[1] 肖建庄.可持续混凝土结构导论[M].北京:科学出版社,2017.
XIAO Jianzhuang.An introduction to sustainable concrete structures[M].Beijing:Science Press,2017.
[2]中国建筑节能协会.中国建筑能耗研究报告2020[J].建筑节能(中英文),2021,49(2):1-6.
China Association of Building Energy Efficiency.China building energy consumption annual report 2020[J].Building Energy Efficiency,2021,49(2):1-6.
[3]SHIGERU YOSHIKAI.Cut and take down demolition method[J].Steel Construction Today & Tomorrow,2015(44):9.
[4]周 镭,李延和,任亚平.框架结构顶升纠偏理论及实例分析[J].建筑结构,2018,48(增1):594-598.
ZHOU Lei,LI Yanhe,REN Yaping.Theoretical design for the frame structure jacking rectification[J].Building Structure,2018,48(S1):594-598.
[5]成 勃,姜丽萍,宋 杰.剪力墙顶升技术在房屋纠倾中的应用[J].建筑结构,2020,50(9):137-140.
CHENG Bo,JIANG Liping,SONG Jie.Application of shear wall jacking technology in house inclination rectification[J].Building Structure,2020,50(9):137-140.
[6]苏 骏,周建龙,周 健,等.上海黄浦路106号历史保护建筑改造项目托换顶升隔震设计[J].建筑结构,2022,52(9):139-146.
SU Jun,ZHOU Jianlong,ZHOU Jian,et al.Underpinning lifting and isolation design of historical protection building reconstruction project at No.106 Huangpu road in Shanghai[J].Building Structure,2022,52(9):139-146.
[7]龚 剑,周 虹.上海中心大厦结构工程建造关键技术[J].建筑施工,2014,36(2):91-101.
GONG Jian,ZHOU Hong.Key technology for structure construction of Shanghai tower[J].Building Construction,2014,36(2):91-101.
[8]刘 溢,李镜培,陈 伟.超大基坑框架逆作法关键施工技术[J].岩土工程学报,2013,35(增1):489-494.
LIU Yi,LI Jingpei,CHEN Wei.Key construction techniques for oversized excavation pits using top-down method[J].Chinese Journal of Geotechnical Engineering,2013,35(S1):489-494.
[9]谢小林,翟杰群,张 羽,等.“上海中心”裙房深大基坑逆作开挖设计及实践[J].岩土工程学报,2012,34(增1):744-749.
XIE Xiaolin,ZHAI Jiequn,ZHANG Yu,et al.Design and practice of top-down method for large-scale podium basement excavation of Shanghai tower[J].Chinese Journal of Geotechnical Engineering,2012,34(S1):744-749.
[10]HARALD L.Method of building multi-storied houses:GB1857846[P].1948-11-25.
[11]VANDERKLAAUW P M.Apparatus for forming and lifting multi-story columns in one story increments:US3692446[P].1972-09-19.
[12]邓庚厚.一种由上往下建造建筑物的顶升式建筑法:CN96119160.0[P].1997-07-23.
DENG Genghou.A jack-up construction method for building from top to bottom:CN96119160.0[P].1997-07-23.
[13]于 君.多层建筑的施工方法及其专用的起重设备:CN01139073.5[P].2003-06-11.
YU Jun.Construction method of multi-storey building and its special lifting equipment:CN01139073.5[P].2003-06-11.
[14]袁 斌.钢筋混凝土建筑物的主体工程施工方法:CN200910116509.1[P].2009-09-23.
YUAN Bin.Construction method for main project of reinforced concrete building:CN200910116509.1[P].2009-09-23.
[15]杨 春,滕淑红,罗 洪.整体式顶升施工法:CN201810146517.X[P].2019-11-01.
YANG Chun,TENG Shuhong,LUO Hong.Integral-type jacking construction method:CN201810146517.X[P].2019-11-01.
[16]黄文龙,钱 密,吴云雨,等.顶升式拼装建筑施工方法:CN201910064902.4[P].2020-10-20.
HUANG Wenlong,QIAN Mi,WU Yunyu,et al.Jacking type splicing building construction method:CN201910064902.4[P].2020-10-20.
[17]高继良.一种与装配式建筑物顶升施工方法相匹配的分层流水结构安装方法:CN201910534062.3[P].2020-12-22.
GAO Jiliang.Layered flow structure installation method matched with assembled building jacking construction method:CN201910534062.3[P].2020-12-22.
[18]吴柯娴,王竹君,金伟良,等.装配式混凝土结构可持续成本量化分析[J].建筑结构学报,2021,42(5):133-144.
WU Kexian,WANG Zhujun,JIN Weiliang,et al.Quantitative analysis of sustainable cost of prefabricated concrete structures[J].Journal of Building Structures,2021,42(5):133-144.
[19]郝际平,孙晓岭,薛 强,等.绿色装配式钢结构建筑体系研究与应用[J].工程力学,2017,34(1):1-13.
HAO Jiping,SUN Xiaoling,XUE Qiang,et al.Research and applications of prefabricated steel structure building systems[J].Engineering Mechanics,2017,34(1):1-13.
[20]王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108.
WANG Guangyuan.On mechanics of time-varying structures[J].China Civil Engineering Journal,2000,33(6):105-108.
[21]建筑结构荷载规范:GB 50009—2012[S].北京:中国建筑工业出版社,2012.
Load code for the design of building structures:GB 50009—2012[S].Beijing:China Architecture & Building Press,2012.
[22]余安东.升板结构设计原理[M].上海:上海科学技术出版社,1980.
YU Andong.Design principle of riser structure[M].Shanghai:Shanghai Scientific & Technical Publishers,1980.
[23]周凌远,李 乔.基于UL法的CR列式三维梁单元计算方法[J].西南交通大学学报,2006,41(6):690-695.
ZHOU Lingyuan,LI Qiao.Updated Lagrangian co-rotational formulation for geometrically nonlinear FE analysis of 3-D beam element[J].Journal of Southwest Jiaotong University,2006,41(6):690-695.
[24]李尚飞,付素娟,赵士永,等.某多层建筑顶升纠倾加固技术[J].施工技术,2019,48(15):29-32,36.
LI Shangfei,FU Sujuan,ZHAO Shiyong,et al.The jacking-up inclination rectification and reinforcement technology of the multi-storey building[J].Construction Technology,2019,48(15):29-32,36.
[25]TINGLEY D D,DAVISON B.Design for deconstruction and material reuse[J].Proceedings of the Institution of Civil Engineers — Energy,2011,164(4):195-204.
[26]DENSLEY TINGLEY D,DAVISON B.Developing an LCA methodology to account for the environmental benefits of design for deconstruction[J].Building and Environment,2012,57:387-395.
[27]李世歌,杨 浩,陈柏林,等.一种安全可重复使用的新型钢筋混凝土框架结构及连接方法:CN202110252769.2[P].2021-09-14.
LI Shige,YANG Hao,CHEN Bailin,et al.Safe and reusable novel reinforced concrete frame structure and connecting method:CN202110252769.2[P].2021-09-14.
[28]CHU B,JUNG K,LIM M T,et al.Robot-based construction automation:an application to steel beam assembly(Part I)[J].Automation in Construction,2013,32:46-61.
[29]SCHWARTZ M.Use of a low-cost humanoid for tiling as a study in on-site fabrication[C]//VELIKOV K,MANNINGER S,DEL CAMPO M,et al.Proceedings of the 36th Annual Conference of the Association for Computer Aided Design in Architecture — Posthuman Frontiers:Data,Designers and Cognitive Machines.Ann Arbor:ACADIA,2016:214-223.
[30]杨学林,祝文畏,王擎忠,等.建筑顶升控制侧向位移的套架式限位机构及限位方法:CN201710405663.5[P].2019-01-08.
YANG Xuelin,ZHU Wenwei,WANG Qingzhong,et al.Slide way type lateral limiting device for building jacking:CN201710405663.5[P].2019-01-08.
[31]邓元存.一种用于建筑物顶升的滑道式侧向限位装置:CN201711224271.5[P].2020-04-17.
DENG Yuancun.A slideway type lateral limiting device for building jacking:CN201711224271.5[P].2020-04-17.
[32]宋立柱,王 冠,张宝永.建筑物顶升用滑道式侧向限位装置:CN202011290676.0[P].2021-02-26.
SONG Lizhu,WANG Guan,ZHANG Baoyong.Slideway type lateral limiting device for building jacking:CN202011290676.0[P].2021-02-26.
[33]LI F Y,WU P F,YAN X F.Analysis and monitoring on jacking construction of continuous box girder bridge[J].Computers and Concrete,2015,16(1):49-65.
[34]夏风敏,王 恒,贾留东,等.鲁能文昌山海天精品酒店拖车移位设计与监测[J].建筑结构学报,2021,42(10):197-206.
XIA Fengmin,WANG Heng,JIA Liudong,et al.Design and monitoring for moving of Luneng Shanhaitian Boutique Hotel in Wenchang[J].Journal of Building Structures,2021,42(10):197-206.
[35]HE J A,GAO X Z.Research of synchronous jacking up construction monitoring and control technologies of bridge[C]//ICACHE.Proceedings of the 2nd International Conference on Architectural,Civil and Hydraulics Engineering(ICACHE 2016).Paris:Atlantis Press,2016:39-44.
[36]胡吉松,邓金成.深圳某七层楼房基础加固及断柱纠偏的设计与实践[J].建筑结构,2007,37(增1):459-463.
HU Jisong,DENG Jincheng.Design on strengthening foundation and rectifying a deviation by cutting off column on a seven-floor frame structure in Shenzhen[J].Building Structure,2007,37(S1):459-463.
[37]王 海.可拆卸式预应力托换节点在桥梁顶升工程中的应用[J].施工技术,2018,47(5):40-43.
WANG Hai.Application of detachable prestressed underpinning joint in bridge jacking project[J].Construction Technology,2018,47(5):40-43.
[38]WU E J,DONG N,YUAN K J.Experimental study on column underpinning joints with inclined steel bars[J].Proceedings of the Institution of Civil Engin-eers — Structures and Buildings,2017,170(10):751-764.
[39]DU A H,TANG H Q.Research on bearing capacity of column underpinning joint of frame structure moving[J].Advanced Materials Research,2011,243-249:426-430.
[40]陈 茜,张 强,梁存之,等.带自动旋转螺母锁定机构的双作用液压千斤顶:CN202020478725.2[P].2021-01-05.
CHEN Qian,ZHANG Qiang,LIANG Cunzhi,et al.Double-acting hydraulic jack with automatic rotating nut locking mechanism:CN202020478725.2[P].2021-01-05.
[41]窦伯红.一种带自动旋转螺母锁定机构的双作用液压千斤顶:CN202120898536.5[P].2021-12-21.
DOU Bohong.Double-acting hydraulic jack with automatic rotating nut locking mechanism:CN2021208985 36.5[P].2021-12-21.
[42]刘占省,吴震东.基于数字孪生的装配式建筑构件安装智能化管理模型研究[J].施工技术(中英文),2022,51(11):54-60.
LIU Zhansheng,WU Zhendong.Research on intelligent management model of prefabricated building component installation based on digital twin[J].Construction Technology,2022,51(11):54-60.
[43]刘占省,刘子圣,孙佳佳,等.基于数字孪生的智能建造方法及模型试验[J].建筑结构学报,2021,42(6):26-36.
LIU Zhansheng,LIU Zisheng,SUN Jiajia,et al.Intelligent construction methods and model experiments based on digital twins[J].Journal of Building Structures,2021,42(6):26-36.
[44]马艾田.基于云计算的有限元分析仿真系统研究与实现[D].北京:北京工业大学,2013.
MA Aitian.The research and implementation of finite element analysis simulation system[D].Beijing:Beijing University of Technology,2013.
[45]王水玲.基于IoT的装配式建筑智能建造系统构建研究[D].广州:广州大学,2021.
WANG Shuiling.IoT-based intelligent construction system for prefabricated buildings[D].Guangzhou:Guangzhou University,2021.
[46]LIU Z S,SHI G L,ZHANG A S,et al.Intelligent tensioning method for prestressed cables based on digital twins and artificial intelligence[J].Sensors,2020,20(24):7006.
[47]曾 亮,肖建庄,陈立浩,等.建筑旋转平移的基本方法探究[J].建筑科学与工程学报,2021,38(4):57-64.
ZENG Liang,XIAO Jianzhuang,CHEN Lihao,et al.Research on basic methods of building rotation and moving technology[J].Journal of Architecture and Civil Engineering,2021,38(4):57-64.
[48]肖旭东.绿色建筑生命周期碳排放及生命周期成本研究[D].北京:北京交通大学,2021.
XIAO Xudong.Study on life cycle carbon emission and life cycle cost of green buildings[D].Beijing:Beijing Jiaotong University,2021.
[49]IPCC Working Group.Climate change 1995:IPCC second assessment report[R].Geneva:IPCC,1995.
[50]TENG Y,PAN W.Systematic embodied carbon assessment and reduction of prefabricated high-rise public residential buildings in Hong Kong[J].Journal of Cleaner Production,2019,238:117791.
[51]MAO C,SHEN Q P,SHEN L Y,et al.Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods:two case studies of residential projects[J].Energy and Buildings,2013,66:165-176.
[52]Environmental management — life cycle assessment principles and framework:ISO 14040[S].Geneva:International Organization for Standardization,2006.
[53]马素贞,孙大明,邵文晞.绿色建筑技术增量成本分析[J].建筑科学,2010,26(6):91-94,100.
MA Suzhen,SUN Daming,SHAO Wenxi.Incremental cost analysis for green building technology[J].Building Science,2010,26(6):91-94,100.
[54]刘明达,蒙吉军,刘碧寒.国内外碳排放核算方法研究进展[J].热带地理,2014,34(2):248-258.
LIU Mingda,MENG Jijun,LIU Bihan.Progress in the studies of carbon emission estimation[J].Tropical Geography,2014,34(2):248-258.
[55]HOUGHTON J T,MEIRA FILHO L G,LIM B,et al.Revised 1996 IPCC guidelines for National Greenhouse Gas Inventories[R].Exeter:UK Meteorological Office,1997.
[56]谭泽先.钢筋混凝土结构含钢量的一般范围和合理控制方法[J].建筑结构,2007,37(7):17-19.
TAN Zexian.General scope and control method of steel content of building structure[J].Building Structure,2007,37(7):17-19.