[1] 黄彩萍.混合梁斜拉桥钢混结合段受力性能的试验研究与理论分析[D].武汉:华中科技大学,2012.
HUANG Cai-ping.Experimental Study and Theoretical Analysis of Mechanical Behavior of Steel-concrete Joint Section of Hybrid Girder Cable-stayed Bridge[D].Wuhan:Huazhong University of Science and Technology,2012.
[2]周 阳.大跨度铁路混合梁斜拉桥钢-混结合段静力和疲劳性能研究[D].成都:西南交通大学,2016.
ZHOU Yang.Study on Static Behavior and Fatigue Performance of Steel-concrete Joint Section of Long-span Railway Hybrid Girder Cable-stayed Bridge[D].Chengdu:Southwest Jiaotong University,2016.
[3]苏庆田,秦 飞.新型混合梁桥结构体系及设计参数[J].同济大学学报(自然科学版),2013,41(6):799-805.
SU Qing-tian,QIN Fei.A New Type Hybird-beam Bridge Structural System and its Design Parameters[J].Journal of Tongji University(Natrural Science),2013,41(6):799-805.
[4]施 洲,顾家昌,周勇聪.铁路混合梁斜拉桥钢混结合段研究综述[J].中国铁道科学,2022,43(2):48-59.
SHI Zhou,GU Jia-chang,ZHOU Yong-cong.Research Review on Steel-concrete Composite Joint of Railway Hybrid Girder Cable-stayed Bridge [J].China Railway Science,2022,43(2):48-59.
[5]王军文,倪章军,李建中,等.石板坡长江大桥钢混结合段局部应力分析[J].公路交通科技,2007,24(8):99-102.
WANG Jun-wen,NI Zhang-jun,LI Jian-zhong,et al.Analysis on Local Stress of Steel-concrete Beam Linked Part of Shibanpo Bridge[J].Journal of Highway and Transportation Research and Development,2007,24(8):99-102.
[6]胡建华,蒲怀仁.PBL剪力键钢混结合段设计与试验研究[J].钢结构,2007,22(2):62-68.
HU Jian-hua,PU Huai-ren.Design and Test of the Joint Part of Steel-concrete Girder Bridge with PBL Shear Connector[J].Steel Construction,2007,22(2):62-68.
[7]秦凤江,周绪红,梁博文,等.大跨度自锚式悬索桥主梁钢-混结合段模型试验[J].中国公路学报,2018,31(9):52-64.
QIN Feng-jiang,ZHOU Xu-hong,LIANG Wen-bo,et al.Expetimental on Steel-concrete Joint of Hybrid Girder of a Long-span Self-anchored Suspension Bridge [J].China Journal of Highway and Transport,2018,31(9):52-64.
[8]施 洲,顾家昌,余万庆,等.大跨度斜拉桥双向曲面混合桥塔钢-混结合段受力性能研究[J].中国公路学报,2022,35(6):73-85.
SHI Zhou,GU Jia-chang,YU Wan-qing,et al.Study on the Mechanical Behavior of Bi-directionally Curved Composite Pylon Steel-concrete Joints for a Long-span Cable-stayed Bridge [J].China Journal of Highway and Transport,2022,35(6):73-85.
[9]李小珍,肖 林,黄 玲,等.混合梁斜拉桥钢-混结合段静力行为[J].哈尔滨工业大学学报,2013,45(6):75-82.
LI Xiao-zhen,XIAO Lin,HUANG Ling,et al.Static Mechanical Behavior of Steel-concrete Joint Section of Hybrid Beam Cable-stayed Bridges[J].Journal of Harbin Institute of Technology,2013,45(6):75-82.
[10]张景峰,李小珍,肖 林,等.混合梁斜拉桥钢-混结合段受力行为仿真分析[J].西南交通大学学报,2014,49(4):619-625,699.
ZHANG Jing-feng,LI Xiao-zhen,XIAO Lin,et al.Numerical Simulation Analysis of Steel-concrete Joint Section in Hybrid Girder of Cable-stayed Bridge[J].Journal of Southwest Jiaotong University,2014,49(4):619-625,699.
[11]YANG S L,PU Q H,SHI Z,et al.Mechanical Behavior of Steel-concrete Composite Joints in Railway Hybrid Cable-stayed Bridges[J].Journal of Constructional Steel Research,2020,173:106242.
[12]HE S H,MOSALLAM A S,FANG Z,et al.Structural Evaluation of Steel-concrete Joint with UHPC Grout in Single Cable-plane Hybrid Cable-stayed Bridges[J].Journal of Bridge Engineering,2019,24(4):04019022.
[13]姚亚东,么超逸,杨永清.铁路斜拉桥钢混结合段的收缩徐变行为分析[J].铁道学报,2020,42(7):148-154.
YAO Ya-dong,YAO Chao-yi,YANG Yong-qing.Time-dependent Creep and Shrinkage Analysis of Steel-concrete Composite Segment of Cable-stayed Railway Bridge[J].Journal of the China Railway Society,2020,42(7):148-154.
[14]YAO Y D,YAN M,SHI Z,et al.Mechanical Behavior of an Innovative Steel-concrete Joint for Long-span Railway Hybrid Box Girder Cable-stayed Bridges[J].Engineering Structures,2021,239:112358.
[15]KIM S H,LEE C G,KIM S J,et al.Experimental Study on Joint of Spliced Steel-PSC Hybrid Girder,Part II:Full-scale Test of Spliced Hybrid I-girder[J].Engineering Structures,2011,33(9):2668-2682.
[16]张 凯,刘永健,琚明杰,等.无格室钢-混结合段构造形式与受力性能分析[J].公路交通科技,2016,33(4):73-79,95.
ZHANG Kai,LIU Yong-jian,JU Ming-jie,et al.Analysis of Structural Types and Mechanical Performance in Steel-concrete Connections Without Cell[J].Journal of Highway and Transportation Research and Development,2016,33(4):73-79,95.
[17]周 阳,蒲黔辉,施 洲,等.混合梁斜拉桥钢-混结合段剪力连接件群力学性能研究[J].铁道学报,2017,39(10):134-141.
ZHOU Yang,PU Qian-hui,SHI Zhou,et al.Study on Mechanical Behavior of Group Shear Connectors for Steel-concrete Composite Joint of Hybrid Girder Cable-stayed Bridge [J].Journal of the China Railway Society,2017,39(10):134-141.
[18]XIAO L,LI X Z,JOHN MA Z.Behavior of Perforated Shear Connectors in Steel-concrete Composite Joints of Hybrid Bridges[J].Journal of Bridge Engineering,2017,22(4):04016135.
[19]HE J,LIU Y Q,PEI B Z.Experimental Study of the Steel-concrete Connection in Hybrid Cable-stayed Bridges[J].Journal of Performance of Constructed Facilities,2014,28(3):559-570.
[20]DI J,ZOU Y,ZHOU X H,et al.Push-out Test of Large Perfobond Connectors in Steel-concrete Joints of Hybrid Bridges[J].Journal of Constructional Steel Research,2018,150:415-429.
[21]ZOU Y,DI J,ZHOU J T,et al.Shear Behavior of Perfobond Connectors in the Steel-concrete Joints of Hybrid Bridges[J].Journal of Constructional Steel Research,2020,172:106217.
[22]ZOU Y,ZHENG K D,ZHOU J T,et al.Mechanical Behavior of Perfobond Connector Group in Steel-concrete Joint of Hybrid Bridge[J].Structures,2021,30:925-936.
[23]HE S H,FANG Z,FANG Y W,et al.Experimental Study on Perfobond Strip Connector in Steel-concrete Joints of Hybrid Bridges[J].Journal of Constructional Steel Research,2016,118:169-179.
[24]HE S H,FANG Z,MOSALLAM A S.Push-out Tests for Perfobond Strip Connectors with UHPC Grout in the Joints of Steel-concrete Hybrid Bridge Girders[J].Engineering Structures,2017,135:177-190.
[25]吴游宇,邓淑飞.贵黔高速鸭池河大桥主梁结构受力行为分析[J].世界桥梁,2016,44(4):71-75.
WU You-yu,DENG Shu-fei.Analysis of Load Bearing Behavior of Main Girder Structure of Yachi River Bridge on Guiyang-Qianxi Expressway[J].World Bridges,2016,44(4):71-75.