|Table of Contents|

Model test study on mechanical characteristics of surrounding rock of long-span double-arch tunnel underpassing existing subway close-spaced construction(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2023年06期
Page:
137-147
Research Field:
桥梁工程
Publishing date:

Info

Title:
Model test study on mechanical characteristics of surrounding rock of long-span double-arch tunnel underpassing existing subway close-spaced construction
Author(s):
WENG Xiaolin1 CHEN Yuxun1 JIA Jinchang2 SHI Shaohua2 QIN Chengwei1 HOU Lele1
(1. School of Highway, Chang'an University, Xi'an 710064, Shannxi, China; 2. Xi'an Fengdong Municipal Engineering Construction Co. Ltd., Xi'an 710086, Shannxi, China)
Keywords:
tunnel engineering long-span double-arch tunnel underpass subway model test surrounding rock mechanical response
PACS:
U456
DOI:
10.19815/j.jace.2022.08064
Abstract:
Based on the existing subway structure that underpassing the section of metro line 5 of Fenghe east road municipal passageway project in Xi'an as the engineering background. The model test and finite element numerical simulation were used to study the mechanical characteristic response process of underground double-arch tunnel. The results show that with the excavation of long-span double-arch tunnel, the surface settlement presents three stages of slow increase, sharp increase and tend to be stable, and the corresponding surface settlement value is the largest at the middle partition wall, which should be strengthened monitoring and timely control of surface deformation. The change of vertical stress in vault can also present three stages of stress accumulation, stress release and stable state, and the pressure arch will be formed in a certain range to bear the upper load. The amplitude of excavation disturbance of the side wall is larger than that of the vault. The vertical stress concentration and horizontal stress release of the side wall are mainly in the range of 0.3 times to 0.5 times the span of single hole excavation. Therefore, some surrounding rocks should be reinforced by grouting in time. The test and numerical calculation results show that the stress curves of the upper and lower surfaces of the U-groove track plate are “W-shaped” and “inverted W-shaped”, and the maximum settlement and warping of the track plate appear at -0.9D to 0.9D(D is the single tunnel excavation span), where the maximum tension and compression stress occurs.The research results provide a theoretical basis for the design and construction of the tunnel, and also provide a good reference value for the construction of similar projects in the future.

References:

[1] 周丁恒,曹力桥,王晓形,等.浅埋大断面大跨度连拱隧道支护体系现场监测试验研究[J].岩土工程学报,2010,32(10):1573-1581.
ZHOU Dingheng,CAO Liqiao,WANG Xiaoxing,et al.In-situ tests on lining system of double-arch tunnel with shallow large section and span[J].Chinese Journal of Geotechnical Engineering,2010,32(10):1573-1581.
[2]张春洪,李世鑫,王元森,等.软弱地层浅埋大跨双连拱隧道支护结构受力现场监测试验研究[J].土木工程学报,2017,50(增2):51-57.
ZHANG Chunhong,LI Shixin,WANG Yuansen,et al.Study on structure stress of large-span shallow-buried double-arch tunnel in weak stratum by in situ monitoring test[J].China Civil Engineering Journal,2017,50(S2):51-57.
[3]叶 飞,丁文其,朱合华,等.连拱隧道中隔墙现场监测及分析研究[J].地下空间与工程学报,2007,3(3):470-474.
YE Fei,DING Wenqi,ZHU Hehua,et al.Site monitoring and analysis of middle wall of multi-arch highway tunnel[J].Chinese Journal of Underground Space and Engineering,2007,3(3):470-474.
[4]申玉生,赵玉光.偏压连拱隧道围岩变形的现场监测与分析研究[J].公路,2005,50(4):194-198.
SHEN Yusheng,ZHAO Yuguang.Site monitoring and analysis research on surrounding rock deformation of a biased double-arch tunnel[J].Highway,2005,50(4):194-198.
[5]杨果林,葛云龙,彭 伟,等.连拱隧道复合式曲中墙受力现场监测分析[J].华中科技大学学报(自然科学版),2019,47(1):55-59.
YANG Guolin,GE Yunlong,PENG Wei,et al.In-situ testing analysis of compound curved middle wall of multi-arch tunnel[J].Journal of Huazhong University of Science and Technology(Natural Science Edition),2019,47(1):55-59.
[6]LI S C,YUAN C,FENG X D,et al.Mechanical behaviour of a large-span double-arch tunnel[J].KSCE Journal of Civil Engineering,2016,20(7):2737-2745.
[7]李树忱,袁 超,李术才,等.极浅埋连拱隧道施工过程围岩力学行为的模型试验研究[J].煤炭学报,2012,37(5):713-718.
LI Shuchen,YUAN Chao,LI Shucai,et al.Model test study on mechanical behavior of extremely shallow double-arch tunnel during excavation[J].Journal of China Coal Society,2012,37(5):713-718.
[8]白浪峰,徐前卫,田龙岗,等.软弱破碎连拱隧道松动区模型试验与分析[J].岩石力学与工程学报,2013,32(增2):3610-3618.
BAI Langfeng,XU Qianwei,TIAN Longgang,et al.Model test and analysis of loose zone in soft and cracked surrounding rock of multi-arch tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(S2):3610-3618.
[9]肖林萍,赵玉光,申玉生.双连拱隧道结构内力样式及围岩稳定性模型试验研究[J].岩石力学与工程学报,2005,24(23):4346-4351.
XIAO Linping,ZHAO Yuguang,SHEN Yusheng.Model experimental study on style of structural internal force and stability of surrounding rock in double-arch tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(23):4346-4351.
[10]李新志.超浅埋大跨度连拱隧道围岩受力分析及工程应用研究[D].济南:山东大学,2013.
LI Xinzhi.Study on surrouding rock and applying in engineering of super shallow large-span double-arch tunnel[D].Jinan:Shandong University,2013.
[11]刘 涛,沈明荣,陶履彬,等.连拱隧道动态施工模型试验与三维数值仿真模拟研究[J].岩石力学与工程学报,2006,25(9):1802-1808.
LIU Tao,SHEN Mingrong,TAO Lubin,et al.Model test and 3D numerical simulation study on excavation of double-arch tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(9):1802-1808.
[12]YANG S,DAI R,AI Z B,et al.Analytical solutions for the mechanical responses of shallow double-arched tunnel subjected to symmetric loads[J].Advances in Civil Engineering,2021(1):1-33.
[13]YOSHIMURA H,YUKI T,YAMADA Y,et al.Analysis and monitoring of the Miyana railway tunnel constructed using the new Austrian tunnelling method[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1986,23(1):67-75.
[14]张 浩,施成华,彭立敏,等.浅埋多连拱隧道下穿管廊施工方案比选研究[J].地下空间与工程学报,2020,16(增1):147-154.
ZHANG Hao,SHI Chenghua,PENG Limin,et al.Study on comparison and selection of construction schemes of concealed digging down through the pipe gallery in the shallow buried multi-arch tunnel[J].Chinese Journal of Underground Space and Engineering,2020,16(S1):147-154.
[15]胡志平,刘佳琪,任 翔,等.黄土地区浅埋暗挖地铁连拱隧道合理错距研究[J].铁道工程学报,2020,37(9):60-65.
HU Zhiping,LIU Jiaqi,REN Xiang,et al.Research on the reasonable staggered distance of tunnel in shallow excavated metro arch tunnel in the loess area[J].Journal of Railway Engineering Society,2020,37(9):60-65.
[16]WANG S R,LI C L,WANG Y G,et al.Evolution characteristics analysis of pressure-arch in a double-arch tunnel[J].Tehnicki Vjesnik,2016,23(1):181-189.
[17]季毛伟,吴顺川,高永涛,等.双连拱隧道施工监测及数值模拟研究[J].岩土力学,2011,32(12):3787-3795.
JI Maowei,WU Shunchuan,GAO Yongtao,et al.Construction monitoring and numerical simulation of multi-arch tunnel[J].Rock and Soil Mechanics,2011,32(12):3787-3795.
[18]白家设,赵绍鹏,齐 兵,等.软弱地层浅埋大跨双连拱隧道支护结构变形研究[J].土木工程学报,2017,50(增2):45-50.
BAI Jiashe,ZHAO Shaopeng,QI Bing,et al.Study on the structure deformation of large-span shallow-buried multi-arch tunnel in soft stratum[J].China Civil Engineering Journal,2017,50(S2):45-50.
[19]ALTAEE A,FELLENIUS B H.Physical modeling in sand[J].Canadian Geotechnical Journal,1994,31(3):420-431.
[20]刘新荣,刘 俊,黄伦海,等.黄土连拱隧道开挖的模型试验与压力拱分析[J].浙江大学学报(工学版),2018,52(6):1140-1149.
LIU Xinrong,LIU Jun,HUANG Lunhai,et al.Model test and pressure arch analysis for excavation of loess double arch tunnel[J].Journal of Zhejiang University(Engineering Science),2018,52(6):1140-1149.

Memo

Memo:
-
Last Update: 2023-12-01