|Table of Contents|

Research on Partially Concrete-filled Steel Tubular Bridges(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2010年02期
Page:
96-101
Research Field:
Publishing date:
2010-06-20

Info

Title:
Research on Partially Concrete-filled Steel Tubular Bridges
Author(s):
YE Zhuo-qi1 YANG Jian2 LIU Yong-jian2 LI Yun-xi3
1. Dongguan Road & Bridge Development Construction Corporation, Dongguan 523120, Guangdong, China; 2. Key Laboratory for Bridge and Tunnel of Shaanxi Province, Chang’an University, Xi’an 710064, Shaanxi,China; 3. Jiangsu Transportation Research Inst
Keywords:
partially concrete-filled steel tubular structure steel tubular truss bridge static and dynamic characteristic chord
PACS:
U448.38
DOI:
-
Abstract:
A summary of existing researches on steel tubular structures was presented. Structural styles and engineering applications for partially concrete-filled steel tubular bridges were analyzed based on the above researches. Structural styles of partially concrete-filled steel tubular truss bridges were also analyzed. The prospects for the development on this novel kind of steel tubular truss bridges and their advantages were discussed. At last, static and dynamic characteristics of a continuous steel bridge stiffened with rigid cables were compared with that of the partially concrete-filled truss bridge. The results show that the stresses of chord members of partially concrete-filled steel truss bridge are decreased, while its integral stiffness is increased.

References:

[1] NAKAMURA S,MOMIYAMA Y,HOSAKA T,et al.New Technologies of Steel Concrete Composite Bridges[J].Journal of Constructional Steel Research,2002,58(1):99-130.
[2]陈 平,李 亮,陈念斯.大跨度钢管加劲梁斜拉桥的设计[J].世界桥梁,2003(1):10-13.CHEN Ping,LI Liang,CHEN Nian-si.Design of Large Span Cable-stayed Bridges with Steel Tubular Girders[J].World Bridges,2003(1):10-13.
[3]林 英.钢管-钢管混凝土复合拱桥面内受力性能试验研究[D].福州:福州大学,2000.LIN Ying.Experimental Research on Mechanical Behavior in the Plane of Steel Tube and Concrete Filled Steel Tube Composite Arch Bridges[D].Fuzhou:Fuzhou University,2000.
[4]潘桥文.双层桥面飞雁式钢管-钢管混凝土复合拱桥动力分析[D].福州:福州大学,2006.PAN Qiao-wen.Dynamic Analysis of Hybrid Arch Bridge of Steel Tube and Concrete Filled Steel Tube with Double Decks Flying Goose Model[D].Fuzhou:Fuzhou University,2006.
[5]张 贝.部分灌注钢管混凝土拱桥稳定性研究[D].西安:长安大学,2002.ZHANG Bei.Research on Stability of Steel Tubular Arch Bridges with Partial Concrete Filling[D].Xi’an:Chang’an University,2002.
[6]刘永健,周绪红,刘君平.主管内填混凝土的矩形钢管X型节点受拉和受弯性能试验研究[J].建筑结构学报,2009,30(1):82-86,94.LIU Yong-jian,ZHOU Xu-hong,LIU Jun-ping.Experimental Research on Rectangular Steel Tube X-joints with Chord Concrete-inside Subjected to Tension and Bending[J].Journal of Building Structures,2009,30(1):82-86,94.
[7]刘永健,刘君平,杨根杰,等.主管内填充混凝土矩形钢管桁架受力性能试验研究[J].建筑结构学报,2009,30(6):107-112.LIU Yong-jian,LIU Jun-ping,YANG Gen-jie,et al.Experimental Research on Mechanical Behavior of RHS Trusses with Concrete-filled in Chord[J].Journal of Building Structures,2009,30(6):107-112.
[8]刘永健,刘君平,张俊光.主管内填混凝土矩形和圆形钢管桁架受弯性能对比试验研究[J].建筑结构学报,2010,31(4):86-93.LIU Yong-jian,LIU Jun-ping,ZHANG Jun-guang.Experimental Research on RHS and CHS Truss with Concrete Filled Chord[J].Journal of Building Structures,2010,31(4):86-93.
[9]白宝鸿.法国昂特那斯钢管拱桥[J].国外桥梁,1998(3):5-6.BAI Bao-hong.Antrenas Steel Tubular Arch Bridge in France[J].Foreign Bridges,1998(3):5-6.
[10]张联燕,李泽生,程懋方.钢管混凝土空间桁架组合梁式结构[M].北京:人民交通出版社,1999.ZHANG Lian-yan,LI Ze-sheng,CHENG Mao-fang.Concrete-filled Steel Tubular Spatial Truss Structures[M].Beijing:China Communications Press,1999.
[11]陈永健,郑 振,潘桥文.双层桥面飞雁式钢管-钢管混凝土复合拱桥动力分析[J].福建建筑,2007(12):98-100.CHEN Yong-jian,ZHENG Zhen,PAN Qiao-wen.Dynamic Analysis of Fly-bird-type Hybrid Arch Bridge of Steel Tube and Concrete Filled Steel Tube with Double-decks[J].Fujian Architecture & Construction,2007(12):98-100.
[12]许凯明,张明中,王 佶.大跨度钢管混凝土拱桥施工阶段非线性稳定分析[J].西安建筑科技大学学报:自然科学版,2008,40(4):556-560,566.XU Kai-ming,ZHANG Ming-zhong,WANG Ji.Nonlinear Stability Analysis of Long-span CFST Arch Bridge Under Construction[J].Journal of Xi’an University of Architecture & Technology:Natural Science Edition,2008,40(4):556-560,566.
[13]闫月梅,杜晓巍.钢管混凝土柱加强环式节点的有限元分析[J].西安科技大学学报,2005,25(1):24-27.YAN Yue-mei,DU Xiao-wei.Finite Element Analysis for Enforced Loop Joint of Concrete Filled Steel-tubular Column[J].Journal of Xi’an University of Science and Technology,2005,25(1):24-27.
[14]韦建刚,陈宝春.钢管混凝土拱桥拱肋刚度设计取值分析[J].交通运输工程学报,2008,8(2):34-39.WEI Jian-gang,CHEN Bao-chun.Analysis on Rib Rigidity of Concrete Filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2008,8(2):34-39.
[15]刘永健,李运喜,刘君平,等.受压弦管填充混凝土的矩形钢管桁架静力性能分析[J].建筑科学与工程学报,2008,25(4):65-72.LIU Yong-jian,LI Yun-xi,LIU Jun-ping,et al.Static Behavior Analysis of RHS Trusses with Concrete-filled Compression Chord Member[J].Journal of Architecture and Civil Engineering,2008,25(4):65-72.
[16]王 达,黄平明,张光国,等.PC斜拉式桁架梁桥动力特性[J].长安大学学报:自然科学版,2006,26(6):39-44.WANG Da,HUANG Ping-ming,ZHANG Guang-guo,et al.Dynamic Characteristics of PC Cable Stayed Truss Bridge[J].Journal of Chang’an University:Natural Science Edition,2006,26(6):39-44.
[17]许凯明,张明中.大跨径钢管混凝土拱桥主拱混凝土灌注阶段空间稳定分析[J].筑路机械与施工机械化,2008,25(12):66-68,72.XU Kai-ming,ZHANG Ming-zhong.Spatial Stability Research on Concrete Construction Stage of Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Construction Mechanization,2008,25(12):66-68,72.
[18]卢 斌,文 锋,李世清.大跨径钢管混凝土拱桥施工方法的风洞试验研究[J].筑路机械与施工机械化,2006,23(3):41-43.LU Bin,WEN Feng,LI Shi-qing.Study of Wind-resistant of Integral Lifting Construction for Big Solid in Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Mechanization,2006,23(3):41-43.
[19]刘永健,周绪红,刘君平.矩形钢管混凝土T、Y型节点受压性能试验[J].长安大学学报:自然科学版,2008,28(5):48-52.LIU Yong-jian,ZHOU Xu-hong,LIU Jun-ping.Behavior of Concrete Filled Rectangular Steel Tube T-joints and Y-joints Under Compression[J].Journal of Chang’an University:Natural Science Edition,2008,28(5):48-52.
[20]许兆军,侯文葳,张玉玲.公铁两用桥在我国的应用前景[J].铁道建筑,2000(12):16-19.XU Zhao-jun,HOU Wen-wei,ZHANG Yu-ling.Application Prospects of Highway and Railway Bridges in China[J].Railway Engineering,2000(12):16-19.
[21]刘永健,刘 剑,钟冠星,等.刚性悬索加劲钢桁梁桥施工阶段力学性能[J].交通运输工程学报,2009,9(3):1-10.LIU Yong-jian,LIU Jian,ZHONG Guan-xing,et al.Mechanical Behavior of Steel Truss Bridge Stiffened with Rigid Cables in Construction Stage[J].Journal of Traffic and Transportation Engineering,2009,9(3):1-10.
[22]刘永健,刘 剑,刘君平,等.刚性悬索加劲钢桁梁桥施工阶段全桥模型试验研究[J].土木工程学报,2010,43(2):72-78.LIU Yong-jian,LIU Jian,LIU Jun-ping,et al.Integral Model Test of Steel Truss Bridge Stiffened with Rigid Cables in Construction Stage[J].China Civil Engineering Journal,2010,43(2):72-78.
[23]李运喜.受压弦杆填充混凝土的矩形钢管(钢箱)桁架静力性能研究[D].西安:长安大学,2008.LI Yun-xi.Study on the Static Behavior of Rectangular Steel Tube Truss with Concrete-filled Compression Chord[D].Xi’an:Chang’an University,2008.

Memo

Memo:
-
Last Update: 2010-06-20