[1] 陈建勋,刘伟伟,陈丽俊,等.绿泥石片岩地层大跨度公路隧道大变形控制及合理支护形式现场试验[J].中国公路学报,2020,33(12):212-223.
CHEN Jian-xun,LIU Wei-wei,CHEN Li-jun,et al.In-situ Experimental Study on Large-deformation Control and Reasonable Support Forms for a Large-span Highway Tunnel in Chlorite Schist[J].China Journal of Highway and Transport,2020,33(12):212-223.
[2]陈培帅,王 伟,吴忠仕,等.浅埋大跨度黄土隧道变形特征及控制措施研究[J].现代隧道技术,2021,58(1):203-211.
CHEN Pei-shuai,WANG Wei,WU Zhong-shi,et al.Study on Deformation Characteristics and Control Measures of Shallow Large-span Loess Tunnels[J].Modern Tunnelling Technology,2021,58(1):203-211.
[3]梁 琨,王树欣,张宪堂,等.大跨度小净距隧道爆破振动响应研究[J].爆破,2021,38(2):67-72,159.
LIANG Kun,WANG Shu-xin,ZHANG Xian-tang,et al.Response of Large-span Tunnel to Blasting Vibration of Small Clear Spacing Tunnel Excavation[J].Blasting,2021,38(2):67-72,159.
[4]罗基伟,张顶立,房 倩,等.超大跨度隧道预应力锚杆-锚索协同支护机理[J].中国铁道科学,2020,41(5):71-82.
LUO Ji-wei,ZHANG Ding-li,FANG Qian,et al.Combined Support Mechanism of Pretensioned Rock Bolt and Anchor Cable for Super-large-span Tunnel[J].China Railway Science,2020,41(5):71-82.
[5]何发亮,王石春.铁路隧道围岩分级方法研究及发展[J].铁道工程学报,2005,22(增1):392-397.
HE Fa-liang,WANG Shi-chun.Research and Development on the Method of Rockmasses Classification in Railway Tunnel[J].Journal of Railway Engineering Society,2005,22(S1):392-397.
[6]王春雨,宋 昆.格罗皮乌斯与工业化住宅[J].河北建筑科技学院学报,2005,22(2):20-23.
WANG Chun-yu,SONG Kun.Gropius with Industrialized Building[J].Journal of Hebei Institute of Architectural Science and Technology,2005,22(2):20-23.
[7]刘惠敏.地下铁道明挖区间装配式衬砌力学特性研究[D].成都:西南交通大学,2003.
LIU Hui-min.Study on the Mechanics Characters of the Fabricated Linings in the Subway Constructed by Open-cut Method[D].Chengdu:Southwest Jiaotong University,2003.
[8]王德超,王国富,乔 南,等.预制装配式结构在地下工程中的应用及前景分析[J].中国科技论文,2018,13(1):115-120.
WANG De-chao,WANG Guo-fu,QIAO Nan,et al.The Application and Prospect Analysis of Prefabricated Construction in Underground Engineering[J].China Sciencepaper,2018,13(1):115-120.
[9]周佳媚,高 波,李志业.TBM施工隧道仰拱预制块的力学特性研究[J].岩土力学,2004,25(12):1973-1976,1980.
ZHOU Jia-mei,GAO Bo,LI Zhi-ye.Study on Mechanical Characteristics of Precast Block of Inverted Arch for TBM Construction Tunnel[J].Rock and Soil Mechanics,2004,25(12):1973-1976,1980.
[10]周佳媚,李志业,高 波.TBM施工隧道仰拱预制块的受力分析[J].中国铁道科学,2004,25(3):32-35.
ZHOU Jia-mei,LI Zhi-ye,GAO Bo.Mechanic Analysis of Invert Prefabricate in TBM Construction Tunnel[J].China Railway Science,2004,25(3):32-35.
[11]章龙管,李志刚,路桂珍,等.大断面马蹄形盾构施工关键技术:以蒙华铁路白城隧道工程为例[J].隧道建设(中英文),2020,40(增1):297-306.
ZHANG Long-guan,LI Zhi-gang,LU Gui-zhen,et al.Key Construction Technology of Large Cross-section Horseshoe-shaped Shield:A Case Study on Baicheng Tunnel on Menghua Railway[J].Tunnel Construction,2020,40(S1):297-306.
[12]朱合华,黄伯麒,李晓军,等.盾构衬砌管片接头内力-变形统一模型及试验分析[J].岩土工程学报,2014,36(12):2153-2160.
ZHU He-hua,HUANG Bo-qi,LI Xiao-jun,et al.Unified Model for Internal Force and Deformation of Shield Segment Joints and Experimental Analysis[J].Chinese Journal of Geotechnical Engineering,2014,36(12):2153-2160.
[13]CHEN J S,MO H H.Mechanical Behavior of Segment Rebar of Shield Tunnel in Construction Stage[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering),2008,9(7):888-899.
[14]杨秀仁.我国预制装配式地铁车站建造技术发展现状与展望[J].隧道建设(中英文),2021,41(11):1849-1870.
YANG Xiu-ren.Development Status of and Outlook for Construction Technology for Prefabricated Metro Stations in China[J].Tunnel Construction,2021,41(11):1849-1870.
[15]赵有明,王志伟,王子洪.铁路隧道预制装配式建造技术研究与展望[J].中国铁路,2020(12):51-60.
ZHAO You-ming,WANG Zhi-wei,WANG Zi-hong.Research and Prospect on Prefabricated Structure of Railway Tunnel[J].China Railway,2020(12):51-60.
[16]宋英杰.穿越高速公路超浅埋垂直叠落管廊隧道建造沉降机理及控制技术研究[D].北京:北京交通大学,2020.
SONG Ying-jie.Research on the Settlement Mechanism and Control Technology in the Construction of Ultra-shallow Buried Vertical Stacked Utility Tunnel Crossing Expressway[D].Beijing:Beijing Jiaotong University,2020.
[17]李 铁.大断面地铁隧道暗挖新工法的研究及应用[D].北京:北京交通大学,2018.
LI Tie.The Research and Application of New Excavation Method for Large Section Subway Tunnel[D].Beijing:Beijing Jiaotong University,2018.
[18]雷震宇,周顺华.浅埋大跨度隧道临时支撑的拆除分析[J].工程力学,2006,23(9):120-124.
LEI Zhen-yu,ZHOU Shun-hua.Analysis of Dismantling Temporary Support of Shallow-depth Large-span Tunnel[J].Engineering Mechanics,2006,23(9):120-124.
[19]周磊生,孙会彬,孔 军,等.CD和CRD法施工下超大断面隧道围岩变形控制数值计算研究[J].公路交通技术,2018,34(增1):66-69,75.
ZHOU Lei-sheng,SUN Hui-bin,KONG Jun,et al.Experimental Research Study on Surrounding Rock Control Mechanism of Super Large Section Tunnel Under CD and CRD Method[J].Technology of Highway and Transport,2018,34(S1):66-69,75.
[20]赵鹏社.关于大断面隧道施工CRD工法的优化[J].铁道建筑,2010,50(8):77-80.
ZHAO Peng-she.Optimization of CRD Construction Method for Large Section Tunnel Construction[J].Railway Engineering,2010,50(8):77-80.
[21]姚红伟,王 薇.浅埋暗挖隧道CRD工法优化与现场试验研究[J].铁道科学与工程学报,2018,15(6):1509-1515.
YAO Hong-wei,WANG Wei.Study of Optimal Proposal and Field Test for CRD Excavation Method of Shallow-buried Tunnel[J].Journal of Railway Science and Engineering,2018,15(6):1509-1515.
[22]杨 招,黄强兵,肖双全,等.地裂缝场地地铁隧道施工CRD工法优化研究[J].工程地质学报,2021,29(2):516-525.
YANG Zhao,HUANG Qiang-bing,XIAO Shuang-quan,et al.Study on Optimization of CRD Construction Method for Metro Tunnel Through Ground Fissure Site[J].Journal of Engineering Geology,2021,29(2):516-525.
[23]韩 赟,刘国庆,李世才,等.超前双导洞隧道开挖工法的研究与应用[J].现代隧道技术,2013,50(5):38-44.
HAN Yun,LIU Guo-qing,LI Shi-cai,et al.Study and Application of the Double Pilot Tunnel Construction Method[J].Modern Tunnelling Technology,2013,50(5):38-44.
[24]陈林杰,谭绪凯,艾振喜.泥岩地质条件下浅埋特大断面隧道施工方法优化研究[J].施工技术,2014,43(23):121-124.
CHEN Lin-jie,TAN Xu-kai,AI Zhen-xi.Study on Construction Technology Optimization of Shallow-buried Super-large Section Tunnel in the Mudstone Geology Condition[J].Construction Technology,2014,43(23):121-124.
[25]郭 杰.改进的双侧壁导坑法施工安全性分析[J].隧道建设,2014,34(6):525-533.
GUO Jie.Analysis on Construction Safety of Optimized Double Side Drift Method[J].Tunnel Construction,2014,34(6):525-533.
[26]李祥东,王 伟.地铁浅埋隧道双侧壁导坑法预留核心岩柱施工技术[J].隧道建设,2015,35(10):1060-1065.
LI Xiang-dong,WANG Wei.Case Study on Construction of Shallow Metro Tunnel by Double Side Heading Method with Core Rock Kept[J].Tunnel Construction,2015,35(10):1060-1065.
[27]尚友磊,谭 准.广州地铁流花路站超大断面暗挖工法优化[J].现代隧道技术,2019,56(3):177-185.
SHANG You-lei,TAN Zhun.Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro[J].Modern Tunnelling Technology,2019,56(3):177-185.
[28]卞正涛.新型连拱工法与双侧壁导坑法同条件应用对比分析[J].建筑技术,2021,52(8):937-941.
BIAN Zheng-tao.Comparison and Analysis on Applications of New Double-arch Construction Method and Double-side Heading Method Under Same Conditions[J].Architecture Technology,2021,52(8):937-941.