|Table of Contents|

Practical prediction method and application of shield disc cutter wear in complex formation(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2023年01期
Page:
133-141
Research Field:
基础工程
Publishing date:

Info

Title:
Practical prediction method and application of shield disc cutter wear in complex formation
Author(s):
GONG Zejia1 YU Zhihong2 ZHANG Dingwen13 FENG Shuo2 LI Zhaoguo2
(1. School of Transportation, Southeast University, Nanjing 211189, Jiangsu, China; 2. China Construction Eighth Engineering Division Rail Transit Construction Co., Ltd., Nanjing 210046, Jiangsu, China; 3. National Demonstration Center for Experimental Road and Traffic Engineering Education, Southeast University, Nanjing 211189, Jiangsu, China)
Keywords:
complex formation shield disc cutter abrasive wear wear volume calculation
PACS:
TU973.2
DOI:
10.19815/j.jace.2021.09009
Abstract:
In the process of shield tunneling in complex formation, shield machine often has problems such as reduced tunneling efficiency and tool failure due to excessive tool wear. Based on the disc cutter wear data of Baiying section of Shenzhen Metro Line 13, a practical prediction method of disc cutter wear was proposed according to Rabinowicz abrasive wear calculation model. The method combined the slip rate calculation formula, the cutter head torque and cutter head thrust to obtain the sliding distance of the disc cutter. The normal load of contact surface was determined by combining the Colorado School of Mining Model(CSM Model), rock strength parameters and the penetration depth of the disc cutter, and the material strength was determined according to the design parameters of the disc cutter. By determining three main factors(sliding distance, normal load of contact surface and material strength)affecting disc cutter wear, the calculation formula of disc cutter wear volume considering shield machine was derived, and the measured wear volume of disc cutter and the predicted wear volume of disc cutter in composite stratum section of Baiying section of Shenzhen Metro Line 13 were compared and verified. The results show that the measured wear volume is in good agreement with the prediction values, which verifies the rationality of the proposed prediction method of cutter wear volume. The research results can provide a theoretical basis for the prediction of cutter wear volume and the determination of cutter change time in composite strata.

References:

[1] 吴 俊,袁大军,李兴高,等.盾构刀具磨损机理及预测分析[J].中国公路学报,2017,30(8):109-116,142.
WU Jun,YUAN Dajun,LI Xinggao,et al.Analysis on wear mechanism and prediction of shield cutter[J].China Journal of Highway and Transport,2017,30(8):109-116,142.
[2]吴 俊.盾构刀具与岩土体力学相互作用及磨损研究[D].北京:北京交通大学,2020.
WU Jun.Study on the mechanical interaction and wear between shield cutting tools and rock or soil[D].Beijing:Beijing Jiaotong University,2020.
[3]罗 华.基于TBM施工的关角隧道岩石耐磨性研究[D].成都:西南交通大学,2007.
LUO Hua.The Research of rock resistance to abrasion in guanjiao tunnel based on the TBM construction[D].Chengdu:Southwest Jiaotong University,2007.
[4]赵海鸣,舒 标,夏毅敏,等.基于磨料磨损的TBM滚刀磨损预测研究[J].铁道科学与工程学报,2014,11(4):152-158.
ZHAO Haiming,SHU Biao,XIA Yimin,et al.Study of wear prediction for TBM cutter based on abrasive wear model[J].Journal of Railway Science and Engineering,2014,11(4):152-158.
[5]SU W L,LI X G,JIN D L,et al.Analysis and prediction of TBM disc cutter wear when tunneling in hard rock strata:a case study of a metro tunnel excavation in Shenzhen,China[J].Wear,2020,446/447:203190.
[6]EVANS I,POMEROY C D.The strength,fracture and workability of coal[M].Oxford:Pergamon Press,1966.
[7]TOSABURO A.A theory of the rock-breaking function of the disc cutter[J].Komatsu Technology,1970,16(3):56-61.
[8]ROXBOROUGH F F,PHILLIPS H R.Rock excavation by disc cutter[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1975,12(12): 361-366.
[9]SANIO H P.Prediction of the performance of disc cutters in anisotropic rock[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1985,22(3):153-161.
[10]AGRAWAL A K,CHATTOPADHYAYA S,MURTHY V M S R.Delineation of cutter force and cutter wear in different edge configurations of disc cutters — an analysis using discrete element method[J].Engineering Failure Analysis,2021,129:105727.
[11]JIN D L,YUAN D J,LI X G,et al.Probabilistic analysis of the disc cutter failure during TBM tunneling in hard rock[J].Tunnelling and Underground Space Technology,2021,109:103744.
[12]王 超,乔世范,刘红中.TBM破岩过程的滚刀受力计算模型研究[J].工程力学,2021,38(10):54-63.
WANG Chao,QIAO Shifan,LIU Hongzhong.Research on force calculation model of hob in TBM rock breaking process[J].Engineering Mechanics,2021,38(10):54-63.
[13]乔世范,王 超,刘志新,等.基于磨粒磨损机理的全断面隧道掘进机滚刀寿命预测[J].吉林大学学报(工学版),2020,50(6):2068-2073.
QIAO Shifan,WANG Chao,LIU Zhixin,et al.Life prediction of tunnel boring machine hob based on abrasive wear mechanism[J].Journal of Jilin University(Engineering and Technology Edition),2020,50(6):2068-2073.
[14]龚秋明,王继敏,佘祺锐.锦屏二级水电站1#,3#引水隧洞TBM施工预测与施工效果对比分析[J].岩石力学与工程学报,2011,30(8):1652-1662.
GONG Qiuming,WANG Jimin,SHE Qirui.Comparison of TBM performance prediction with actual TBM operation results in headrace tunnels No.1 and No.3 of Jinping Ⅱ hydropower station[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1652-1662.
[15]石 超,薛皓文,丁小彬.基于BP神经网络的硬岩地层盾构滚刀磨损预测[J].现代隧道技术,2020,57(增1):217-225.
SHI Chao,XUE Haowen,DING Xiaobin.Prediction of cutter wear of shield machine in hard rock stratum based on BP neural network[J].Modern Tunnelling Technology,2020,57(S1):217-225.
[16]祝和意,杨延栋,陈 馈.盾构滚刀破岩力及磨损速率预测模型推导[J].现代隧道技术,2016,53(5):131-136,144.
ZHU Heyi,YANG Yandong,CHEN Kui.Breaking force derivation and wear rate forecast of shield disc cutters[J].Modern Tunnelling Technology,2016,53(5):131-136,144.
[17]李彬嘉,晏启祥,黄 杰,等.基于CSM模型的盾构机滚刀受力及磨损规律[J].中国铁道科学,2020,41(6):91-99.
LI Binjia,YAN Qixiang,HUANG Jie,et al.Mechanical characteristics and wear laws of disc cutters of shield machine based on CSM model[J].China Railway Science,2020,41(6):91-99.
[18]RABINOWICZ E.Friction and wear of materials[M].2nd ed.New York:Wiley-interscience,2013.
[19]秦银平,张竹清,孙振川,等.基于现场试验的TBM滚刀磨损分析及预测[J].隧道建设,2019,39(11):1914-1921.
QIN Yinping,ZHANG Zhuqing,SUN Zhenchuan,et al.Analysis and prediction of TBM disc cutter wear based on field test[J].Tunnel Construction,2019,39(11):1914-1921.
[20]黑色金属硬度及强度换算值:GB/T 1172—1999[S].北京:中国标准出版社,2005.
Conversion of hardness and strength for ferrous metal:GB/T 1172—1999[S].Beijing:Standards Press of China,2005.
[21]WANG L H,LI H P,ZHAO X J,et al.Development of a prediction model for the wear evolution of disc cutters on rock TBM cutterhead[J].Tunnelling and Underground Space Technology,2017,67:147-157.
[22]WANG L H,KANG Y L,ZHAO X J,et al.Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis[J].Tunnelling and Underground Space Technology,2015,50:324-333.
[23]POPOV V L.Contact mechanics and friction[M].Berlin:Springer,2017.
[24]刘东燕.岩石力学[M].重庆:重庆大学出版社,2014.
LIU Dongyan.Rock mechanics[M].Chongqing:Chongqing University Press,2014.

Memo

Memo:
-
Last Update: 2023-01-01