[1] 李 惠,鲍跃全,李顺龙,等.结构健康监测数据科学与工程[J].工程力学,2015,32(8):1-7.
LI Hui,BAO Yuequan,LI Shunlong,et al.Data science and engineering for structural[J].Engineering Mechanics,2015,32(8):1-7.
[2]李宏男,李东升.土木工程结构安全性评估、健康监测及诊断述评[J].地震工程与工程振动,2002,22(3):82-90.
LI Hongnan,LI Dongsheng.Safety assessment,health monitoring and damage diagnosis for structures in civil engineering[J].Earthquake Engineering and Engineering Vibration,2002,22(3):82-90.
[3]李 惠,周 峰,朱焰煌,等.国家游泳中心钢结构施工卸载过程及运营期间应变健康监测及计算模拟分析[J].土木工程学报,2012,45(3):1-9.
LI Hui,ZHOU Feng,ZHU Yanhuang,et al.An analysis of monitored and computed strain of the National Aquatics Center in the states of unloading and daily use[J].China Civil Engineering Journal,2012,45(3):1-9.
[4]罗尧治,梅宇佳,沈雁彬,等.国家体育场钢结构温度与应力实测及分析[J].建筑结构学报,2013,34(11):24-32.
LUO Yaozhi,MEI Yujia,SHEN Yanbin,et al.Field measurement of temperature and stress on steel structure of the National Stadium and analysis of temperature action[J].Journal of Building Structures,2013,34(11):24-32.
[5]罗永峰,叶智武,陈晓明,等.空间钢结构施工过程监测关键参数及测点布置研究[J].建筑结构学报,2014,35(11):108-115.
LUO Yongfeng,YE Zhiwu,CHEN Xiaoming,et al.Research on key parameter selection and monitoring point arrangement in construction monitoring of spatial steel structures[J].Journal of Building Structures,2014,35(11):108-115.
[6]XIA Y,ZHANG P,NI Y Q,et al.Deformation monitoring of a super-tall structure using real-time strain data[J].Engineering Structures,2014,67:29-38.
[7]宋 彪,李宏男,任 亮,等.某钢结构梁高温切割全过程的监测与分析[J].工程力学,2016,33(9):69-75.
SONG Biao,LI Hongnan,REN Liang,et al.Structural health monitoring and analyzing for the whole high temperature cutting process of a steel structure beam[J].Engineering Mechanics,2016,33(9):69-75.
[8]孙若晗,任伟新,阳 霞,等.多室混凝土箱梁二维温度梯度研究[J].合肥工业大学学报(自然科学版),2016,39(12):1680-1687.
SUN Ruohan,REN Weixin,YANG Xia,et al.Study of two-dimensional temperature gradient of multi-room concrete box girder[J].Journal of Hefei University of Technology(Natural Science),2016,39(12):1680-1687.
[9]CATBAS F N,CELIK O,AVCI O,et al.Sensing and monitoring for stadium structures:a review of recent advances and a forward look[J].Frontiers in Built Environment,2017,3:1-18.
[10]LI S L,HE S Y,LI H,et al.Scour depth determination of bridge piers based on time-varying modal parameters:application to Hangzhou bay bridge[J].Journal of Bridge Engineering,2017,22(12):04017107.
[11]SHAHSAVARI V,MEHRKASH M,SANTINI-BELL E.Damage detection and decreased load-carrying capacity assessment of a vertical-lift steel truss bridge[J].Journal of Performance of Constructed Facilities,2020,34(2):04019123.
[12]常 乐,黄 翔,赵有山,等.跨度120 m三角锥体钢结构施工滑移监测方法研究[J].建筑结构学报,2022,43(9):251-259.
CHANG Le,HUANG Xiang,ZHAO Youshan,et al.Research on construction slip monitoring method of spatial steel structure with triangular cone shape spanning 120 meters[J].Journal of Building Structures,2022,43(9):251-259.
[13]ZHAO Y,WANG J F,PANG M.Integral lifting project of the qifeng bridge[J].Journal of Performance of Constructed Facilities,2012,26(3):353-361.
[14]STITH J C,HELWIG T A,WILLIAMSON E B,et al.Comparisons of the computed and measured behavior of curved steel I-girders during lifting[J].Journal of Structural Engineering,2012,138(1):1-10.
[15]YIN T,ZHANG W,ZHAO Y B,et al.Construction monitoring technology research on large-span V structure tied arch bridge[J].Applied Mechanics and Materials,2013,351-352:1240-1243.
[16]HOLDEN K M,PANTELIDES C P,RIES J M,et al.Lifting of GFRP precast concrete bridge deck panels[J].Journal of Performance of Constructed Facilities,2015,29(3):04014075.
[17]DENG H,LI H Y,SU C,et al.Monitoring and analyzing displacement of large-span spoke-type cable structure roof[J].Journal of Surveying Engineering,2017,143(4):06017001.
[18]MURPHY B,LOCUM J,BELSER M,et al.Dead load evaluation through truss bridge deconstruction monitoring[J].Journal of Bridge Engineering,2018,23(1):04017115.
[19]韩林海.钢管混凝土结构——理论与实践[M].3版.北京:科学出版社,2016.
HAN Linhai.Concrete filled steel tubular structures — theory and practice[M].3rd ed.Beijing:Science Press,2016.
[20]李 威.圆钢管混凝土柱-钢梁外环板式框架节点抗震性能研究[D].北京:清华大学,2011.
LI Wei.Study on the seismic performance of circular concrete-filled steel tubular column to steel beam joint with external diaphragm[D].Beijing:Tsinghua University,2011.
[21]沈聚敏,王传志,江见鲸.钢筋混凝土有限元与板壳极限分析[M].北京:清华大学出版社,1993.
SHEN Jumin,WANG Chuanzhi,JIANG Jianjing.Finite element analysis of reinforced concrete and limit analysis of plate and shell[M].Beijing:Tsinghua University Press,1993.
[22]混凝土结构设计规范:GB 50010—2010[S].北京:中国建筑工业出版社,2011.
Code for design of concrete structures:GB 50010—2010[S].Beijing:China Architecture & Building Press,2011.