[1] CIDECT,Design Guide for Rectangular Hollow Section(RHS)Joints Under Predominantly Static Loading[S].
[2]BSP,Design of SHS Welded Joints[S].
[3]AISC,Load and Resistance Factor Design Specification for Steel Hollow Structural Sections[S].
[4]WARDENIER J.Hollow Sections in Structural Applications[M].New York:John Wiley & Sons,2002.
[5]GB 50017-2003,钢结构设计规范[S].GB 50017-2003,Code for Design of Steel Structures[S].
[6]帕克 J A,亨德森 J E.空心管结构连接设计指南[M].曹俊杰,译.北京:科学出版社,1997.PACKER J A,HENDERSON J E.Design Guide for Steel Hollow Sections Structural Joints[M].Translated by CAO Jun-jie.Beijing:Science Press,1997.
[7]张建民,郑皆连,肖汝诚.钢管混凝土拱桥吊装过程的最优化计算分析[J].中国公路学报,2005,18(2):40-44.ZHANG Jian-min,ZHENG Jie-lian,XIAO Ru-cheng.Calculation Method for Optimizing the Installation Process of Concrete-filled Steel Tube Arch Bridge[J].China Journal of Highway and Transport,2005,18(2):40-44.
[8]陈宝春,肖泽荣,韦建刚.钢管混凝土哑铃形拱肋灌注混凝土时的截面应力分析[J].中国公路学报,2005,18(1):73-76.CHEN Bao-chun,XIAO Ze-rong,WEI Jian-gang.Analysis on Stresses of Dumbbell-shaped Cross-section of CFST Arch Rib During Concrete Pouring Construction[J].China Journal of Highway and Transport,2005,18(1):73-76.
[9]PACKER J A.Web Crippling of Rectangular Hollow Sections[J].Journal of Structural Engineering,1984,110(10):2 357-2 373.
[10]李小伟,赵均海,朱铁栋,等.方钢管混凝土轴压短柱的力学性能[J].中国公路学报,2006,19(4):77-81.LI Xiao-wei,ZHAO Jun-hai,ZHU Tie-dong,et al.Mechanics Behavior of Axially Loaded Short Columns with Concrete-filled Square Steel Tube[J].China Journal of Highway and Transport,2006,19(4):77-81.
[11]武振宇,张壮南,丁玉坤,等.K型、KK型间隙方钢管节点静力工作性能的试验研究[J].建筑结构学报,2004,25(2):32-38.WU Zhen-yu,ZHANG Zhuang-nan,DING Yu-kun,et al.Experimental Research on Static Behavior of Square Hollow Section K- and KK-joints[J].Journal of Building Structures,2004,25(2):32-38.
[12]韩 冰,王元丰.圆钢管混凝土轴心受压构件徐变分析的比较[J].中国公路学报,2007,20(2):83-86.HAN Bing,WANG Yuan-feng.Creep Analysis Comparison of Circular Axially Compressed Concrete-filled Steel Tubular Members[J].China Journal of Highway and Transport,2007,20(2):83-86.
[13]丁发兴,余志武.恒高温后圆钢管混凝土轴压短柱弹塑性分析[J].建筑科学与工程学报,2006,23(1):34-38.DING Fa-xing,YU Zhi-wu.Elasto-plastic Analysis of Concrete-filled Circular Steel Tube Stub Columns After Constant High Temperature[J].Journal of Architecture and Civil Engineering,2006,23(1):34-38.
[14]刘永健.矩形钢管混凝土桁架节点极限承载力试验与设计方法研究[D].长沙:湖南大学,2003.LIU Yong-jian.Experiments on Ultimate Bearing Capacity and Research on Design Method of Joints of Concrete-filled Rectangular Steel Tube Truss[D].Changsha:Hunan University,2003.
[15]王元丰,韩 冰.钢管混凝土轴心受压构件的徐变分析[J].中国公路学报,2000,13(2):57-60.WANG Yuan-feng,HAN Bing.Creep Analysis of Axially Compressed Concrete Filled Steel Tubular Members[J].China Journal of Highway and Transport,2000,13(2):57-60.
[16]刘永健,周绪红,邹银生,等.矩形钢管混凝土横向局部承压强度的试验研究[J].建筑结构学报,2003,24(2):42-48.LIU Yong-jian,ZHOU Xu-hong,ZOU Yin-sheng,et al.Experimental Research on Local Bearing Strength of Steel Tube Under Transverse Concrete Filled Rectangular Load[J].Journal of Building Structures,2003,24(2):42-48.
[17]韩林海,陶 忠,刘 威.长期荷载作用下方钢管混凝土轴心受压柱的变形特性[J].中国公路学报,2001,14(2):52-57.HAN Lin-hai,TAO Zhong,LIU Wei.Long-term Effects in Concrete-filled Steel Box Columns Under Sustained Loading[J].China Journal of Highway and Transport,2001,14(2):52-57.
[18]裴万吉,赵均海,魏雪英.钢管混凝土的截面形式及其承载力分析[J].建筑科学与工程学报,2006,23(1):49-53.PEI Wan-ji,ZHAO Jun-hai,WEI Xue-ying.Analysis of Section Types of Concrete-filled Steel Tube and Its Load Capacity[J].Journal of Architecture and Civil Engineering,2006,23(1):49-53.
[19]庄一舟,吴建华,吴开成.预应力钢管混凝土桁架应用与研究探讨[J].建筑结构学报,2003,24(2):38-41.ZHUANG Yi-zhou,WU Jian-hua,WU Kai-cheng.Study on Application and Theory of Prestressed Concrete Filled Steel Tubular Spatial Truss[J].Journal of Building Structures,2003,24(2):38-41.
[20]黄文金,陈宝春.钢管混凝土桁梁受弯试验研究[J].建筑科学与工程学报,2006,23(1):29-33.HUANG Wen-jin,CHEN Bao-chun.Experimental Research on Concrete-filled Steel Tube Truss Girder Under Bending[J].Journal of Architecture and Civil Engineering,2006,23(1):29-33.
[21]曹宝珠,周绪红,刘永健.钢管混凝土桁架新型节点试验研究[J].建筑科学与工程学报,2006,23(1):45-48.CAO Bao-zhu,ZHOU Xu-hong,LIU Yong-jian.Experimental Research on New Joints of Concrete Filled Steel Tube Truss[J].Journal of Architecture and Civil Engineering,2006,23(1):45-48.
[22]PACKER J A.Concrete-filled HSS Connections[J].Journal of Structural Engineering,1995,121(3):458-467.
[23]赵均海,郭红香,魏雪英.圆中空夹层钢管混凝土柱承载力研究[J].建筑科学与工程学报,2005,22(1):50-54.ZHAO Jun-hai,GUO Hong-xiang,WEI Xue-ying.Research on Bearing Capacity of Concrete-filled Double Skin Steel Tubes Column[J].Journal of Architecture and Civil Engineering,2005,22(1):50-54.