Sensitivity Parameters Analysis of PC Oblique-pulling Truss Bridge(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2007年01期
Page:
59-63
Research Field:
Publishing date:
2007-03-20

Info

Title:
Sensitivity Parameters Analysis of PC Oblique-pulling Truss Bridge
Author(s):
HUANG Ping-ming WANG Da ZHANG Yong-jian
Key Laboratory for Bridge and Tunnel of Shaanxi Province, Chang'an University, Xi'an 710064, Shaanxi, China
Keywords:
bridge engineering finite element sensitivity parameter shrinkage and creep nonlinearity static characteristic
PACS:
TU448.224
DOI:
-
Abstract:
In order to accurately grasp variation situations of inner force and deflection for PC cable-stayed bridge during construction and running stage and study the mechanical characteristics of this type bridge, a PC oblique-pulling truss bridge was taken as the studying case. A three-dimensionalspace finite element model was built with the large-scale finite element calculation program. The related researches were carried on the structure by computer simulation analysis method. The influence rules and levels of the bridge static characteristics were obtained, which were affected by the sensitivity parameters, such as shrinkage and creep of concrete, changing of the temperature, nonlinearity and so on. The results indicate that shrinkage and creep of concrete, nonlinear and rigidity deviation have a less affection on inner force of bridge, while they have a greater affection on deflection of structure, and changes of deflection value linearity decrease from middle span to two side spans. But temperature and self-weights deviation have a smaller affection on deflection and inner force than the other sensitivity parameters and changes of deflection of them are taken as parabolic distribution from middle span to two side spans, while changes of inner force don't have much variation on the whole bridge.

References:

[1] 刘 扬,张建仁.斜拉桥施工期时变可靠度的参数敏感性分析[J].长沙交通学院学报,2004,20(4):45-49. LIU Yang,ZHANG Jian-ren.Parameters Sensitivity Analysis for Time-dependent Reliability of Cable-stayed Bridges During Construction[J].Journal of Changsha Communications University,2004,20(4):45-49.
[2]项贻强,姚永丁,胡峰强.体外索加固T型刚构桥的静动力性能研究[J].中国公路学报,2004,17(1):39-44. XIANG Yi-qiang,YAO Yong-ding,HU Feng-qiang.Study of Static and Dynamic Behavior of T-shape Rigid Frame Bridge Reinforced by Prestressed External Tendon[J].China Journal of Highway and Transport,2004,17(1):39-44.
[3]郭 健.混凝土斜拉桥主梁的非稳态温度场与应力场分析[J].中国公路学报,2005,18(2):65-68. GUO Jian.Analysis of Unsteady Temperature Gradient and Thermal Stress Field for Concrete Girder of Cable-stayed Bridge[J].China Journal of Highway and Transport,2005,18(2):65-68.
[4]李忠献,黄 健,丁 阳,等.不同地震激励下大跨度斜拉桥的地震反应分析[J].中国公路学报,2005,18(3):48-53. LI Zhong-xian,HUANG Jian,DING Yang,et al.Seismic Responses of Long-span Cable-stayed Bridges Under Different Patterns of Earthquake Excitations[J].China Journal of Highway and Transport,2005,18(3):48-53.
[5]刘小燕,颜东煌,张 峰,等.预应力高强混凝土梁极限承载力分析[J].中国公路学报,2006,19(1):58-61. LIU Xiao-yan,YAN Dong-huang,ZHANG Feng,et al.Ultimate Load Analysis of Prestressed High-strength Concrete Beam[J].China Journal of Highway and Transport,2006,19(1):58-61.
[6]颜东煌,陈常松,涂光亚.混凝土斜拉桥施工控制温度影响及其现场修正[J].中国公路学报,2006,19(4):71-76. YAN Dong-huang,CHEN Chang-song,TU Guang-ya.Temperature Influence and Its Field Correction During Construction Control of Concrete Cable-stayed Bridge[J].China Journal of Highway and Transport,2006,19(4):71-76.
[7]颜东煌.斜拉桥合理设计状态确定与施工控制[D].长沙:湖南大学,2001. YAN Dong-huang.Determining of Reasonable Design States and Construction Controlling of Cable-stayed Bridges[D].Changsha:Hunan University,2001.
[8]樊可清,倪一清,高赞明.大跨度桥梁模态频率识别中的温度影响研究[J].中国公路学报,2006,19(2):67-73. FAN Ke-qing,NI Yi-qing,GAO Zan-ming.Research on Temperature Influences in Long-span Bridge Eigenfrequencies Identification[J].China Journal of Highway and Transport,2006,19(2):67-73.
[9]陈太聪,韩大建.大跨度斜拉桥施工过程中的主梁节段自重识别[J].土木工程学报,2005,38(2):68-74. CHEN Tai-cong,HAN Da-jian.Identification of Self-weights Girders During the Construction Process of a Long Span Cable-stayed Bridge[J].China Civil Engineering Journal,2005,38(2):68-74.