Calculating Method for Amplitude Difference Coefficient of Budget Quota for Steel Plate Composite Beam Bridges(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2022年02期
Page:
128-134
Research Field:
桥梁工程
Publishing date:

Info

Title:
Calculating Method for Amplitude Difference Coefficient of Budget Quota for Steel Plate Composite Beam Bridges
Author(s):
CHEN Xiao1 HOU Bo2 HU Lei2 LIU Yong-jian1 SHI Xiao-li1 LU Li-wei1
(1. School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China; 2. Shaanxi Transportation Engineering Cost Affairs Center, Xi'an 710075, Shaanxi, China)
Keywords:
bridge engineering steel plate composite beam bridge measurement of construction quota compiling of budget quota amplitude difference coefficient analytic hierarchy process
PACS:
U445.2
DOI:
10.19815/j.jace.2021.11054
Abstract:
In order to fill the gap of budget quotas in the field of China highway engineering, provide a research basis for the technical and economic analysis of steel plate composite beam bridges, and further promote this bridge, the compilation method of budget quota of steel plate composite beam bridge was studied. The manufacturing process of steel beam of steel plate composite beam bridge was divided by using work breakdown structure(WBS)analysis method. Combining the literature research and support project, the basic information such as quota unit, project content, and quota sub-items of the budget quota were determined. The compilation method of construction quota was devised by integrating technical measurement method and comparative analogy method, and the field investigation was carried out on three steel structure enterprises to determine the consumption items and consumption of labor, materials, and machinery. Introducing the concept of efficiency coefficient of American engineering management, it was determined that the specific value range amplitude difference coefficient was [1.23,1.75]. By comparing with the existing statistical data and analyzing the difference, the rationality of the value range of the amplitude difference coefficient was verified. According to the analytic hierarchy process, the hierarchical model of the amplitude difference coefficient was established, and the relative weight of the theoretical influencing factors of the amplitude difference coefficient under the specific project was determined by constructing the judgment matrix and scoring the importance. Finally, it was determined that the value of the mechanical amplitude difference coefficient was 1.45, and the value of the manual amplitude difference coefficient was 1.33. The results show that the study improves the budget quota preparation method of steel plate composite beam bridge.

References:

[1] 刘永健,高诣民,周绪红,等.中小跨径钢-混凝土组合梁桥技术经济性分析[J].中国公路学报,2017,30(3):1-13.
LIU Yong-jian,GAO Yi-min,ZHOU Xu-hong,et al.Technical and Economic Analysis in Steel-concrete Composite Girder Bridges with Small and Medium Span[J].China Journal of Highway and Transport,2017,30(3):1-13.
[2]程观奇.钢板组合梁桥设计参数适应性与技术经济性分析[D].西安:长安大学,2019.
CHENG Guan-qi.Analysis of Design Parameter Adaptability and Technical Economy of Steel Plate Composite Girder Bridge[D].Xi'an:Chang'an University,2019.
[3]孙 艺.基于神经网络技术的公路工程补充定额的编制与研究[D].长沙:长沙理工大学,2011.
SUN Yi.Establishment and Research of Additional Quota for Highway Engineering Based on Artificial Neural Networks[D].Changsha:Changsha University of Science & Technology,2011.
[4]张 凯.中小跨径钢板组合梁桥快速建造技术与应用研究[D].西安:长安大学,2016.
ZHANG Kai.Research on the Accelerated Construction Technology and the Application of Composite Steel Plate Girder Bridge with Medium-small Span[D].Xi'an:Chang'an University,2016.
[5]张瑑芳.基于美国标准图的钢板组合梁桥结构设计与规范对比[D].西安:长安大学,2018.
ZHANG Zhuan-fang.Structural Design and Specification Comparison of Steel Composite Plate Girder Based on Standard Drawings in American[D].Xi'an:Chang'an University,2018.
[6]张轩瑜.双工字形钢-预制混凝土板组合梁桥静力性能研究[D].西安:长安大学,2019.
ZHANG Xuan-yu.Research on the Static Performance of Twin-Ⅰ Steel-composite Girder Bridges with Precast Concrete Deck Panel[D].Xi'an:Chang'an University,2019.
[7]KRAUSE S.Steel Bridge Design Handbook:Steel Bridge Fabrication[R].Washington DC:Federal Highway Administration,2012.
[8]MELHEM H G,RODDIS W M K,NAGARAJA S,et al.Knowledge Acquisition and Engineering for Steel Bridge Fabrication[J].Journal of Computing in Civil Engineering,1996,10(3):248-256.
[9]GARLICH M J,PECHILLO T H,SCHNEIDER J M,et al.Engineering for Structural Stability in Bridge Construction[R].Washington DC:Federal Highway Administration,2015.
[10]周绪红,刘永健.钢桥[M].北京:人民交通出版社,2020.
ZHOU Xu-hong,LIU Yong-jian.Steel Bridges[M].Beijing:China Communications Press,2020.
[11]石勇民.公路工程定额原理与估价[M].北京:人民交通出版社,2004.
SHI Yong-min.Quota Principle and Estimating of Highway Engineering[M].Beijing:China Communications Press,2004.
[12]李 栋.总体幅度差系数计算方法在公路预算定额编制过程中应用[D].长沙:长沙理工大学,2009.
LI Dong.Calculation Method of Overall Magnitude Difference Coefficient Applied in the Process of the Road Budget Quota[D].Changsha:Changsha University of Science & Technology,2009.
[13]公路工程施工定额测定与编制规程:JTG/T 3811—2020[S].北京:人民交通出版社,2020.
Measurement and Compiling Methods of Construction Quota for Highway Engineering:JTG/T 3811—2020[S].Beijing:China Communications Press,2020.
[14]张永财,钟勇华,李婕妤.港珠澳大桥钢结构工程加工预算补充定额研究[J].科技创新导报,2018,15(21):68-70.
ZHANG Yong-cai,ZHONG Yong-hua,LI Jie-yu.Research on Supplementary Quota of Processing Budget for Steel Structure Engineering of Hong Kong-Zhuhai-Macao Bridge[J].Science and Technology Innovation Herald,2018,15(21):68-70.
[15]王首绪,李 栋,胡汉渝,等.基于层次分析法的公路预算定额幅度差计算模型的设计与实现[J].中外公路,2009,29(1):260-263.
WANG Shou-xu,LI Dong,HU Han-yu,et al.Design and Realization of Calculation Model of Highway Budget Quota Range Difference Based on Analytic Hierarchy Process[J].Journal of China & Foreign Highway,2009,29(1):260-263.
[16]王首绪,陈海南,李 栋,等.公路预算定额综合扩大系数区间拟定方法研究[J].长沙交通学院学报,2008,24(3):49-52.
WANG Shou-xu,CHEN Hai-nan,LI Dong,et al.The Method for the Study of Synthetical Expansion Coefficient Interval About the Road Budget Quota[J].Journal of Changsha Communications University,2008,24(3):49-52.
[17]公路工程预算定额:JTG/T 3832—2018[S].北京:人民交通出版社,2018.
Measurement and Compiling Methods of Construction Quota for Highway Engineering:JTG/T 3832—2018[S].Beijing:China Communications Press,2018.
[18]Headquarters Department of the Army.Utilization of Engineering Construction Equipment Volume B(TM 5-331B)[R].Washington DC:Department of the Army,1968.
[19]PEURIFOY R,OBERLENDER G.Estimating Construction Costs[R].New York:McGraw-Hill,2014.
[20]滕伟玲.高速公路养护工程预算定额及合理费用研究[D].西安:长安大学,2012.
TENG Wei-ling.Study on the Budget Quota and Reasonable Expenses of Highway Maintenance Engineering[D].Xi'an:Chang'an University,2012.
[21]VAIDYA O S,KUMAR S.Analytic Hierarchy Process:An Overview of Applications[J].European Journal of Operational Research,2006,169(1):1-29.
[22]SAATY T L.Decision Making with the Analytic Hierarchy Process[J].International Journal of Services Sciences,2008,1(1):83-98.
[23]CHENG E W L,LI H.Analytic Hierarchy Process[J].Measuring Business Excellence,2001,5(3):30-37.
[24]SAATY R W.The Analytic Hierarchy Process — What It Is and How It Is Used[J].Mathematical Modelling,1987,9(3/4/5):161-176.
[25]SAATY T L.How to Make a Decision:The Analytic Hierarchy Process[J].European Journal of Operational Research,1990,48(1):9-26.