|Table of Contents|

Analysis of influence of double-line shield tunnel excavation on adjacent bridge piles(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2024年02期
Page:
134-142
Research Field:
桥隧工程
Publishing date:

Info

Title:
Analysis of influence of double-line shield tunnel excavation on adjacent bridge piles
Author(s):
LIANG Han
(China Railway First Survey and Design Institute Group Co., Ltd., Xi'an 710043, Shaanxi, China)
Keywords:
shield tunnel side-crossing pile foundation influence factor numerical simulation
PACS:
TU311.2
DOI:
10.19815/j.jace.2022.03125
Abstract:
In order to study the influence of shield tunnel crossing the existing bridge pile closely, based on the engineering example of Hohhot metro line 1 crossing the drum tower overpass pile, the numerical model was established by ABAQUS, and the Mohr-Coulomb elastic-plastic theory was used to compare and analyze the influence factors of pile length, pile diameter, tunnel depth and pile top load. The results show that under the influence of soil disturbance in tunnel excavation, with the increase of pile length, pile diameter and pile top load, the horizontal displacement of the three piles are gradually reduced, and the bending moment of pile I and pile III are gradually increased. Since the pile II is located between the two tunnels, the bending moment of the pile is offset by the superposition effect of the left and right tunnels during the excavation, so that the bending moment of the pile does not change regularly. With the increase of the buried depth of the tunnel, the horizontal displacements of the three piles do not change regularly, but the bending moment of the piles increase significantly, and the maximum bending moment of the piles is within the range of the buried depth of the tunnel. When the buried depth of the tunnel is shallow, the excavation influence range is small, and the influence on the adjacent piles is small. Grouting reinforcement can effectively control the horizontal displacement of pile foundation and ground subsidence during tunnel excavation, but the control effect of horizontal displacement of pile foundation decreases with the decrease of net distance between shield tunnel and pile foundation.

References:

[1] 魏新江,洪 杰,魏 纲.双圆盾构施工引起邻近桩基附加荷载的分析[J].岩土力学,2013,34(3):783-790.
WEI Xinjiang,HONG Jie,WEI Gang.Analysis of additional load on adjacent pile foundation induced by double-o-tube shield tunnel construction[J].Rock and Soil Mechanics,2013,34(3):783-790.
[2]袁海平,王 斌,朱大勇,等.盾构近距侧穿高架桥桩的施工力学行为研究[J].岩石力学与工程学报,2014,33(7):1457-1464.
YUAN Haiping,WANG Bin,ZHU Dayong,et al.Mechanical behaviours of a shield tunnel adjacent to existing viaduct pile foundations[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(7):1457-1464.
[3]黄 戡,孙逸玮,杨伟军,等.基于渗流应力耦合的盾构隧道开挖对邻近桥梁桩基的影响[J].中南大学学报(自然科学版),2021,52(3):983-993.
HUANG Kan,SUN Yiwei,YANG Weijun,et al.Influence of shield tunneling on pile foundation of adjacent bridge using fluid-soil coupling theory[J].Journal of Central South University(Science and Technology),2021,52(3):983-993.
[4]刘 枫.隧洞开挖对邻近桩基影响的数值分析[D].大连:大连理工大学,2007.
LIU Feng.Numerical analysis of the influence of adjacent pile foundation caused by tunneling[D].Dalian:Dalian University of Technology,2007.
[5]魏世广.不同竖向荷载作用下盾构施工引起的邻近桩基响应研究[D].郑州:河南工业大学,2020.
WEI Shiguang.Response of adjacent pile foundation caused by shield excavation under different vertical loads[D].Zhengzhou:Henan University of Technology,2020.
[6]张邦通,王步翔,曹亚鹏.盾构隧道反复近接侧穿诱发高架桥桩及地层的变形分析[J].大连交通大学学报,2019,40(4):98-103.
ZHANG Bangtong,WANG Buxiang,CAO Yapeng.Analysis of pile and stratum deformation of viaduct induced by repeated close connection of shield tunnel[J].Journal of Dalian Jiaotong University,2019,40(4):98-103.
[7]张峻铭.盾构侧穿桥桩及公路工程风险数值模拟分析与研究[D].大连:大连理工大学,2017.
ZHANG Junming.Shield worn bridge and highway engineering risk analysis and research on numerical simulation[D].Dalian:Dalian University of Technology,2017.
[8]郑熹光.盾构隧道施工对邻近桩基础位移和受力特性的影响研究[D].北京:北京交通大学,2015.
ZHENG Xiguang.Study on the displacement and stress characteristics of pile foundations due to shield tunnel construction[D].Beijing:Beijing Jiaotong University,2015.
[9]布亚芳,孙 琳,刘 柳,等.土压平衡盾构近距离侧穿高架桥桥墩的受力与变形[J].重庆交通大学学报(自然科学版),2018,37(9):23-27.
BU Yafang,SUN Lin,LIU Liu,et al.Force and deformation of EPBS passing alongside viaduct pier at close distance[J].Journal of Chongqing Jiaotong University(Natural Science),2018,37(9):23-27.
[10]漆伟强,匡亚洲,杨志勇,等.砂卵石地层盾构近距离侧穿匝道桥桩变形研究[J].地下空间与工程学报,2018,14(增2):679-687,793.
QI Weiqiang,KUANG Yazhou,YANG Zhiyong,et al.Study on the deformation of pile foundations of the ramp bridge induced by side-crossing shield construction in sandy cobble stratum[J].Chinese Journal of Underground Space and Engineering,2018,14(S2):679-687,793.
[11]杨 博.地铁盾构隧道近接施工对既有桥梁桩基力学行为的影响分析[D].重庆:重庆交通大学,2018.
YANG Bo.Analysis on mechanical influence of adjacent construction of metro shield tunnel on existing bridge pile foundation[D].Chongqing:Chongqing Jiaotong University,2018.
[12]丰土根,况梦祥,沈正伟,等.双线盾构隧道侧穿既有桥桩影响分析及加固优化[J].河北工程大学学报(自然科学版),2021,38(3):55-62.
FENG Tugen,KUANG Mengxiang,SHEN Zhengwei,et al.Analysis of influence of double-track shield tunnel side-crossing existing bridge piles and optimization of bridge pile reinforcement[J].Journal of Hebei University of Engineering(Natural Science Edition),2021,38(3):55-62.
[13]徐 硕,朱永全,徐 强,等.近距侧穿高铁桥桩盾构施工影响规律及加固措施[J].科学技术与工程,2021,21(31):13545-13551.
XU Shuo,ZHU Yongquan,XU Qiang,et al.Influence and reinforcement measures of shield construction of pile foundation for high-speed railway bridge in short distance[J].Science Technology and Engineering,2021,21(31):13545-13551.
[14]周文涛,张 鹏,吴薪柳.北京地铁14号线侧穿京津城际铁路桥桩地基预加固技术分析[J].城市轨道交通研究,2019,22(4):86-90.
ZHOU Wentao,ZHANG Peng,WU Xinliu.Bridge pile foundation pre-reinforcement technology for Beijing metro line 14 side-crossing Beijing-Tianjin intercity railway[J].Urban Mass Transit,2019,22(4):86-90.
[15]罗 船.浅埋隧道开挖过程诱发邻近桩基变形机理研究[D].重庆:重庆大学,2019.
LUO Chuan.Study on deformation mechanism of adjacent pile induced by shallow tunnel excavation[D].Chongqing:Chongqing University,2019.
[16]邢世玲,叶见曙,姚晓励.桥梁桩基础有限元模型构建思路与应用[J].特种结构,2010,27(2):77-80,76.
XING Shiling,YE Jianshu,YAO Xiaoli.Establishing conception and application of the finite element model of bridge's piles foundation[J].Special Structures,2010,27(2):77-80,76.
[17]高能祥,方 健.m法和有限元法对桥梁桩基的计算探讨[J].城市道桥与防洪,2021(7):272-275,299,26.
GAO Nengxiang,FANG Jian.Discussion on calculation of bridge pile foundation by m method and finite element method[J].Urban Roads Bridges & Flood Control,2021(7):272-275,299,26.

Memo

Memo:
-
Last Update: 2024-03-25