|Table of Contents|

Finite Element Analysis of Construction Whole Process of Shanghai Qizhong Tennis Center(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2008年02期
Page:
90-95
Research Field:
Publishing date:
2008-06-20

Info

Title:
Finite Element Analysis of Construction Whole Process of Shanghai Qizhong Tennis Center
Author(s):
JIANG Dong-sheng XUE Wei-chen
Department of Architectural Engineering, Tongji University, Shanghai 200092, China
Keywords:
substructure method prestressed concrete spatial structure construction process finite element analysis stretching sequence
PACS:
TU378
DOI:
-
Abstract:
To research construction process of the structure system of Shanghai Qizhong Tennis Center which was characterized by its prestressed concrete structure stand supported by an operable steel roof and 8 mega-blades, the substructure finite element method was used for full-range analysis of the construction whole process of Shanghai Qizhong Tennis Center, which was also monitored. The results of analysis and monitoring show that the construction quality of Shanghai Qizhong Tennis Center is good, and can satisfy the design requirements. The substructure method which can decrease the data input, the rank of total stiffness matrix and the solution work load of system equations significantly, can allow for construction whole process simulation of large-scale spatial structures.

References:

[1] 季善标,毛炜青.上海八万人体育场大斜柱施工精密监[LL] [KG*3]测[J].工程勘察,1997(5):48-50.
JI Shan-biao,MAO Wei-qing.Construction Monitoring of Main Oblique Pillars for Shanghai Stadium[J].Geotechnical Investigation & Surveying,1997(5):48-50.
[2]白素珍.浅谈广州地铁二号线鹭中区间隧道施工监测[J].西部探矿工程,2004,16(3):101-102.
BAI Su-zhen.Construction Monitoring of Luzhong Tunnel of the 2nd Subway Line in Guangzhou[J].West-China Exploration Engineering,2004,16(3):101-102.
[3]陈建勋,杨 忠,袁雪戡.秦岭终南山特长公路隧道大埋深段施工监测及分析[J].建筑科学与工程学报,2006,23(3):71-75.
CHEN Jian-xun,YANG Zhong,YUAN Xue-kan.Construction Monitoring and Measuring in Segments of Large Embedded Depth in Qinling Zhongnanshan Super-long Highway Tunnel[J].Journal of Architecture and Civil Engineering,2006,23(3):71-75.
[4]陈 为,胡国祥.子结构法在预应力锚索抗滑桩中的应用[J].西部探矿工程,2004,16(9):47-49.
CHEN Wei,HU Guo-xiang.Application of Substructure Method in Anti-sliding Pipe with Prestressed Anchoring Cable[J].West-China Exploration Engineering,2004,16(9):47-49.
[5]江 建,何放龙,邹银生,等.高层建筑结构非线性地震反应分析的竖向空间子结构法[J].四川建筑科学研究,2001,27(3):32-34.
JIANG Jian,HE Fang-long,ZOU Yin-sheng,et al.Vertical Direction Spatial Substructure Analysis Method of Nonlinear Seismic Responses of Tall Structure[J].Sichuan Building Science,2001,27(3):32-34.
[6]陈国兴,庄海洋,史国龙.地铁车站结构地震反应分析的子结构法[J].防灾减灾工程学报,2004,24(4):396-401.
CHEN Guo-xing,ZHUANG Hai-yang,SHI Guo-long.Analysis on the Earthquake Response of Subway Station Based on the Substructure Subtraction Method[J].Journal of Disaster Prevention and Mitigation Engineering,2004,24(4):396-401.
[7]BIONDI B,MUSCOLINO G,SOFI A.A Substructure Approach for the Dynamic Analysis of Train-track-bridge System[J].Computers & Structures,2005,83(28/30):2271-2281.

Memo

Memo:
-
Last Update: 2008-06-20