-in-placereinforced concrete high-rise buildings[J]. Building Science, 2022, 38(3):139-145.

3]韩亚新,单宏伟,李东,.东莞国贸中心T2塔楼智能顶升钢平台施工技术[J].施工技术,2019,48(9):71-75.

HAN Yaxin, SHAN Hongwei, LI Dong, et al.Construction technology of intelligent jacking-up steel platform of Dongguanworld trade center T2 tower[J]. Construction Technology, 2019, 48(9): 71-75.

4]张彤炜,周书东,麦镇东,.超高层建筑顶升模架施工关键技术[J].施工技术,2019,48():57-61.

ZHANG Tongwei, ZHOU Shudong, MAI Zhendong,et al. Key technologies for jacking scaffolding construction in super high-risebuildings[J]. Construction Technology, 2019, 48(S): 57-61.

5]赵军,葛皖峰,黄亚均,.超高层建筑低位顶升模架拆除技术[J].工程质量,2018,36(1):27-32.

ZHAO Jun, GE Wanfeng, HUANG Yajun, et al.Demolition technology of the low jack-up formwork system for the constructionof super high-rise architecture[J]. Construction Quality, 2018, 36(1): 27-32.

6]徐建彬,黄亚均,何胡,.超高层建筑低位顶升模架拆除技术[J].江苏建筑,2016(1):64-67.

XU Jianbin, HUANG Yajun, HE Hu, et al.Demolishing technology of low Jack-up formwork in the super high-rise building[J].Jiangsu Construction, 2016(S1): 64-67.

7]陈宇,王仪斌,赵哲阳,.高空复杂顶升模架系统拆除技术[C]//白云.第二届全国智慧结构学术会议论文集.绵阳:《工业建筑》杂志社,2016:252-255.

CHEN Yu, WANG Yibin, ZHAO Zheyang, et al.Demolition technology of complex high-altitude jacking scaffolding system[C]//BAIYun. Proceedings of the Second National Conference on Smart Structures.Mianyang: Industrial Construction Magazine, 2016: 252-255.

8]刘一衡.整体钢平台顶升模架体系的施工预警方法研究[D].西安:西安建筑科技大学,2023.

LIU Yiheng. Research on construction earlywarning method of integral steel platform jacking moulding system[D]. Xi’an: Xi’anUniversity of Architecture and Technology, 2023.

9]胡长明,刘一衡,黄华,.AHP-改进物元法在整体钢平台顶升模架体系安全风险评估中的应用[J].安全与环境学报,2024,24(1):33-41.

HU Changming, LIU Yiheng, HUANG Hua, et al.Application of AHP-improved matter-element method in safety risk assessment ofintegral steel platform jacking formwork system[J]. Journal of Safety andEnvironment, 2024, 24(1): 33-41.

10]胡长明,刘一衡,黄华,.风险因素耦合作用下的整体钢平台施工预警方法研究[J].中国安全生产科学技术,2023,19(9):103-109.

HU Changming, LIU Yiheng, HUANG Hua, et al.Research on early warning method for construction of integrated steel platformunder coupling effect of risk factors[J]. Journal of Safety Science andTechnology, 2023, 19(9): 103-109.

11]王凝,曾凡奎,高宇甲,等.超高层建筑顶升模架系统的优化设计及智能建造[J].建筑科学与工程学报,2023,40(2):69-76.

WANG Ning, ZENG Fankui, GAO Yujia, et al.Optimal design and intelligent construction of jacking formwork system forsuper high-rise buildings[J]. Journal of Architecture and Civil Engineering,2023, 40(2): 69-76.

12]汤杰.超高层建筑顶升模架钢平台受力性能研究[D].西安:西安工业大学,2018.

TANG Jie. Study on the mechanicsperformance of the jack-up formwork steel platform of the super high-risebuilding[D]. Xi’an: Xi’an Technological University, 2018.

13]滕柳.超高层建筑顶升钢平台模架系统的研究与设计[D].西安:西安工业大学,2022.

TENG Liu. Research and design of jackingsteel platform moulding system for super high-rise[D]. Xi’an: Xi’anTechnological University, 2022.

14]辛宛蓉.某超高层建筑顶升钢平台力学特性分析及优化设计[D].西安:西安建筑科技大学,2022.

XIN Wanrong. Analysis of the mechanicalcharacteristics and optimal design of a jacking steel platform for a super high-risebuilding[D]. Xi’an: Xi’an University of Architecture and Technology, 2022.

15]王巩凡.超高层建筑顶升模架关键系统的研究与设计[D].西安:西安工业大学,2021.

WANG Gongfan. The key to jacking form-workof super high-rise building system research and design[D]. Xi’an: Xi’anTechnological University, 2021.

16]白雪,马海彬,姚传勤,.超高层建筑顶升模板体系设计及模态分析[J].工业建筑,2013,43(5):14-17,51.

BAI Xue, MA Haibin,YAO Chuanqin, et al.Design and modal analysis of jacking form system for super high-rise building[J].Industrial Construction, 2013, 43(5): 14-17, 51.

17]赵世豪.落地式液压顶升模架系统设计研究[D].西安:西安建筑科技大学,2023.

ZHAO Shihao. Design and research of aground-based hydraulic jacking formwork system[D]. Xi’an: Xi’an University ofArchitecture and Technology, 2023.

18]黄华.附墙式钢平台施工阶段剪力墙时变可靠性研究[D].西安:西安建筑科技大学,2023.

HUANG Hua. Study on the time-varyingreliability of shear walls during the construction phase of wall-attached steelplatform[D]. Xi’an: Xi’an University of Architecture and Technology, 2023.

19]白豪.装配式钢桁架集成施工平台抗震性能分析[D].西安:长安大学,2022.

BAI Hao. Seismic performance analysis offabricated steel truss integrated construction platform[D]. Xi’an: Chang’anUniversity, 2022.

20]朱毅敏,徐磊,陈逯浩,.整体钢平台结构体系安全性能研究[J].结构工程师,2022,38(3):155-163.

ZHU Yimin, XU Lei, CHEN Luhao, et al.Research on safety of integral steel platform structure system[J]. StructuralEngineers, 2022, 38(3): 155-163.

21]刘新钊,曾凡奎,张健华.超高层建筑智能建造机关键系统设计及仿真分析[J].西安工业大学学报,2023,43(1):23-31,40.

LIU Xinzhao, ZENG Fankui, ZHANG Jianhua.Design and simulation analysis of key system of intelligent constructionmachines for a super high-rise building[J]. Journal of Xi’an TechnologicalUniversity, 2023, 43(1): 23-31, 40.

22]刘新钊.超高层建筑智能建造机关键系统的分析与施工技术研究[D].西安:西安工业大学,2023.

LIU Xinzhao. Analysis and constructiontechnology research of key systems of intelligent construction machine forsuper high-rise buildings[D]. Xi’an: Xi’an Technological University, 2023.

23]建筑结构可靠性设计统一标准:GB500682018[S].北京:中国建筑工业出版社,2018.

Unified standard for reliability design ofbuilding structures: GB 500682018[S]. Beijing: ChinaArchitecture & Building Press, 2018.

24]整体爬升钢平台模架技术标准:JGJ4592019[S].北京:中国建筑工业出版社,2018.

Technical standard for self-climbingintegrated scaffolding and formwork equipment with steel platform: JGJ 4592019[S]. Beijing: China Architecture & Building Press, 2018.

25]钢结构设计标准:GB500172017[S].北京:中国建筑工业出版社,2017.

Standard for design of steel structures: GB500172017[S]. Beijing: China Architecture &Building Press, 2017.

26]包妍.某项目大跨度钢结构施工过程模拟及监测[D].青岛:青岛理工大学,2015.

BAO Yan. Simulation and monitoring of largespan steel structure construction[D].Qingdao:Qingdao University of Technology,2015.

27]王秀丽,陶志山,赵海燕.整体顶升钢屋盖网壳结构卸载过程模拟分析[J].建筑科学与工程学报,2020,37(1):49-57.

WANG Xiuli, TAO Zhishan, ZHAO Haiyan.Simulation analysis of unloading process of integral jacking steel roofreticulated shell structure[J]. Journal of Architecture and Civil Engineering,2020, 37(1): 49-57.

28]赵妍.植物馆大跨空间钢结构安装技术分析[D].青岛:青岛理工大学,2015.

ZHAO Yan. The botany stadium analysis oflong-span space steel structure[D]. Qingdao: Qingdao University of Technology,2015.

29]建筑施工起重吊装工程安全技术规范:JGJ 2762012[S].北京:中国建筑工业出版社,2012.

Technical code for safety of lifting inconstruction: JGJ 2762012[S]. Beijing: ChinaArchitecture & Building Press, 2012.

30]重要用途钢丝绳:GB/T89182006[S].北京:中国标准出版社,2006.

Steel wire ropes for important purposes:GB/T 89182006[S]. Beijing: Standards Press of China,2006.

31]罗清泉.大跨度钢结构分段吊装施工过程模拟分析[D].武汉:武汉理工大学,2015.

LUO Qingquan. Simulation and analysis ofconstruction process of lifting segment by segment for long-span steelstructure[D]. Wuhan: Wuhan University of Technology, 2015.