[1] 薛伟辰.现代预应力结构设计[M].北京:中国建筑工业出版社,2003.
XUE Wei-chen.Design of the Modern Prestressed Structures[M].Beijing:China Architecture & Building Press,2003.
[2]陈德伟,郑信光.混凝土斜拉桥的施工控制[J].土木工程学报,1993,26(1):1-11.
CHEN De-wei,ZHENG Xin-guang.Construction of RC Cable-stayed Bridge[J].Journal of Civil Engineering,1993,26(1):1-11.
[3]刘汉顺,文武松.芜湖长江大桥主跨斜拉桥施工监控[J].桥梁建设,2003(3):19-21.
LIU Han-shun,WEN Wu-song.Construction Monitor-ing and Control for Cable-stayed Main Span of Wuhu Changjiang River Bridge[J].Bridge Construction,2003(3):19-21.
[4]董文德,高 波,申玉生.高速公路双连拱隧道施工监控量测及分析[J].现代隧道技术,2006,43(6):40-44.
DONG Wen-de,GAO Bo,SHEN Yu-sheng.Monitoring and Analysis of the Construction of a Double-arch Tunnel on Express Highway[J].Modern Tunnelling Technology,2006,43(6):40-44.
[5]陈以一,沈祖炎,赵宪忠,等.上海浦东国际机场候机楼R2钢屋架足尺试验研究[J].建筑结构学报,1999,20(2):9-17.
CHEN Yi-yi,SHEN Zu-yan,ZHAO Xian-zhong,et al.Experimental Study on a Full-scale Roof Truss of Shanghai Pudong International Airport Terminal[J].Journal of Building Structures,1999,20(2):9-17.
[6]邓 晖.大跨度张弦桁架的施工与监测[J].建筑技术,2004,35(11):822-823.
DENG Hui.Construction and Monitoring of Large-spanned Extension Truss[J].Architecture Technol-ogy,2004,35(11):822-823.
[7]刘 凯,高维成,刘宗仁.大跨张弦桁架新型施工工艺的理论与现场实测的研究[J].建筑结构学报,2004,25(5):60-65.
LIU Kai,GAO Wei-cheng,LIU Zong-ren.Research on Theory and Site Test of New-type Construction Technology for Truss String Structure[J].Journal of Building Structures,2004,25(5):60-65.
[8]魏建东.索力测定常用公式精度分析[J].公路交通科技,2004,21(2):53-56.
WEI Jian-dong.Precision Analysis of Conventional Formulas Calculating Cable Tension[J].Journal of Highway and Transportation Research and Development,2004,21(2):53-56.