[1] DEMIAN P,FRUCHTER R.Measuring Relevance in Support of Design Reuse from Archives of Building Product Models[J].Journal of Computing in Civil Engineering,2005,19(2):119-136.
[2]FRUCHTER R,DEMIAN P.Corporate Memory in Action[C]//SONGER A D,MILES J C.International Workshop on Information Technology in Civil Engineering.Reston:American Society of Civil Engineers,2002:90-102.
[3]MAHER M L.CASECAD and CADSYN:Implementing Case Retrieval and Case Adaptation[C]//MAHER M L,PU P.Issues and Applications of Case-based Reasoning in Design.Mahwah:Lawrence Erlbaum Associates,1997:161-185.
[4]DOMESHEK E,KOLODNER J.Finding the Points of Large Cases[J].Artificial Intelligence for Engineering Design,Analysis and Manufacturing,1993,7(2):87-96.
[5]PAHL G,BEITZ W.Engineering Design-a Systematic Approach[M].2nd ed.London:Springer-verglag,1996.
[6]JENSEN T.A Taxonomy for Design Reuse System:Proposing a System for Formalized On-line Knowledge Capturing[C]//SIVALOGANATHAN S,SHAHIN T M M.Engineering Design Conference-Design Reuse.Edmunds:Professional Engineering Pub,1998:483-491.
[7]黄天祥,麦耀球,江见鲸,等.建筑工程项目的信息化管理[J].仪器仪表学报,2002,23(3):980-986.
HUANG Tian-xiang,MAI Yao-qiu,JIANG Jian-jing,et al.Construction Industry to Embrace Information Technology[J].Chinese Journal of Scientific Instrument,2002,23(3):980-986.
[8]何雄君,范立础,李丽平,等.大型桥梁施工预测控制系统研究[J].中国公路学报,2006,19(1):53-57.
HE Xiong-jun,FAN Li-chu,LI Li-ping,et al.Study of Prediction Control System for Construction of Bridges with Long Spans[J].China Journal of Highway and Transport,2006,19(1):53-57.
[9]梁 鹏,肖汝诚,徐 岳.超大跨度斜拉桥施工过程随机模拟分析[J].中国公路学报,2006,19(4):52-58.
LIANG Peng,XIAO Ru-cheng,XU Yue.Random Simulation Analysis of Construction Process for Super-long-span Cable-stayed Bridges[J].China Journal of Highway and Transport,2006,19(4):52-58.
[10]张启伟,周 艳.桥梁健康监测技术的适用性[J].中国公路学报,2006,19(6):54-58.
ZHANG Qi-wei,ZHOU Yan.Applicability of Bridge Health Monitoring Technology[J].China Journal of Highway and Transport,2006,19(6):54-58.
[11]胡 亮,李 黎,彭元诚,等.大跨桥梁抖振时域分析的程序化方法[J].中国公路学报,2006,19(6):59-64.
HU Liang,LI Li,PENG Yuan-cheng,et al.Computerized Approach for Buffeting Time-domain Analysis of Long-span Bridge[J].China Journal of Highway and Transport,2006,19(6):59-64.
[12]肖林萍,赵玉光,李永树.单拱大跨隧道信息化施工监控量测技术研究[J].中国公路学报,2005,18(4):62-66.
XIAO Lin-ping,ZHAO Yu-guang,LI Yong-shu.Research on Field Monitor Measuring Techniques in Informational Construction of Single Arch Long-span Tunnel[J].China Journal of Highway and Transport,2005,18(4):62-66.
[13]NORMAN R J.面向对象系统分析与设计[M].周之英,译.北京:清华大学出版社,2000.
NORMAN R J.Object-oriented System Analysis and Design[M].Translated by ZHOU Zhi-ying.Beijing:Tsinghua University Press,2000.
[14]SATZINGER J W,JACKSON R B,BURD S D.系统分析与设计[M].朱群雄,李 芳,汪晓男,译.北京:电子工业出版社,2003.
SATZINGER J W,JACKSON R B,BURD S D.System Analysis and Design[M].Translated by ZHU Qun-xiong,LI Fang,WANG Xiao-nan.Beijing:Publishing House of Electronics Industry,2003.
[15] BOOCH G,RUMBAUGH J,JACOBSON I.The Unified Modeling Language User Guide[M].Reading:Addison-Wesley,1998.
[16]RUMBAUGH J,JACOBSON I,BOOCH G.The Unified Modeling Language Reference Manual[M].Reading:Addison-Wesley,1998.