[1] 莫斯克文B M.混凝土和钢筋混凝土的腐蚀及其防护方法[M].倪继淼,译.北京:化学工业出版社,1988.
MOSIKEWEN B M.The Corrosion and Defending Methods About Concrete and Reinforced Concrete[M].Translated by NI Ji-miao.Beijing:Chemical Industry Press,1988.
[2]屈文俊,张 誉,车惠民.既有混凝土结构的碳化预测[J].建筑结构,1999,36(4):31-34.
QU Wen-jun,ZHANG Yu,CHE Hui-min.Carbonization Predicting on Existing Concrete Structures[J].Building Structure,1999,36(4):31-34.
[3]屈文俊,张 誉.构件截面混凝土碳化深度分布的有限元分析[J].同济大学学报:自然科学版,1999,27(4):412-416.
QU Wen-jun,ZHANG Yu.Finite Element Analysis About Concrete Carbonization Depth at the Section[J].Journal of Tongji University:Natural Science,1999,27(4):412-416.
[4]屈文俊,白文静.风压加速混凝土碳化计算模型[J].同济大学学报:自然科学版,2003,31(11):1 280-1 284.
QU Wen-jun,BAI Wen-jing.Calculating Model of Concrete Carbonization Accelerated by Wind Pressure[J].Journal of Tongji University:Natural Science,2003,31(11):1 280-1 284.
[5]郭 猛.风加速混凝土碳化的试验研究[D].上海:同济大学,2005.
GUO Meng.The Experimental Study on Carbonization of Concrete Accelerated by Wind[D].Shanghai:Tongji University,2005.
[6]陈道普.风对混凝土碳化速度影响的研究[D].上海:同济大学,2006.
CHEN Dao-pu.The Study on the Influence on Carbonization Speed of Concrete by Wind[D].Shanghai:Tongji University,2006.