[1] 谢 峻,王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,24(1):47-50.
XIE Jun,WANG Guo-liang,ZHENG Xiao-hua.State of Art of Long-term Deflection for Long Span Pre-stressed Concrete Box-girder Bridge[J].Journal of Highway and Transportation Research and Development,2007,24(1):47-50.
[2]MADSEN H O,BAZANT Z P.Uncertainty Analysis of Creep and Shrinkage Effects in Concrete Structures[J].ACI Journal,1983,82(2):116-127.
[3]张建仁,汪维安,余钱华.高墩大跨连续刚构桥收缩徐变效应的概率分析[J].长沙交通学院学报,2006,22(2):1-7,28.
ZHANG Jian-ren,WANG Wei-an,YU Qian-hua.Probabilistic Analysis of Shrinkage and Creep Effect for Continuous Rigid Frame Bridges with Longspan and High Piers[J].Journal of Changsha Communications University,2006,22(2):1-7,28.
[4]潘钻峰,吕志涛,刘 钊,等.苏通大桥连续刚构收缩徐变效应的不确定性分析[J].工程力学,2009,26(9):67-73.
PAN Zuan-feng,LU Zhi-tao,LIU Zhao,et al.Uncertainty Analysis of Creep and Shrinkage Effect in Continuous Rigid Frame of Sutong Bridge[J].Engineering Mechanics,2009,26(9):67-73.
[5]ANG A H S,TANG W H.Probability Concepts in Engineering Planning and Design:Basic Principles[M].New York:John Wiley & Sons,1975.
[6]JTG D62—2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
JTG D62—2004,Code for Design of Highway Re-inforce Concrete and Prestressed Concrete Bridges and Culverts[S].
[7]BAZANT Z P,BAWEJA S.Justification and Refinements of Model B3 for Concrete Creep and Shrinkage 1:Statistics and Sensitivity[J].Materials and Structures,1995,28:415-430.
[8]REINHARDT H W,PAT M G M,WITTMANN F H.Variability ofCreep and Shrinkage of Concrete[C]//BAZANT Z P,WITTMANN F H.International Symposium on Fundamental Research on Creep and Shrinkage of Concrete.Hague:Martinus Nijhoff Publisher,1982:75-94.
[9]BAZANT Z P,LIU K L.Random Creep and Shrinkage in Structures:Sampling[J].Journal of Structural Engineering,1985,111(5):1113-1134.
[10]JTJ 041—2000,公路桥涵施工技术规范[S].
JTJ 041—2000,Technical Specifications for Construction of Highway Bridges and Culverts[S].
[11]曾有艺.预应力摩阻损失及其对预应力混凝土连续刚构桥受力性能影响的研究[D].长沙:长沙理工大学,2009.
ZENG You-yi.Research on the Friction Loss and Its Influence to the Structural Behaviors of PC Continuous Rigid Frame Bridge[D].Changsha:Changsha University of Science & Technology,2009.
[12]吴建军.预应力混凝土箱梁长预应力束孔道摩阻损失的测试[J].福建建材,2007(3):49-51.
WU Jian-jun.Test on Friction Loss of Long Prestressed Tedons of PC Box Girder[J].Fujian Building Materials,2007(3):49-51.
[13]李忠献,吴沛峰,陈培奇.预应力摩擦损失的试验研究[J].天津城市建设学院学报,2003,9(1):28-31.
LI Zhong-xian,WU Pei-feng,CHEN Pei-qi.Experimental Study on Friction Loss of Prestress[J].Journal of Tianjin Institute of Urban Construction,2003,9(1):28-31.
[14]涂杨志,张开银,张世飙,等.大跨度PC桥孔道摩阻偏差系数试验研究[J].公路交通科技,2003,20(6):45-48.
TU Yang-zhi,ZHANG Kai-yin,ZHANG Shi-biao,et al.Experiment Research on the Friction Factor Between Tendons and Duct Wall in Long-span PC Continuous Beam Bridge[J].Journal of Highway and Transportation Research and Development,2003,20(6):45-48.
[15]赵国藩,宋玉普,谭克俊,等.大连市疏港路S形曲线连续箱梁桥预应力摩擦损失试验研究[J].预应力技术,2004(4):4-12.
ZHAO Guo-fan,SONG Yu-pu,TAN Ke-jun,et al.Test Study of Prestressing Friction Loss of S-curved Continuous Box Bridge in Shugang Road of Dalian[J].Prestress Technology,2004(4):4-12.
[16]胡光祥,陈东杰,赵 勇,等.空间曲线预应力束摩擦损失的测试和摩擦系数反演[J].建筑科学,2004,20(5):26-29.
HU Guang-xiang,CHEN Dong-jie,ZHAO Yong,et al.Test Study on Prestress Loss Due to Friction for Space-curved Tendons and Inversion Analysis on Friction Coefficient[J].Building Science,2004,20(5):26-29.
[17]宋玉普,车 轶,马德有,等.空间多曲线型预应力钢索的预应力摩擦损失研究[J].土木工程学报,2002,35(6):105-108.
SONG Yu-pu,CHE Yi,MA De-you,et al.Study on Losses of Prestress Due to Friction for Curved Prestressing Tendon[J].China Civil Engineering Journal,2002,35(6):105-108.
[18]汪 剑.大跨预应力混凝土箱梁桥非荷载效应及预应力损失研究[D].长沙:湖南大学,2006.
WANG Jian.Prediction of Thermal Effects,Shrinkage and Creep Effects,and Prestress Losses in Long-span PC Box Girder Bridge[D].Changsha:Hunan University,2006.
[19]贺国京,邹永旺,易 锦.石梅湾大桥32 m箱梁预应力孔道摩阻试验研究[J].中南林业科技大学学报,2010,30(1):69-72,94.
HE Guo-jing,ZOU Yong-wang,YI Jin.Frictional Test Research of Pre-stressed Tube in 32-meter Simply Supported Girder of Shimeiwan Bridge[J].Journal of Central South University of Forestry & Technology,2010,30(1):69-72,94.
[20]李永斌.大跨径刚构-连续组合梁桥结构计算与预应力损失研究[D].武汉:武汉理工大学,2005.
LI Yong-bin.The Calculation and Research on Prestressed Loss of Long Span Rigid Continuous Composite Beam Bridge[D].Wuhan:Wuhan University of Technology,2005.
[21]刘纯平.威胜利塑料波纹管的应用与其摩阻系数的测定[J].城市道桥与防洪,2004(3):101-103.
LIU Chun-ping.Application of VSL Plastic Bellow and Determination of Its Friction Coefficient[J].Urban Roads,Bridges & Flood Control,2004(3):101-103.
[22]张秋陵,肖光宏.塑料波纹管曲线预应力束摩阻损失系数的试验研究[J].重庆交通学院学报,2004,23(增1):7-8,24.
ZHANG Qiu-ling,XIAO Guang-hong.Test & Study on Friction Loss of Prestress Wire with Space Curve in Plastic Pipe[J].Journal of Chongqing Jiaotong University,2004,23(S1):7-8,24.
[23]徐敬淼,艾建强.青岛海湾大桥60 m预应力混凝土箱梁整体预制施工质量控制要点[J].公路,2009(9):135-141.
XU Jing-miao,AI Jian-qiang.Main Points of Overall Precast Construction Quality of 60 m Prestressed Concrete Box Girder in Qingdao Gulf Bridge[J].Highway,2009(9):135-141.
[24]刘红梁,宋罕宇,陆钦年.高强混凝土立方体强度变异系数的商榷[J].哈尔滨商业大学学报:自然科学版,2004,20(5):604-607.
LIU Hong-liang,SONG Han-yu,LU Qin-nian.Discussion on Variation Factor of High-strength Concrete Cube Strength[J].Journal of Harbin University of Commerce:Natural Sciences Edition,2004,20(5):604-607.
[25]GB/T 50283—1999,公路工程结构可靠度设计统一标准[S].
GB/T 50283—1999,Unified Standard for Reliability Design of Highway Engineering Structures[S].
[26]赵 曼,王新敏,阎贵平.整体式箱梁张拉过程的仿真分析[J].西安建筑科技大学学报:自然科学版,2006,38(4):564-568.
ZHAO Man,WANG Xin-min,YAN Gui-ping.Simulative Analysis of Stretching Process of Monolithic Box Beam[J].Journal of Xi'an University of Architecture & Technology:Natural Science Edition,2006,38(4):564-568.
[27]叶见曙,张 峰.预应力混凝土连续箱梁开裂后的刚度退化模型[J].中国公路学报,2007,20(6):67-72.
YE Jian-shu,ZHANG Feng.Stiffness Degeneration Model of Prestressed Concrete Continuous Box Girder After Cracking[J].China Journal of Highway and Transport,2007,20(6):67-72.
[28]周 勇,张 峰,李术才,等.开裂后预应力混凝土连续箱梁计算模型[J].长安大学学报:自然科学版,2008,28(3):53-58.
ZHOU Yong,ZHANG Feng,LI Shu-cai,et al.Evaluation Model ofPre-stressed Concrete Continuous Box Girders After Cracking[J].Journal of Chang'an University:Natural Science Edition,2008,28(3):53-58.
[29]王钧利,贺拴海.高墩大跨径连续刚构弯桥全过程非线性稳定分析[J].长安大学学报:自然科学版,2008,28(3):49-52.
WANG Jun-li,HE Shuan-hai.Nonlinear Stability of Long-span Curve Rigid Bridge with High Piers in Whole Process[J].Journal of Chang'an University:Natural Science Edition,2008,28(3):49-52.
[30]刘永健,刘 剑,朱 铭,等.双层桥面三桁刚性悬索加劲钢桁梁桥全桥静动力模型设计[J].建筑科学与工程学报,2008,25(1):84-87,95.
LIU Yong-jian,LIU Jian,ZHU Ming,et al.Static and Dynamic Model Design of Total Bridge of Double-deck and Three Main Trusses Steel Bridge with Rigid Cable[J].Journal of Architecture and Civil Engineering,2008,25(1):84-87,95.
[31]宋和平,黄秀钢,赵 丽,等.现浇箱梁上部结构的施工[J].筑路机械与施工机械化,2008,28(7):58-60.
SONG He-ping,HUANG Xiu-gang,ZHAO Li,et al.Construction of Upper Structure of Cast-in-situ Box Girder[J].Road Machinery & Construction Mechanization,2008,28(7):58-60.