|Table of Contents|

Dynamic Characteristic and Wind Resistance Behavior of High-pierLong-span Cable-stayed Bridge for Urban Rail Transit(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2010年04期
Page:
19-24
Research Field:
Publishing date:
2010-12-20

Info

Title:
Dynamic Characteristic and Wind Resistance Behavior of High-pierLong-span Cable-stayed Bridge for Urban Rail Transit
Author(s):
LI Yong-le DI Yue-long ZHAO Tong JIANG Xiao-wei
Department of Bridge Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China
Keywords:
long-span cable-stayed bridge dynamic characteristic multi-mode coupling vibration wind-induced response wind resistance behavior
PACS:
U448.27
DOI:
-
Abstract:
Taking the three schemes of high-pier long-span cable-stayed bridge for urban rail transit as the engineering background, the spatial finite element models were built respectively. The dynamic characteristics of the structures were calculated, and the natural frequencies and vibration mode characteristics were comparatively analyzed. Based on a self-developed bridge structure analysis software BANSYS, the stabilities of the structures under the static wind load were studied with the theory of two-dimensional flow field, meanwhile, the buffeting displacement and buffeting internal force induced by fluctuating wind of high-pier long-span cable-stayed bridge for urban rail transit were comparatively analyzed by using the multi-mode coupled vibration analysis method. Results show that the whole structure of the high-pier long-span cable-stayed bridge for urban rail transit is flexible; moreover, the differences of dynamic characteristics and wind-induced responses among the three schemes should not be neglected due to the discrepancy in structures.

References:

[1] 严国敏.现代斜拉桥[M].成都:西南交通大学出版社,1996.YAN Guo-min.Modern Cable-stayed Bridges[M].Chengdu:Southwest Jiaotong University Press,1996.
[2]胡峰强,陈艾荣,林铁良.杭州湾南航道独塔斜拉桥抗风性能试验研究[J].工程力学,2006,23(8):132-137,167.HU Feng-qiang,CHEN Ai-rong,LIN Tie-liang.Experimental Investigation on Wind-resistant Behavior of the Single-tower Cable-stayed Bridge over South Channel of Hangzhou Gulf[J].Engineering Mechanics,2006,23(8):132-137,167.
[3]李永乐,廖海黎,强士中.三塔斜拉桥抖振的耦合行为研究[J].工程力学,2004,21(4):184-188.LI Yong-le,LIAO Hai-li,QIANG Shi-zhong.Coupled Behavior in Buffeting Response of Three-pylon Cable-stayed Bridge[J].Engineering Mechanics,2004,21(4):184-188.
[4]杨咏漪,廖海黎,李永乐.基于ANSYS的斜拉桥抖振时域实用分析方法[J].空气动力学学报,2004,22(4):457-460.YANG Yong-yi,LIAO Hai-li,LI Yong-le.Simplified Buffeting Analysis in Time Domain on the Basis of ANSYS for Cable-stayed Bridge[J].Acta Aerodynamica Sinica,2004,22(4):457-460.
[5]李永乐,廖海黎,强士中.桥梁抖振时域和频域分析的一致性研究[J].工程力学,2005,22(2):179-183.LI Yong-le,LIAO Hai-li,QIANG Shi-zhong.Bridge Buffeting Analysis in Time and Frequency Domains[J].Engineering Mechanics,2005,22(2):179-183.
[6]项海帆,林志兴,鲍卫刚,等.公路桥梁抗风设计指南[M].北京:人民交通出版社,1996.XIANG Hai-fan,LIN Zhi-xing,BAO Wei-gang,et al.Guidelines of Wind Resistance Design for Road Bridges[M].Beijing:China Communications Press,1996.
[7]项海帆,葛耀君,朱乐东,等.现代桥梁抗风理论与实践[M].北京:人民交通出版社,2005.XIANG Hai-fan,GE Yao-jun,ZHU Le-dong,et al.Modern Theory and Practice on Bridge Wind Resistance[M].Beijing:China Communications Press,2005.
[8]SCANLAN R H.The Action of Flexible Bridge Under Wind Ⅱ:Buffeting Theory[J].Sound and Vibration,1978,60(2):201-211.
[9]JAIN A,JONES N P,SCANLAN R H.Coupled Flutter and Buffeting Analysis of Long-span Bridges[J].Journal of Structural Engineering,1996,122(7):716-725.
[10]李永乐.风-车-桥系统非线性空间耦合振动研究[D].成都:西南交通大学,2003.LI Yong-le.Nonlinear Three-dimensional Coupling Vibration of Wind-vehicle-bridge System[D].Chengdu:Southwest Jiaotong University,2003.
[11]刘 崭,董 越.用弯曲能量法确定斜拉桥成桥状态的参数研究[J].筑路机械与施工机械化,2008,28(11):62-63.LIU Zhan,DONG Yue.Research on Parameters of Completion State for Cable-stayed Bridge Determined with Bending Energy Method[J].Road Machinery & Construction Mechanization,2008,28(11):62-63.
[12]张建超,王 军,曹学峰.基于ANSYS的移动模架造桥机结构风振响应分析[J].筑路机械与施工机械化,2007,27(11):41-43.ZHANG Jian-chao,WANG Jun,CAO Xue-feng.Response Analysis of Wind Vibration of Bridge Fabrication Machine Structure with Form on Traveler Based on ANSYS[J].Road Machinery & Construction Mechanization,2007,27(11):41-43.
[13]胡庆安,乔云强,刘健新.MSS62.5移动模架造桥机风洞试验及抗风分析[J].筑路机械与施工机械化,2006,29(10):36-38.HU Qing-an,QIAO Yun-qiang,LIU Jian-xin.Wind Tunnel Test and Anti-wind Analysis for MSS62.5[J].Road Machinery & Construction Mechanization,2006,29(10):36-38.
[14]胡庆安,乔云强,刘健新,等.斜风作用下桥塔施工阶段抖振性能[J].交通运输工程学报,2008,8(2):40-43.HU Qing-an,QIAO Yun-qiang,LIU Jian-xin,et al.Buffeting Performance of Bridge Tower Under Yawed Wind During Construction[J].Journal of Traffic and Transportation Engineering,2008,8(2):40-43.
[15]王统宁,马 麟,刘健新,等.基于混合编程的大跨桥梁桥塔抖振时域分析[J].长安大学学报:自然科学版,2009,29(3):68-72.WANG Tong-ning,MA Lin,LIU Jian-xin,et al.Time-domain Buffeting Analysis of the Tower of Long-span Bridges on the Basis of Mixed Programming[J].Journal of Chang’an University:Natural Science Edition,2009,29(3):68-72.

Memo

Memo:
-
Last Update: 2010-12-20