[1] 周殿文.树状柱框架钢梁拼接处产生塑性铰的设计方法研究[D].西安:西安建筑科技大学,2008.
ZHOU Dian-wen.A Study on Design Method of Plastic Hinge Appear in the Splicing Location of Beam in Column-tree Frame[D].Xi'an:Xi'an University of Architecture and Technology,2008.
[2]吴 涛,刘伯权,邢国华,等.RC框架变梁变柱中节点抗裂性能试验[J].长安大学学报:自然科学版,2009,29(4):77-81.
WU Tao,LIU Bo-quan,XING Guo-hua,et al.Crack Resistance Test of Interior Joints with Abrupt Reduction in Beam and Column Section in Reinforced Concrete Frame[J].Journal of Chang'an University:Natu-
表6 不同侧板厚度模型的初始刚度和承载力指标
Tab.6 Initial Stiffness and Bearing Capacity Indexes of Models with Different Sizes of Beams and Columns
模型编号 K/(kN·mm)K的增量/% My/(kN·m)My的增量/% Mu/(kN·m)Mu的增量/% MuM-1yCBJ1-1A 1.82 -8.5 208.39 -4.3 308.82 -0.3 1.48CBJ1-1 1.99 0.0 217.81 0.0 309.76 0.0 1.42CBJ1-1B 2.08 4.5 223.69 2.7 317.83 2.6 1.42CBJ1-1C 2.18 9.5 229.32 5.3 323.93 4.5 1.41
ral Science Edition,2009,29(4):77-81.
[3]窦祖融,王 怡,薛伟辰.低周反复荷载下装配整体式混凝土框架边节点的抗震性能[J].建筑科学与工程学报,2010,27(2):61-66.
DOU Zu-rong,WANG Yi,XUE Wei-chen.Seismic Performance of Precast Monolithic Concrete Frame Exterior Connections Under Low Cyclic Loading[J].Journal of Architecture and Civil Engineering,2010,27(2):61-66.
[4]袁晓洒,郑 宏,于长亮.钢框架内填钢板深梁协同分析[J].建筑科学与工程学报,2012,29(2):43-47.
YUAN Xiao-sa,ZHENG Hong,YU Chang-liang.Interactive Analysis of Steel Deep Beam Infilling Steel Frame[J].Journal of Architecture and Civil Engineering,2012,29(2):43-47.
[5]郑 宏,杨飞颖,张维刚.钢板深梁屈曲分析[J].建筑科学与工程学报,2007,24(3):31-35.
ZHENG Hong,YANG Fei-ying,ZHANG Wei-gang.Buckling Analysis on Steel Plate Deep Beam[J].Journal of Architecture and Civil Engineering,2007,24(3):31-35.
[6]HOUGHTON D L.Prototype Cyclic Testing of the SidePlateTM Moment Connection System[C]//CUREE.Proceedings of Northridge Earthquake Research Conference.Los Angeles:CUREE,1997:1-12.
[7]SHAO D H,HALE T.Full Scale Testing and Project Application of SidePlateTM Moment Connection for SMRF Using Deep Columns[C]//CUREE.Proceedings of Northridge Earthquake Research Conference.Los Angeles:CUREE,2003.
[8]DEYLAMI A,YAKHCHALIAN M.Behavior of Two-way Steel Moment Connections with Side Plates and Double-I Built-up Columns Under Cyclic Loading[C]//WCEE.Proceedings of the 14th World Conference on Earthquake Engineering.Beijing:WCEE,2008:1-8.
[9]DEYLAMI A,YAKHCHALIAN M.Comparison Between “Common Moment Connection” and Moment Connection with Side Plates for Double-I Built-up Columns[C]//WCEE.Proceedings of the 14th World Conference on Earthquake Engineering.Beijing:WCEE,2008:11-18.