[1] PARK R.Seismic Design and Construction of Precast Concrete Buildings in New Zealand[J].PCI Journal,2002,47(5):60-75.
[2]KORKMAZ H H,TANKUT T.Performance of a Precast Concrete Beam-to-beam Connection Subject to Reversed Cyclic Loading[J].Engineering Structures,2005,27(9):1392-1407.
[3]张 瀑,鲁兆红,淡 浩.汶川地震中预制装配整体结构的震害调查分析[J].四川建筑科学研究,2010,36(3):129-133.
ZHANG Pu,LU Zhao-hong,DAN Hao.The Survey Analysis of Prefabricated Structure in Wenchuan Earthquake[J].Sichuan Building Science,2010,36(3):129-133.
[4]预制装配整体式钢筋混凝土技术规范:SJG 18—2009[S].北京:中国建筑工业出版社,2009.
Technical Specification for Concrete Structures with Precast Components:SJG 18—2009[S].Beijing:China Architecture & Building Press, 2009.
[5]预制预应力混凝土装配整体式框架结构技术规程:JGJ 224—2010[S].北京:中国建筑工业出版社,2010.
Technical Specification for Framed Structures Comprised of Precast Prestressed Concrete Components:JGJ 224—2010[S].Beijing:China Architecture & Building Press, 2010.
[6]NEHPR Recommended Provisions for the Development of Seismic Regulations for New Buildings and Other Structures:FEMA 368/369[S].Washington DC:BSSC,2000.
[7]张立波.高层建筑设计施工规范与新技术应用实务全书[M].北京:海洋出版社,2000.
ZHANG Li-bo.Construction Specification for Design of High-rise Buildings and New Technology Application Guidelines[M].Beijing:Ocean Press,2000.
[8]赵 斌,吕西林,刘丽珍.全装配式预制混凝土结构梁柱组合件抗震性能试验研究[J].地震工程与工程振动,2005,25(1):81-87.
ZHAO Bin,Lü Xi-lin,LIU Li-zhen.Experimental Study on Seismic Behavior of Precast Concrete Beam-column Subassemblage with Fully Assembled Joint[J].Earthquake Engineering and Engineering Dynamics,2005,25(1):81-87.
[9]谷 伟,张馨心,李忠培,等.装配式框架结构新型梁柱节点抗震性能试验[J].工业建筑,2019,49(5):57-61.
GU Wei,ZHANG Xin-xin,LI Zhong-pei,et al.Experimental Research on Seismic Behavior of New Column-to-beam Joints for Prefabricated Concrete Frame[J].Industrial Construction,2019,49(5):57-61.
[10]吴 刚,冯德成.装配式混凝土框架节点基本性能研究进展[J].建筑结构学报,2018,39(2):1-16.
WU Gang,FENG De-cheng.Research Progress on Fundamental Performance of Precast Concrete Frame Beam-to-column Connections[J].Journal of Building Structures,2018,39(2):1-16.
[11]管东芝,郭正兴,于建兵,等.钢绞线锚入式预制砼框架节点构造及试验[J].浙江大学学报(工学版),2016,52(2):282-291.
GUAN Dong-zhi,GUO Zheng-xing,YU Jian-bing,et al.Structural Measures and Experimental Study of Precast Concrete Joints of Anchored Prestressing Strands in Frames[J].Journal of Zhejiang University(Engineering Science),2016,52(2):282-291.
[12]KHOO J H,LI B,YIP W K.Tests on Precast Concrete Frames with Connections Constructed Away from Column Faces:Engineering Science[J].ACI Structural Journal,2006,103(1):1827.
[13]章一萍,隗 萍,张春雷,等.新型装配式混凝土框架结构后浇整体式梁柱节点研究[J].四川建筑科学研究,2017,43(3):110-115.
ZHANG Yi-ping,WEI Ping,ZHANG Chun-lei,et al.Study on New Cast-in-situ Monolithic Beam-column Connections for Precast Frame Structure[J].Sichuan Building Science,2017,43(3):110-115.
[14]袁鑫杰,李 易,陆新征,等.湿式连接装配式混凝土框架抗连续倒塌静力试验研究[J].土木工程学报,2019,52(12):46-56.
YUAN Xin-jie,LI Yi,LU Xin-zheng,et al.Static Progressive Collapse Test on Prefabricated Concrete Frames with Wet Connections[J].China Civil Engineering Journal,2019,52(12):46-56.
[15]RESTREPO J I,PARK R,BUCHANAN A H.Tests on Connections of Earthquake Resisting Precast Reinforced Concrete Perimeter Frames of Buildings[J].PCI Journal,1995,40(4):44-61.
[16]YEE A A.Design Considerations for Prestressed Concrete Building Structures in Seismic Areas[J].PCI Journal,1991,36(3):40-55.
[17]陈宜虎,卢 旦,张 敏,等.装配式混凝土梁柱节点U型钢筋环扣连接性能研究[J].广西大学学报(自然科学版),2019,44(6):1552-1561.
CHEN Yi-hu,LU Dan,ZHANG Min,et al.Study on Ring Buckle Connection with U-shaped Steel in Precast Concrete Beam-column Joints[J].Journal of Guangxi University(Natural Science Edition),2019,44(6):1552-1561.
[18]混凝土结构设计规范:GB 50010—2010[S].北京:中国建筑工业出版社,2010.
Code for Design of Concrete Structures:GB 50010—2010[S].Beijing:China Architecture & Building Press,2010.
[19]建筑抗震设计规范:GB 50011—2010[S].北京:中国建筑工业出版社,2010.
Code for Seismic Design of Buildings:GB 50011—2010[S].Beijing:China Architecture & Building Press,2010.
[20]建筑抗震试验规程:JGJ/T 101—2015[S].北京:中国建筑工业出版社,2015.
Specification for Building Seismic Test of Buildings:JGJ/T 101—2015[S].Beijing:China Architecture & Building Press,2015.