[1] MAINS R M.Measurement of the Distribution of Tensile and Bond Stresses Along Reinforcing Bars[J].ACI Journal of Proceedings,1951,48(11):225-252.
[2]李 宏,付恒菁.钢筋混凝土框架边节点粘结锚固计算分析[J].西安建筑科技大学学报,1998,30(2):130-133.
LI Hong,FU Heng-jing.Calculating Analysis on the Anchorage Bond of Exterior Beam-column Joint[J].Journal of Xi'an University of Architecture & Technology,1998,30(2):130-133.
[3]ABRISHAMI H H,MITCHELL D.Analysis of Bond Stress Distributions in Pullout Specimens[J].Journal of Structural Engineering,1996,122(3):255-261.
[4]TASTANI S P,PANTAZOPOULOU S J.Reinforcement and Concrete Bond:State Determination Along the Development Length[J].Journal of Structural Engineering,2013,139(9):1567-1581.
[5]CIAMPI V,ELIGEHAUSEN R,BERTERO V V,et al.Analytical Model for Concrete Anchorages of Reinforcing Bars Under Generalized Excitations[R].Berkeley:University of California,1982.
[6]FILIPPOU F C.A Simple Model for Reinforcing Bar Anchorages Under Cyclic Excitations[J].Journal of Structural Engineering,1986,112(7):1639-1659.
[7]徐有邻.变形钢筋-混凝土粘结锚固性能的试验研究[D].北京:清华大学,1990.
XU You-lin.Experimental Study on Bond Capability Between Deformed Reinforcement Concrete[D].Beijing:Tsinghua University,1990.
[8]SHIMA H,CHOU L,OKAMURA H.Micro and Macro Models for Bond in Reinforced Concrete[J].Journal of the Faculty of Engineering,1987,39(2):133-194.
[9]SOMAYAJI S,SHAH S P.Bond Stress Versus Slip Relationship and Cracking Response of Tension Members[J].Journal of the American Concrete Institute,1981,78(3):217-225.
[10]GB 50010—2010,混凝土结构设计规范[S].
GB 50010—2010,Code for Design of Concrete Structures[S].
[11]CEB-FIP,Fib Model Code for Concrete Structures 2010[S].
[12]LIN H W,ZHAO Y X,OZBOLT J,et al.Analytical Model for the Bond Stress-slip Relationship of Deformed Bars in Normal Strength Concrete[J].Construction and Building Materials,2019,198:570-586.
[13]ELIGEHAUSEN R,POPOV E P,BERTERO V V.Local Bond Stress-slip Relationships of Deformed Bars Under Generalized Excitations[R].Berkeley:University of California,1983.
[14]WU Y F,ZHAO X M.Unified Bond Stress-slip Model for Reinforced Concrete[J].Journal of Structural Engineering,2013,139(11):1951-1962.
[15]毛达岭.HRB500钢筋粘结锚固性能的试验研究[D].郑州:郑州大学,2004.
MAO Da-ling.Experimental Study on Bond Anchorage Performance of HRB500 Steel Bar[D].Zhengzhou:Zhengzhou University,2004.
[16]牛旭宁.600 MPa级热轧带肋钢筋粘结锚固性能试验研究[D].天津:河北工业大学,2015.
NIU Xu-ning.Bond-anchorage Capability Experimental Research on 600 MPa Hot-ribbed Steel Bar[D].Tianjin:Hebei University of Technology,2015.
[17]HARAJLI M H,HAMAD B S,RTEIL A A.Effect of Confinement on Bond Strength Between Steel Bars and Concrete[J].ACI Structural Journal,2004,101(5):595-603.
[18]ACI 318-19,Building Code Requirements for Structural Concrete and Commentary[S].
[19]ACI 408R-03,Bond and Development of Straight Reinforcing Bars in Tension[S].
[20]GAMBAROVA P G,PLIZZARI G A,BALAZS G L,et al.Bond of Reinforcement in Concrete[R].Stuttgart:International Federation for Structural Concrete,2000.
[21]MAHRENHOLTZ C,SHARMA A.Development Length of Deformed Reinforcing Bars — A Worldwide Review[J].ACI Materials Journal,2020,117(5):125-134.
[22]TASTANI S P,BROKALAKI E,PANTAZOPOULOU S J.State of Bond along Lap Splices[J].Journal of Structural Engineering,2015,141(10):04015007.