[1] LIU Y,GUO Z,DING J,et al.Experimental Study on Seismic Behaviour of Plug-in Assembly Concrete Beam-column Connections[J].Engineering Structures,2020,221:111049.
[2]DING K W,MA L.Pseudo-static Analysis of Fabricated Steel Cage Concrete Frame Structure[C]//AMMME.Proceedings of 2016 International Conference on Applied Mechanics,Mechanical and Materials Engineering.Lancaster:DEStech Publications,2017:332-336.
[3]DING K W,LIU J H,REN J,et al.Dynamic Responses of Cellular Metal-filled Steel Beam-column Joint Under Impact Loading[J].Journal of Shanghai Jiaotong University:Science,2020,25(3):1-10.
[4]丁克伟,陈 东,刘运林,等.一种新型拼缝结构的叠合板受力机理及试验研究[J].土木工程学报,2015,48(10):64-69.
DING Ke-wei,CHEN Dong,LIU Yun-lin,et al.Theoretical and Experimental Study on Mechanical Behavior of Laminated Slabs with New Type Joints[J].China Civil Engineering Journal,2015,48(10):64-69.
[5]丁克伟,韩苗兰,李兴龙.装配式半刚性梁柱螺栓连接节点抗震性试验研究[J].合肥工业大学学报:自然科学版,2020,43(6):805-810.
DING Ke-wei,HAN Miao-lan,LI Xing-long.Experimental Research on Seismic Performance of Semi-rigid Bolted Beam-column Joints[J].Journal of Hefei University of Technology:Natural Science,2020,43(6):805-810.
[6]吴从晓,周 云,赖伟山,等.现浇与预制装配式混凝土框架节点抗震性能试验[J].建筑科学与工程学报,2015,32(3):60-66.
WU Cong-xiao,ZHOU Yun,LAI Wei-shan,et al.Experiment on Seismic Performance of Cast-in-situ and Prefabricated Concrete Frame Structure Joints[J].Journal Architecture and Civil Engineering,2015,32(3):60-66.
[7]WANG H,MARINO E M,PAN P,et al.Experimental Study of a Novel Precast Prestressed Reinforced Concrete Beam-to-column Joint[J].Engineering Structures,2018,156:68-81.
[8]KIM S K,KIM J M,HONG W K.Material Nonlinear Finite Element Analysis of Hybrid Hollow Concrete Beams Encasing Steel Sections[J].Structures,2020,25:500-519.
[9]YANG T Y,DASHLEJEH A A,ARABZADEH A,et al.New Model for Prediction of Ultimate Load of Prestressed RC Deep Beams[J].Structures,2020,23:509-517.
[10]OLIVEIRA J L A,ARAUJO D L,EI DEBS M K,et al.Precast Beam-column Connection Subjected to Cyclic and Dynamic Loadings[J].Structural Engineering International,2017,27(1):114-126.
[11]王清湘,赵国潘,林立岩.高强混凝土柱延性的试验研究[J].建筑结构学报,1995,16(4):22-31.
WANG Qing-xiang,ZHAO Guo-fan,LIN Li-yan.Study on Ductility of Reinforced High Strength Concrete Columns[J].Journal of Building Structures,1995,16(4):22-31.
[12]GB 50011—2010,建筑抗震设计规范[S].
GB 50011—2010,Code for Seismic Design of Buildings.[S].
[13]GB/T 50081—2002,普通混凝土力学性能试验方法标准[S].
GB/T 50081—2002,Standard for Text Method of Mechanical Properties on Ordinary Concrete[S].
[14]GB 50010—2010,混凝土结构设计规范[S].
GB 50010—2010,Code for Design of Concrete Structures[S].
[15]JGJ/T 101—2015,建筑抗震试验规程[S].
JGJ/T 101—2015,Specification for Seismic Test of Buildings[S].
[16]ASHRAF E,TAREK S,SALAH N,et al.Behavior of Extended End-plate Bolted Connections Subjected to Monotonic and Cyclic Loads[J].Engineering Structures,2019,190:142-159.
[17]BRUNESI E,NASCIMBENE R,RASSATI G A.Response of Partially-restrained Bolted Beam-to-column Connections Under Cyclic Loads[J].Journal of Constructional Steel Research,2014,97:24-38.
[18]ZHOU Y,HU X,PEI Y,et al.Dynamic Load Test on Progressive Collapse Resistance of Fully Assembled Precast Concrete Frame Structures[J].Engineering Structures,2020,214:110675.