[1] 贺拴海,宋一凡,周彦军.CFTS拱桥承载能力分析[J].西安公路交通大学学报,1998,18(增2):132-136.
HE Shuan-hai,SONG Yi-fan,ZHOU Yan-jun.Analysis of the Bearing Capacity of CFST Arch Bridges[J].Journal of Xi'an Highway University,1998,18(S2):132-136.
[2]钟善桐.钢管混凝土结构[M].北京:清华大学出版社,2003.
ZHONG Shan-tong.Concrete-filled Steel Tube Structures[M].Beijing:Tsinghua University Press,2003.
[3]蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003.
CAI Shao-huai.Modern Concrete-filled Steel Tube Structures[M].Beijing:China Communications Press,2003.
[4]陈宝春,韦建刚,王加迫.钢管混凝土拱桥的挠度限值研究[J].中国公路学报,2007,20(6):56-60.
CHEN Bao-chun,WEI Jian-gang,WANG Jia-po.Research on Deflection Limit Value for CFST Arch Bridge[J].China Journal of Highway and Transport,2007,20(6):56-60.
[5]陈宝春,肖泽荣,韦建刚.钢管混凝土哑铃形拱肋灌注混凝土时的截面应力分析[J].中国公路学报,2005,18(1):73-76.
CHEN Bao-chun,XIAO Ze-rong,WEI Jian-gang.An-alysis on Stresses of Dumbbell-shaped Cross-section of CFST Arch Rib During Concrete Pouring Construction[J].China Journal of Highway and Transport,2005,18(1):73-76.
[6]刘 扬,邬晓光,徐芳元.钢管造型拱竖向转体施工结构仿真分析[J].长安大学学报:自然科学版,2007,27(2):49-52.
LIU Yang,WU Xiao-guang,XU Fang-yuan.Simulation of Vertical Shift Constuction of Steel Tub Arch Bridge[J].Journal of Chang'an University:Natural Science Edition,2007,27(2):49-52.
[7]赵灿晖.上承式钢桁拱桥面内极限承载力分析[J].交通运输工程学报,2007,7(6):80-85.
ZHAO Can-hui.In-plane Ultimate Bearing Capacity Analysis of Deck-type Steel Braced Arch Bridge[J].Journal of Traffic and Transportation Engineering,2007,7(6):80-85.
[8]卢 斌,文 锋,李世清.大跨径钢管混凝土拱桥施工方法的风洞试验研究[J].筑路机械与施工机械化,2006,23(3):41-43.
LU Bin,WEN Feng,LI Shi-qing.Study of Wind-resistant of Integral Lifting Construction for Big Solid in Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Mechanization,2006,23(3):41-43.
[9]顾安邦.桥梁工程:下册[M].北京:人民交通出版社,1999.
GU An-bang.Bridge Engineering:Volume 2[M].Beijing:China Communications Press,1999.
[10]韦建刚,王加迫,陈宝春.钢管混凝土哑铃形拱肋设计刚度取值问题研究[J].福州大学学报:自然科学版,2007,35(4):582-587.
WEI Jian-gang,WANG Jia-po,CHEN Bao-chun.An-alysis of Rigidity in Design for CFST Dumbbell-rib Arch Bridges[J].Journal of Fuzhou University:Nat-ural Science,2007,35(4):582-587.
[11]盛 叶,陈宝春,韦建刚.新型钢管混凝土哑铃形偏压短柱试验研究[J].福州大学学报:自然科学版,2007,35(2):276-280.
SHENG Ye,CHEN Bao-chun,WEI Jian-gang.Experi-mental Research on Concrete Filled Steel Tubular Stubs with New Type Dumbbell Section Under Eccentrical Loads[J].Journal of Fuzhou University:Natural Science,2007,35(2):276-280.
[12]牛 宏,慕玉坤,张连锋.钢管混凝土拱桥加固设计与施工[J].公路,2008(9):261-264.
NIU Hong,MU Yu-kun,ZHANG Lian-feng.Strengthening Design and Construction of CFST Arch Bridge[J].Highway,2008(9):261-264.