[1] 韦成龙,曾庆元,刘小燕.肋板结构受压构件的剪力滞效应分析[J].力学与实践,2001,23(2):41-43.
WEI Cheng-long,ZENG Qing-yuan,LIU Xiao-yan.Shear-lag Effect Analysis for Beam-and-slab Deck Under Axial Load[J].Mechanics in Engineering,2001,23(2):41-43.
[2]REISSNER E.Analysis of Shear Lag in Box Beams by Principle ofMinimum Potential Energy[J].Quarterly of Applied Mathematics,1946,5(3):268-278.
[3]郭金琼,房贞政,罗登孝.箱形梁桥剪力滞效应分析[J].土木工程学报,1983,16(1):1-13.
GUO Jin-qiong,FANG Zhen-zheng,LUO Deng-xiao.Shear-lag Effect Analysis of the Box Beam[J].China Civil Engineering Journal,1983,16(1):1-13.
[4]倪元增.槽形宽梁的剪力滞问题[J].土木工程学报,1986,19(4):32-41.
NI Yuan-zeng.Shear Lag Question of the Wide Flange Beam[J].China Civil Engineering Journal,1986,19(4):32-41.
[5]程翔云,罗旗帜.箱梁在压弯荷载共同作用下的剪力滞[J].土木工程学报,1991,24(1):52-64.
CHENG Xiang-yun,LUO Qi-zhi.Shear Lag of Box Gird Bridge Under Axial Load and Bending Load[J].China Civil Engineering Journal,1991,24(1):52-64.
[6]罗旗帜.压弯箱梁剪力滞计算的梁段有限元法[J].佛山大学学报,1994,12(2):23-31.
LUO Qi-zhi.Calculations of the Shear Lag in Box Griders Under Combined and Axial Loading by the Finite Segment Method[J].Journal of Foshan University,1994,12(2):23-31.
[7]蔡松柏,程翔云,邵旭东.Π形梁剪力滞效应的解析解[J].工程力学,2003,20(5):82-86.
CAI Song-bai,CHENG Xiang-yun,SHAO Xu-dong.An Analytical Solution for Shear-lag Effects of Flat-arch-shaped Beam Bridge[J].Engineering Mechanics,2003,20(5):82-86.
[8]吴文清,叶见曙,万 水,等.波形钢腹板组合箱梁在对称加载作用下剪力滞效应的试验研究[J].中国公路学报,2003,16(2):48-51.
WU Wen-qing,YE Jian-shu,WAN Shui,et al.Experiment Study of Shear Lag Effect of Composite Box Girder with Corrugated Steel Web Under the Symmetrical Load[J].China Journal of Highway and Transport,2003,16(2):48-51.
[9]刘世忠,欧阳永金,吴亚平,等.变截面薄壁箱梁剪力滞剪切变形效应分析[J].中国公路学报,2002,15(3):61-63.
LIU Shi-zhong,OUYANG Yong-jin,WU Ya-ping,et al.Non-uniform Thin Wall Box Analysis of Considering Both Shear Lag and Shear Deformation[J].China Journal of Highway and Transport,2002,15(3):61-63.
[10]沈蒲生,孟焕陵.框筒结构梁柱截面基于剪力滞最小的合理高度[J].建筑科学与工程学报,2005,22(3):16-19.
SHEN Pu-sheng,MENG Huan-ling.Reasonable Section Height of Beam and Column Based on the Minimum Shear Lag in Framed Tube Structures[J].Journal of Architecture and Civil Engineering,2005,22(3):16-19.
[11]张永健,黄平明.考虑剪力滞效应的简支箱梁自振特性[J].建筑科学与工程学报,2005,22(2):40-42.
ZHANG Yong-jian,HUANG Ping-ming.Free Vibration Characteristics of Simply Supported Box Girder with Effect of Shear Lag[J].Journal of Architecture and Civil Engineering,2005,22(2):40-42.
[12]韦成龙,曾庆元,刘小燕.薄壁曲线箱梁桥剪滞效应分析的一维有限单元法[J].中国公路学报,2000,13(1):65-68.
WEI Cheng-long,ZENG Qing-yuan,LIU Xiao-yan.One Dimensional Finite Element Method for Thin Walled Curved Box Beam Analysis Including the Shear Lag Effect[J].China Journal of Highway and Transport,2000,13(1):65-68.
[13]罗旗帜.变截面多跨箱梁桥剪滞效应分析[J].中国公路学报,1998,11(1):63-70.
LUO Qi-zhi.Analysis of the Shear Lag Effect on Continuous Box Girder Bridges with Variable Depth[J].China Journal of Highway and Transport,1998,11(1):63-70.
[14]张启伟,张士铎.单索面斜拉桥箱梁恒载剪力滞效应分析[J].中国公路学报,1997,10(1):39-43.
ZHANG Qi-wei,ZHANG Shi-duo.Analysis of Shear Lag Effect on Box Girder in P.C.Cable-stayed Bridge with Single Cable Plane[J].China Journal of Highway and Transport,1997,10(1):39-43.
[15]田仲初,王 雷.桥面结构横坡对宽翼缘Π梁剪力滞效应的影响[J].中外公路,2003,23(3):52-55.
TIAN Zhong-chu,WANG Lei.The Effect of Transverse Slope of Bridge Deck to the Shear Lag of Π Section Girder with Wide Flange[J].Journal of China & Foreign Highway,2003,23(3):52-55.
[16]彭大文,王 忠.连续弯箱梁剪滞效应分析和实用计算方法研究[J].中国公路学报,1998,11(3):41-49.
PENG Da-wen,WANG Zhong.Analysis of the Shear-lag Effect in Continuous Curved Box Girder Bridges and the Research on Practical Calculating Method [J].China Journal of Highway and Transport,1998,11(3):41-49.