|Table of Contents|

Investigation of Construction Quality Evaluating Indices in PC Continuous Box-girder(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2009年03期
Page:
42-48
Research Field:
Publishing date:
2009-09-20

Info

Title:
Investigation of Construction Quality Evaluating Indices in PC Continuous Box-girder
Author(s):
WU Wen-qing1 CHEN Xiao-gang2 LI Bo1 XIE Qun-hua1
1. School of Transportation, Southeast University, Nanjing 210096, Jiangsu, China; 2. Zhejiang Provincial Planning Design & Research Institute of Communications, Hangzhou 310006, Zhejiang, China
Keywords:
bridge engineering PC continuous box-girder duct grouting concrete overweight construction quality evaluating index
PACS:
U446
DOI:
-
Abstract:
Based on the dismantlement of three prestressed concrete(PC)continuous box-girder bridges, several construction quality evaluating indices for PC box-girder structure were investigated on the spot,which consisted of the duct groutingdensity degree of prestressing bars, concrete overweight percent and concrete protector thickness and so on, and then the indices were analyzed statistically to find out the current construction quality of PC continuous box-girder. The results indicate that the overweight ratio of PC continuous box-girder in China is on the high level generally, it varies between 10% and 20%, and the performance of concrete overweight centres at top slab and low slab of box-girder generally. The duct area percentage of partial grouting for longitudinal prestressing bar is more than 50%, and the percentage for lateral prestressing bar duct grouting is more than 70%, but the performance of duct grouting being noncompacted in a large proportion make the prestressing loss increase obviously. In another side, the true calculating example in the paper indicates that concrete overweight and prestressing loss will enlarge the principal tension stress in PC box-girder, and make the possibility of structure cracking increase. The quantized surveyed indices proposed in the paper is helpful to realize the actual reason for cracking and big flexural down-warping of PC box-girder bridge, and also provide the important basis for structural analysis of PC box-girder.

References:

[1] 周 履.美国各类公路桥梁的结构缺陷率及使用寿命期望值的统计数据(1950~1994)[J].国外桥梁,1999(3):37. ZHOU Lu.Structure Defective Rate and Statistics Data for Service Life Expectation of All Highway Bridge in USA(1950~1994)[J].Foreign Bridges,1999(3):37.
[2]王国亮,谢 峻,傅宇方.在用大跨度预应力混凝土箱梁桥裂缝调查研究[J].公路交通科技,2008,25(8):52-56. WANG Guo-liang,XIE Jun,FU Yu-fang.Investigation Research on Crack of Long-span Prestressed Concrete Box Girder Bridges in Service[J].Journal of Highway and Transportation Research and Development,2008,25(8):52-56.
[3]谢 峻,王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,24(1):47-50. XIE Jun,WANG Guo-liang,ZHENG Xiao-hua.State of Art of Long-term Deflection for Long Span Prestressed Concrete Box-girder Bridge[J].Journal of Highway and Transportation Research and Development,2007,24(1):47-50.
[4]卢树圣.现代预应力混凝土桥梁结构的新发展[J].桥梁建设,1996(1):41-48. LU Shu-sheng.New Advancements in Modern Prestressed Concrete Bridge Structures[J].Bridge Construction,1996(1):41-48.
[5]周 履.无粘结力筋与体外力筋预应力混凝土桥梁的发展历程与现状[J].桥梁建设,1997(3):1-12. ZHOU Lu.A Historical Review and the State of the Art of the Application of Unbonded and External Tendons in Prestressed Concrete Bridges[J].Bridge Construction,1997(3):1-12.
[6]杜进生,刘西拉.无粘结预应力混凝土构件的可靠度分析[J].建筑结构学报,2002,23(1):68-74. DU Jin-sheng,LIU Xi-la.Reliability Analysis of Unbonded Prestressed Concrete Members[J].Journal of Building Structures,2002,23(1):68-74.
[7]LI X P,ROBERTSON I N.Long-term Performance Predictions of the North Halawa Valley Viaduct[R].Honolulu:University of Hawaii,2003.
[8]李祖云.桥梁结构采用无粘结预应力混凝土之我见[J].中南公路工程,1999,24(1):39-40. LI Zu-yun.My View to the Application of Unbonded Prestressed Concrete in Bridge Structure[J].Central South Highway Engineering,1999,24(1):39-40.
[9]郭秉山,彭 军,刘朝科.梁腹板削弱式刚性钢框架抗震性能研究[J].西安科技大学学报,2007,27(3):364-367. GUO Bing-shan,PENG Jun,LIU Chao-ke.Anti-seismic Performance Testing of New Beam-to-column Connections in Steel Frames[J].Journal of Xi'an University of Science and Technology,2007,27(3):364-367.
[10]赵 煜,刘 波.大曲率连续钢箱梁桥剪力滞试验与分析[J].西安科技大学学报,2006,26(3):311-316. ZHAO Yu,LIU Bo.Test and Analysis of Shear Lag for Continuous Steel Bridge with Large Curvature[J].Journal of Xi'an University of Science and Technology,2006,26(3):311-316.
[11]王春生,宋天诣,冯亚成,等.高强钢-混凝土组合梁受力性能分析[J].交通运输工程学报,2008,8(2):27-33. WANG Chun-sheng,SONG Tian-yi,FENG Ya-cheng,et al.Structural Behavior Analysis of High Strength Steel-concrete Composite Girders[J].Journal of Traffic and Transportation Engineering,2008,8(2):27-33.
[12]张 峰,叶见曙,徐向锋.预应力混凝土梁非线性分析单元模型[J].交通运输工程学报,2007,7(5):68-72. ZHANG Feng,YE Jian-shu,XU Xiang-feng.Nonlinear Analysis Element Model of Prestressed Concrete Beam[J].Journal of Traffic and Transportation Engin-eering,2007,7(5):68-72.

Memo

Memo:
-
Last Update: 2009-09-20