|Table of Contents|

Finite Element Analysis of Connection for Steel Pylon and Concrete Foundation(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2010年02期
Page:
89-95
Research Field:
Publishing date:
2010-06-20

Info

Title:
Finite Element Analysis of Connection for Steel Pylon and Concrete Foundation
Author(s):
WANG Chun-sheng WANG Ding WANG Qian YU Xin WANG Xin-xin
Key Laboratory for Bridge and Tunnel of Shaanxi Province,Chang'an University, Xi'an 710064, Shaanxi, China
Keywords:
steel pylon concrete foundation finite element model submerged connection bolt anchored connection
PACS:
TU317.1
DOI:
-
Abstract:
The force characteristics of submerged connection and bolt anchored connection were summarized through analyzing the construction form of the typical connection for steel pylon and concrete foundation structures by using finite element models and simplified mechanics models. Also, the mechanics performances of the two connections were compared and analyzed. The results indicate that submerged connection has powerful integer rigidity and vertical compression bearing capacity, but there maybe occur tensile stress in the concrete of the upper part of foundation when bending moment exists. Bolts anchored connection has strong capacity of bending resistance and withdrawal resistance under the horizontal loads of steel pylon, but the ultimate compression bearing capacity will be smaller relatively.

References:

[1] 小西一郎.钢桥:第五分册[M].戴振藩,译.北京:人民铁道出版社,1981. KONISHI I.Steel Bridge:5th Volume[M].Translated by DAI Zhen-fan.Beijing:People Railway Publishing House,1981.
[2]BARON F,ARIOTO A G.Torsional Analysis of Suspension Bridge Towers[J].Journal of Structural Division,1960,86(1):143-169.
[3]陆新征,江见鲸.用ANSYS Solid65单元分析混凝土组合构件复杂应力[J].建筑结构,2003,33(6):22-24. LU Xin-zheng,JIANG Jian-jing.Analysis for Concrete Structures Under Complex Stress Conditions with Solid65 FEA Element of ANSYS[J].Building Structure,2003,33(6):22-24.
[4]吕西林,金国芳,吴晓涵.钢筋混凝土结构非线性有限元理论与应用[M].上海:同济大学出版社,1997. LU Xi-lin,JIN Guo-fang,WU Xiao-han.Nonlinear Finite Element Theory and Application of Reinforced Concrete Structures[M].Shanghai:Tongji University Press,1997.
[5]龚曙光.ANSYS基础应用及范例解析[M].北京:机械工业出版社,2003. GONG Shu-guang.ANSYS Elementary Application and Model Analysis[M].Beijing:China Machine Press,2003.
[6]韦芳芳,吕志涛,孙文彬.部分剪力连接钢-混凝土组合梁的非线性有限元分析[J].工业建筑,2003,33(9):78-79,88. WEI Fang-fang,LU Zhi-tao,SUN Wen-bin.Nonlinear Finite Element Analysis of Composite Steel-concrete Beams with Partial Shear Connection[J].Industrial Construction,2003,33(9):78-79,88.
[7]宗周红,车惠民.剪力连接件静载和疲劳试验研究[J].福州大学学报:自然科学版,1999,27(6):61-66. ZONG Zhou-hong,CHE Hui-min.Experimental Study of Shear Connector Under Static and Fatigue Loading[J].Journal of Fuzhou University:Natural Science,1999,27(6):61-66.
[8]聂建国,沈聚敏,袁彦声,等.钢-混凝土组合梁中剪力连接件实际承载力的研究[J].建筑结构学报,1996,17(2):21-28. NIE Jian-guo,SHEN Ju-min,YUAN Yan-sheng,et al.Experiment and Analysis of Actual Shear Capacity of Shear Connectors in Composite Steel-concrete Beams[J].Journal of Building Structures,1996,17(2):21-28.
[9]王 茜,王春生,俞 欣,等.钢桥塔局部稳定试验与数值分析[J].长安大学学报:自然科学版,2008,28(5):67-72. WANG Qian,WANG Chun-sheng,YU Xin,et al.Experimental Investigation and Numerical Analysis on Local Buckling Behavior of Steel Bridge Towers[J].Journal of Chang'an University:Natural Science Edition,2008,28(5):67-72.
[10]王春生,黄本才,俞 欣,等.钢桥塔的塔形力学特性分析[J].长安大学学报:自然科学版,2007,27(4):46-51. WANG Chun-sheng,HUANG Ben-cai,YU Xin,et al.Mechanics Behavior Analysis on Steel Pylons of Bridge Structures[J].Journal of Chang'an Univer-sity:Natural Science Edition,2007,27(4):46-51.
[11]胡建华,叶梅新,黄 琼.PBL剪力连接件承载力试验[J].中国公路学报,2006,19(6):65-72. HU Jian-hua,YE Mei-xin,HUANG Qiong.Experiment on Bearing Capacity of PBL Shear Connectors[J].China Journal of Highway and Transport,2006,19(6):65-72.
[12]卢小松,顾 强.钢框架梁柱栓-焊混合连接极限弯矩的计算[J].西安建筑科技大学学报:自然科学版,2008,40(4):491-498. LU Xiao-song,GU Qiang.The Moment Capacity of Welded-bolted Beam to Column Connections in Steel Framework[J].Journal of Xi'an University of Architecture & Technology:Natural Science Edition,2008,40(4):491-498.

Memo

Memo:
-
Last Update: 2010-06-20