[1] 范旭红,石启印,马 波.钢-混凝土组合梁的研究与展望[J].江苏大学学报:自然科学版,2004,25(1): 89-92.
FAN Xu-hong,SHI Qi-yin,MA Bo.Development and Perspective of Steel-concrete Composite Beams[J].Journal of Jiangsu University:Natural Science Edition,2004,25(1):89-92.
[2]胡少伟.组合梁抗扭分析与设计[M].北京:人民交通出版社,2005.
HU Shao-wei.Torsional Analysis and Design of Composite Beam[M].Beijing:China Communications Press,2005.
[3]包世华,周 坚.薄臂杆件结构力学[M].北京:中国建筑工业出版社,1991.
BAO Shi-hua,ZHOU Jian.Thin Pole Structure Mech-anics[M].Beijing:China Architecture & Building Press,1991.
[4]SINGH R K,MALLICK S K.Experiments on Steel-concrete Beams Subjected to Torsion Combined Flexure and Torsion[J].The Indian Concrete Journal,1977,51(1):24-30.
[5]殷芝霖,张 誉,王振东.抗扭[M].北京:中国铁道出版社,1990.
YIN Zhi-lin,ZHANG Yu,WANG Zhen-dong.Torsion[M].Beijing:China Railway Publishing House,1990.
[6]王传志,腾智明.钢筋混凝土结构理论[M].北京:中国建筑工业出版社,1985.
WANG Chuan-zhi,TENG Zhi-ming.Theory of Re-inforced Concrete Structures[M].Beijing:China Architecture & Building Press,1985.
[7]丁发兴,余志武,蒋丽忠.圆钢管混凝土轴压中长柱的承载力[J].中国公路学报,2007,20(4):65-70.
DING Fa-xing,YU Zhi-wu,JIANG Li-zhong.Bearing Capacity of Middle Long Concrete-filled Circular Steel Tubular Columns Under Axial Compression[J].China Journal of Highway and Transport,2007,20(4):65-70.
[8]韩 冰,王元丰.圆钢管混凝土轴心受压构件徐变分析的比较[J].中国公路学报,2007,20(2):83-86.
HAN Bing,WANG Yuan-feng.Creep Analysis Comparison of Circular Axially Compressed Concrete-filled Steel Tubular Members[J].China Journal of Highway and Transport,2007,20(2):83-86.
[9]张建仁,王 磊.既有钢筋混凝土桥梁构件承载力估算方法[J].中国公路学报,2006,19(2):49-55.
ZHANG Jian-ren,WANG Lei.Estimated Approach to Carrying Capacity of Existing Reinforced Concrete Bridge Member[J].China Journal of Highway and Transport,2006,19(2):49-55.
[10]曹国辉,方 志.钢筋混凝土连续宽箱梁受力性能试验[J].中国公路学报,2006,19(5):46-52.
CAO Guo-hui,FANG Zhi.Mechanical Behaviors Test of RC Continuous Box Girder with Wide Flange[J].China Journal of Highway and Transport,2006,19(5):46-52.
[11]樊世群,雷燕团,刘庆功.预应力梁混凝土的质量控制[J].筑路机械与施工机械化,2005,22(11):42-43.
FAN Shi-qun,LEI Yan-tuan,LIU Qing-gong.Concrete Quality Control of Bridge Prestress Beam[J].Road Machinery & Construction Mechanization,2005,22(11):42-43.
[12]吕颖钊,贺拴海.缺损钢筋混凝土梁桥模糊可靠性评价模型[J].交通运输工程学报,2005,5(4):58-62.
LU Ying-zhao,HE Shuan-hai.Fuzzy Reliability Evaluation of Defective RC Beam Bridge[J].Journal of Traffic and Transportation Engineering,2005,5(4):58-62.
[13]尼尔逊A H.混凝土结构设计[M].12版.过镇海,方鄂华,庄崖屏,等译.北京:中国建筑工业出版社,2003.
NILSEN A H.Concrete Structure Design[M].12th ed.Translated by GUO Zhen-hai,FANG E-hua,ZHUANG Ya-ping,et al.Beijing:China Architecture & Building Press,2003.
[14]GHOSH B,MALLICK S K.Strength of Steel-concrete Composite Beams Under Combined Flexure and Torsion[J].The Indian Concrete Journal,1979,53(2):186-194.